1.
Drop top beam on low pressure such that mere is a clearance of
approximately (1 mm) between top and bottom tools.
2.
After stopping the main motor and switching off the main switch, let the
top tool sit on the bottom tool "vee" slowly by releasing the latch in the
direction
(See Figure 6.5.7.4)
3.
Pull out the top tool manually by the left side of the machine. Stock it
using appropriate lifting equipment. (If the tool is a sectional type, by
hand)
NOTE :
You should release all latches along the beam so that you can pull out the
top tool. (If the tool is not sectional type)
4.
Place the new top tool from any side.
5.
Tighten up all latches to fix the top tool.
b. Changing the bottom tool:
To replace the existing bottom tool wi
t
h a new one
:
1.
Loosen up the fixing bolts
(See Figure 6.5.7.5 and Figure 6.5.7.6)
Figure 6.5.7.5
FIXING BOLTS
BOTTOM TOOL
PULLING OUT THE
TOOL
INSERTING THE
TOOL
Содержание APH Series
Страница 14: ...BAYKAL EDITION NO APH SECTION DATE OF ISSUE July 2005 PAGE 14 3 OVERALL DRAWING AND DIMENSIONS Figure 3 1...
Страница 17: ...BAYKAL EDITION NO APH SECTION DATE OF ISSUE July 2005 PAGE 17 Figure 5 1...
Страница 69: ...BAYKAL EDITION NO APH SECTION DATE OF ISSUE July 2005 PAGE 69 Wedge Adjustment Work Table Figure 6 5 8 3 A A...
Страница 90: ...BAYKAL EDITION NO APH SECTION DATE OF ISSUE July 2005 PAGE 90 APPENDIX A SPARE PART LIST...
Страница 91: ...BAYKAL EDITION NO APH SECTION DATE OF ISSUE July 2005 PAGE 91 B HYDRAULIC CIRCUIT DIAGRAM...
Страница 92: ...BAYKAL EDITION NO APH SECTION DATE OF ISSUE July 2005 PAGE 92 C ELECTRIC CIRCUIT DIAGRAM...
Страница 93: ...BAYKAL EDITION NO APH SECTION DATE OF ISSUE July 2005 PAGE 93 ADDITIONAL MANUALS...