
Microseparator™ Coolant Systems Transport, Installation, & Initial Startup
M000005_A - V Twin Ultra Transport & Installation 5.2-EN TM
8/78
1
Preface
Dear Customer
This Transport and Installation manual describes all steps you must take
to transport, install, and perform initial startup on your Microseparator™
coolant system components.
Please read this manual carefully and also observe the instructions on the
following page.
With the aid of this manual, you can perform the following steps:
Prepare for the installation of the equipment
.
Transport the machinery safely
Install the machine safely and easily.
Connect the machines correctly
Perform an initial startup
Always keep this manual in the immediate vicinity of the
machine so that it is available when needed.
In addition to this manual, the complete documentation package also
consists of the following:
Project specific “Piping Installation” drawings.
Project specific Electrical Prints
Service and Maintenance Manual.
Operators Manual.
We are confident of your success with our products and we ask that you
contact us whenever we may be of service.
Bazell Technologies Corporation
Microseparator™ Product Design Team