GSS3219B
Owner’s Manual
10
Step 7 (Left side shelf assembly)
a) Pull out the drawer from the left side
shelf (H), then turn over it as shown.
b) String five hooks (J) with the side
bar tool hanger (I), then align the
holes on the end of side bar tool
hanger (I) with the holes on the left
side shelf.
c) Insert one M6 x 15mm bolt (BB) with
one M6 spring washer (FF) and one
M6 washer (EE) into each pre-drilled
hole. Tighten bolts by hand until
secured.
d) Go back and tighten all bolts using
the screwdriver provided.
Step 8 (Right side shelf assembly)
a) Turn over the right side shelf
(K).
b) String five hooks (J) with the
side bar tool hanger (I), then
align the holes on the end of
side bar tool hanger (I) with the
holes on the right side shelf.
c) Insert one M6 x 15mm bolt (BB)
with one M6 spring washer (FF)
and one M6 washer (EE) into
each pre-drilled hole. Tighten
bolts by hand until secured.
d) Go back and tighten all bolts
using the screwdriver provided.
BB
M6X15 Bolt
2 PCS
FF
M6 Spring Washer
2 PCS
EE
M6 Flat Washer
2 PCS
BB
M6X15 Bolt
2 PCS
FF
M6 Spring Washer
2 PCS
EE
M6 Flat Washer
2 PCS