11
4. INSTALLATION
This system is designed to be installed by adequately trained and instructed personnel. The entire
system must be installed by qualified personnel in full compliance with standards of workmanship and
with applicable standards and regulations.
ATTENTION:
During installation operations use appropriate items of personal protection equipment.
4.1.
Choice of installation position for the main vacuum unit
The choice of installation position must be based on these criteria:
•
The BEAM
Commercial
vacuum unit must be installed indoors in well-ventilated rooms, preferably
in a service room on the lowest floor of the building, like a garage or technical utilities room, or in
external locations, provided that the vacuum unit is always protected against bad weather.
•
The selected position must have a clear and well-lit space around the main vacuum unit, so as to
facilitate maintenance and repair operations.
•
The main vacuum unit must not be installed in rooms where:
- there is a source of heat in the immediate vicinity
- ambient temperature can reach values lower than 5°C and above 35°C
- humidity is very high or flooding may occur
- flammable or explosive products are present
•
The installation position must permit the fitting of air exhaust pipes no longer than five metres with
Ø63 mm pipes. After this distance, Ø80 mm pipes must be used.
4.2. Installation of the BEAM
Commercial
central vacuum unit
This unit has been designed for easy and convenient installation.
The vacuum unit must be positioned respecting the clearance distances indicated in Figure 5. There
must be a space of 5 cm on each side of the vacuum unit, and a space of 25 cm to the rear.
In these installation conditions, the suction inlet is 70 cm above floor level and 25 cm from the rear
wall. The air exhaust outlet is 150 cm above the floor and also 25 cm from the rear wall.
The BEAM
Commercial
vacuum unit must now be connected to the suction pipes of the system and to
the air exhaust pipe, using the rubber hoses with metallic fixing clamps provided.
IMPORTANT:
•
For the air exhaust pipe, the first five metres must consist in Ø63 mm pipes. After the first five
metres, pipe diameter must be increased to Ø80 mm.
4.3. Electrical connections
Complete installation without connecting the vacuum unit to the mains electrical system.
After connecting the air pipes, the main electrical power supply must be connected to the machine,
using a single-phase 230 V supply for models BC126A and BC126M and a triple-phase 400 V supply
for models BC238A and BC238M.
To complete installation, connect the low-volt wires.
Содержание Commercial
Страница 19: ...19 ...