Be Modern EARDF16NG Скачать руководство пользователя страница 7

200646_01 

 

HOLE.  THESE  CONNECTORS  ARE  FACTORY  FITTED  AND  CANNOT  BE  RE-
ATTACHED  ON  SITE.  GREAT  CARE  SHOULD  BE  TAKEN  TO  KEEP  THE  MULTI-

CORE  FAN  CABLE  CLEAR  OF  ANY 
COMPONENTS  LIKELY  TO  BECOME 
HOT IN USE. 

Fit  the  flue  spigot  to  the  fan  box 

using  the  three  self-tapping  screws 
provided.  

Insert  the  fan  box  in  to  the  wall  as 

far  as  it  will  go  and  fix  it  in  to  place  by 
screwing out the 3 bolts (1 in the top, 2 in 
the bottom) into the masonry to clamp the 
box  in  position.  Using  the  3  bolts,  adjust 
the position of the box so that the fan box 
duct  surrounds  equally  on  all  four  sides 
the duct of the firebox.  

  

Note: In some cases the 'frog' of the 

brick may prevent the clamping bolts from 

being able to be tightened fully. In this case the clamping plate supplied should be inserted 
in the appropriate position and the clamping bolts tightened on to this. 

Take the glass fibre rope-sealing gasket and push it into the gap between the flue duct and 
the fan  box  spigot.  The  gasket  can be pushed  into  the  gap  using a  screwdriver  but  care 
must be taken not to push the gasket in too far. It need only be pushed in to a point where 
the edge of the gasket is level with the inner flue duct.  

Secure the cable gland to its bracket on the fan carrier (See Figure 7) and then connect 
the power cable using the 'Molex' snap connectors. Replace the fan carrier and its gasket 
into  the  fan  box  and  secure  in  place  by  locating  the  'keyhole'  slots  over  the  pan  head 
screws  at  the  rear  of  the  box  and  using  the  two  lower  self  tapping  screws  to  secure  the 
bottom of the carrier in position. Finally tighten the two pan head screws. Any excess cable 
should be pushed in to the cavity. 

Run a bead of mastic around the frame of the wall box to ensure a water tight seal with the 
brickwork. 

Refit the wallbox cover. 

FITTING THE SURFACE MOUNTING ADAPTER BOX 

In cases where the fan unit is to be fitted on the surface of an outside wall an adapter box 
will have to be fitted. The adapter box should be fitted after the hole for the flue duct has 
been made. This will ensure correct alignment between the flue duct and the fan box. 

Place the adapter box against the wall, ensuring it is correctly aligned with the flue spigot 
and mark the position of the four fixing holes on the wall (See Figures 3 & 8) Drill and plug 
the wall in the appropriate positions. Remove the four M5 screws at the rear of the box and 
retain for use later. 

 

 

 

 

 

 

 

 

FIGURE 6 

FIGURE 5 

Содержание EARDF16NG

Страница 1: ...TE GARDE Radiant HE Power flue gas fire MODEL NUMBERS EARDF16NG EARDF16P INSTALLATION SERVICING AND USER INSTRUCTIONS THESE INSTRUCTIONS MUST REMAIN WITH THE USER 0120 THIS APPLIANCE MEETS THE REQUIRE...

Страница 2: ...your fire 16 28 Assembling the fire and laying ceramic coals pebbles 17 Guarantee 17 Installation Service Record 19 Important Notes Please read before undertaking the installation 1 This is not a Do i...

Страница 3: ...in a separate box which is inside the adapter box carton Any extra ducting elbows and fitting components will be packed in a separate carton 1 APPLIANCE DATA EARDF16NG EARDF16P GAS TYPE NATURAL GAS P...

Страница 4: ...lage test there is no requirement for purpose made ventilation into the room containing the appliance See Section 14 5 FLUE TERMINAL POSITION The minimum distances permissible from the flue terminal t...

Страница 5: ...ed the floor of the recess to the level of the hearth to allow accurate fitting of the firebox 4 Cut a hole through the cavity wall to accept the flue duct The centre line for the duct is 483mm 19 abo...

Страница 6: ...Care should be taken to sleeve the pipe when passing through masonry 3 Connect the pipe to the burner at the isolation pressure test elbow using the nut and olive provided 4 When routing the gas supp...

Страница 7: ...oint where the edge of the gasket is level with the inner flue duct 7 Secure the cable gland to its bracket on the fan carrier See Figure 7 and then connect the power cable using the Molex snap connec...

Страница 8: ...ce the spacer against the wall ensuring it is correctly aligned with the flue duct and mark the position of the four fixing holes on the wall See Figure 7 Drill and plug the wall at these positions Ch...

Страница 9: ...the underside of the burner unit to the mating plug on the switch panel of the fire See Figure 9 4 Place the burner tray in position within the firebox The tabs on either side of the rear of the burne...

Страница 10: ...itch 2 Connect the electrical mains supply to the appliance turn on the gas supply and switch on the fire 3 From outside block the flue opening on the fan unit Initially the fan should be heard to spe...

Страница 11: ...est firmly against the rear ceramic ROW C Place five large pebbles along the top of the raised slotted part of the base ceramic at the front of the burner These pebbles should be positioned so that th...

Страница 12: ...he controller will shut down the whole system In this event the fire will go out and will only relight if the ON switch on the switch panel is pressed When first switched on the fan may pulse between...

Страница 13: ...ft brush 4 Badly damaged coals pebbles should be replaced Replacement fuel pieces are available from our stockists 5 Check that there is no impairment to the electrode spark or pilot burner 6 Check th...

Страница 14: ...ith an electronic control unit that monitors the behaviour of the fan during the start up procedure and in the event of high gusts of wind When the fan is switched on the controller will set it to run...

Страница 15: ...liance is fitted with a flue blockage device that will shut off the appliance in the event of abnormal flue conditions This device is NOT a substitute for an independently mounted carbon monoxide dete...

Страница 16: ...uld light the pilot burner If the pilot does not light try again after a few seconds The pilot may not light at the first attempt Waiting a few seconds gives the spark generator time to recover 5 Once...

Страница 17: ...IRE AND LAYING CERAMICS COALS PEBBLES When laying the ceramics coals pebbles on the burner closely follow the instructions found on pages 11 12 of these instructions Failure to do so will possibly cau...

Страница 18: ...e Signed Comments RECORD OF 4th SERVICE Serviced by CORGI No Service Date Signed Comments RECORD OF 5th SERVICE Serviced by CORGI No Service Date Signed Comments RECORD OF 6th SERVICE Serviced by CORG...

Страница 19: ...19 Be Modern Limited WESTERN APPROACH SOUTH SHIELDS TYNE WEAR NE33 5QZ TEL 0191 4553571 FAX 0191 4565556 Web site www bemodern com Email sales bemodern com THIS BOOKLET CONTAINS 20 PAGES HEPF BM 0606...

Отзывы: