background image

General Notes 

 

 

 
 

Basic safety measures 

Only switch the PC off after 
closing the software 

Before the Industrial PC is switched off, software that is running must 
be properly closed. 

 

Otherwise it is possible that data on the hard disk is lost. Please read the 
section on 

Switching the Industrial PC on and off

 

 

Warning

 

 

Switch off all parts of the equipment, then uncouple the fieldbus! 

Before opening the housing of the PC, and whenever the PC is being used 
for purposes other than plant control, such as during functional tests 
following repair, all parts of the equipment must first be switched off, after 
which the Industrial PC can be uncoupled from the plant. 

 

Pulling out the fieldbus connection plug uncouples the PC (optional). 

 

Items of equipment that have been switched off must be secured against 
being switched on again. 

 

 

 

 

The Industrial PC’s power supply unit must be supplied with 100 V

AC 

-

 240 V

AC

 

 

Danger

 

 

Do not open the power supply unit while voltage is applied! 

The supply voltage must be switched off before the power supply unit 
housing is opened. 

 

 

 

Do not exchange any parts when under power! 

When components are being fitted or removed, the supply voltage must be 
switched off. 

 

Fitting work on the Industrial PC can result in damage: 

• 

If metal objects such as screws or tools fall onto operating circuit 
boards. 

• 

If connecting cables internal to the PC are removed or inserted 
during operation. 

• 

If plug-in cards are removed or inserted when the PC is switched 
on. 

 

 

4

 

C5101 

Содержание C5101

Страница 1: ...Installation and Operating instructions for 19 Inch Rack Mount Industrial PC C5101 Version 1 5 Date 2008 06 09...

Страница 2: ......

Страница 3: ...pushbutton 9 Installation Instructions 10 Transport and Installation 10 Transport 10 Unpacking 10 Installation 10 Power Supply Connection 11 Mains Socket 11 Power supply cords 11 Connecting devices 1...

Страница 4: ...Table of contents 6 7 Assembly dimensions 17 Appendix 18 Technical data 18 Approvals 18 FCC Federal Communications Commission Radio Frequency Interference Statement 18 FCC Canadian Notice 18 2 C5101...

Страница 5: ...ing of 443 BGB of the German Civil Code or a statement about the contractually expected fitness for a particular purpose in the meaning of 434 par 1 sentence 1 BGB In the event that it contains techni...

Страница 6: ...oupled from the plant Pulling out the fieldbus connection plug uncouples the PC optional Items of equipment that have been switched off must be secured against being switched on again The Industrial P...

Страница 7: ...ional regulations depending on the machine type Depending on the type of machine and plant in which the Industrial PC is being used there will be national regulations for the control of such machines...

Страница 8: ...pening the front flap In order to gain access to the power pushbutton and to the drives open the flap on the front with the key provided for the purpose see photo above Rear view of the C5101 Warning...

Страница 9: ...plug in cards see following photograph Removing the card holder Remove the 2 fastening screws of the card holder see arrows using a cross head screwdriver The holder can then be lifted up View of the...

Страница 10: ...5 connector 4 allows the PC to be connected to a 10 100BASE T Local Area Network LAN DVI Digital Visual Interface DVI I The DVI connection 5 is used for transferring the video signal DVI I standard is...

Страница 11: ...EDs Power The LED Power 2 indicates correct power supply HDD The LED HDD 3 indicates HDD access USB interfaces USB4 USB5 The two USB interfaces 4 are used to connect peripheral devices with USB connec...

Страница 12: ...ion the unit must be allowed to slowly adjust to room temperature Should condensation occur a delay time of approximately 12 hours must be allowed before the unit is switched on Unpacking Proceed as f...

Страница 13: ...upply Socket at the PC housing Power supply cords Power cords Europe In the area Europe you use the provided cable with inlet connector for non heating apparatus to connect the Industrial PC to the po...

Страница 14: ...en connecting the cables to the Industrial PC proceed according to the following sequence Switch off all the devices that are to be connected Disconnect all the devices that are to be connected from t...

Страница 15: ...the hard disk the file will be destroyed Control software typically writes something to the hard disk every few seconds so that the probability of causing damage by switching off while the software is...

Страница 16: ...used batteries according to the manufacturer s instructions Servicing The Industrial PC requires no maintenance if it is used in an environment where dust levels are low If the Industrial PC is used...

Страница 17: ...r cause Check power supply cable Call Beckhoff Service The Industrial PC does not boot fully CD in drive Setup settings are incorrect Other cause Remove CD and press any key Check the setup settings C...

Страница 18: ...erstra e 5 33415 Verl Germany Phone 49 0 5246 963 0 Fax 49 0 5246 963 198 e mail info beckhoff com Beckhoff Support Beckhoff offers you comprehensive technical assistance helping you not only with the...

Страница 19: ...imensions The following page show diagrams of the Industrial PC with dimensions in mm Warning The assembly of the unit must take place with the orientation diagrammed here Industrie PC C5101 Front vie...

Страница 20: ...or atmospheric humidity and shock resistance are to be observed during transport and storage as in operation The shock resistance during transport can be improved by means of suitably packing the Indu...

Отзывы: