background image

 

Operating Instructions 

 

Operating Instructions 

 

Please also refer to chapter 

General Notes

 
 

Switching the Industrial PC on and off 

Switch on 

The Industrial PC is switched on with the power pushbutton behind the 
front flap. The main switch at the rear of the housing has to be switched on 
before. 
 

Shutting down and 
switching off 

The Industrial PC is switched off when either of these switches is off. 
 
Control software such as is typically used on Industrial PCs permits various 
users to be given different rights. A user who may not close software may 
also not switch the Industrial PC off, since data can be lost from the hard 
disk by switching off while software is running. 
 

 

Warning

 

First shut down, then switch off the PC! 

If the Industrial PC is switched off as the software is writing a file to the 
hard disk, the file will be destroyed. Control software typically writes 
something to the hard disk every few seconds, so that the probability of 
causing damage by switching off while the software is running is very high. 
 

 

Warning

 

When you have shut down the Industrial PC, you have to switch off power 
supply for at least 10 seconds before rebooting the system. 
After resetting power supply the PC will start booting automatically. 
 

 

 

First switching on and driver installation 

 

When you switch on the Industrial PC for the first time, the pre-installed 
operating system (optional) will be started. In this case, all the required 
drivers for any additional, optional hardware components ordered with the 
PC will already have been installed. 
 
If the PC was ordered without operating system, you have to install the 
operating system and the driver software for any auxiliary hardware 
yourself. Please follow the instructions in the documentation for the 
operating system and the additional devices. 

 

C5101 

13 

Содержание C5101

Страница 1: ...Installation and Operating instructions for 19 Inch Rack Mount Industrial PC C5101 Version 1 5 Date 2008 06 09...

Страница 2: ......

Страница 3: ...pushbutton 9 Installation Instructions 10 Transport and Installation 10 Transport 10 Unpacking 10 Installation 10 Power Supply Connection 11 Mains Socket 11 Power supply cords 11 Connecting devices 1...

Страница 4: ...Table of contents 6 7 Assembly dimensions 17 Appendix 18 Technical data 18 Approvals 18 FCC Federal Communications Commission Radio Frequency Interference Statement 18 FCC Canadian Notice 18 2 C5101...

Страница 5: ...ing of 443 BGB of the German Civil Code or a statement about the contractually expected fitness for a particular purpose in the meaning of 434 par 1 sentence 1 BGB In the event that it contains techni...

Страница 6: ...oupled from the plant Pulling out the fieldbus connection plug uncouples the PC optional Items of equipment that have been switched off must be secured against being switched on again The Industrial P...

Страница 7: ...ional regulations depending on the machine type Depending on the type of machine and plant in which the Industrial PC is being used there will be national regulations for the control of such machines...

Страница 8: ...pening the front flap In order to gain access to the power pushbutton and to the drives open the flap on the front with the key provided for the purpose see photo above Rear view of the C5101 Warning...

Страница 9: ...plug in cards see following photograph Removing the card holder Remove the 2 fastening screws of the card holder see arrows using a cross head screwdriver The holder can then be lifted up View of the...

Страница 10: ...5 connector 4 allows the PC to be connected to a 10 100BASE T Local Area Network LAN DVI Digital Visual Interface DVI I The DVI connection 5 is used for transferring the video signal DVI I standard is...

Страница 11: ...EDs Power The LED Power 2 indicates correct power supply HDD The LED HDD 3 indicates HDD access USB interfaces USB4 USB5 The two USB interfaces 4 are used to connect peripheral devices with USB connec...

Страница 12: ...ion the unit must be allowed to slowly adjust to room temperature Should condensation occur a delay time of approximately 12 hours must be allowed before the unit is switched on Unpacking Proceed as f...

Страница 13: ...upply Socket at the PC housing Power supply cords Power cords Europe In the area Europe you use the provided cable with inlet connector for non heating apparatus to connect the Industrial PC to the po...

Страница 14: ...en connecting the cables to the Industrial PC proceed according to the following sequence Switch off all the devices that are to be connected Disconnect all the devices that are to be connected from t...

Страница 15: ...the hard disk the file will be destroyed Control software typically writes something to the hard disk every few seconds so that the probability of causing damage by switching off while the software is...

Страница 16: ...used batteries according to the manufacturer s instructions Servicing The Industrial PC requires no maintenance if it is used in an environment where dust levels are low If the Industrial PC is used...

Страница 17: ...r cause Check power supply cable Call Beckhoff Service The Industrial PC does not boot fully CD in drive Setup settings are incorrect Other cause Remove CD and press any key Check the setup settings C...

Страница 18: ...erstra e 5 33415 Verl Germany Phone 49 0 5246 963 0 Fax 49 0 5246 963 198 e mail info beckhoff com Beckhoff Support Beckhoff offers you comprehensive technical assistance helping you not only with the...

Страница 19: ...imensions The following page show diagrams of the Industrial PC with dimensions in mm Warning The assembly of the unit must take place with the orientation diagrammed here Industrie PC C5101 Front vie...

Страница 20: ...or atmospheric humidity and shock resistance are to be observed during transport and storage as in operation The shock resistance during transport can be improved by means of suitably packing the Indu...

Отзывы: