4. Remount the unit.
Caution
Use a torque wrench.
Torque applied to the anode: 8 N·m.
The retaining screws on the inspection hatch must not be over
tightened.
Tab.5
Gasket
Torque load
Lip gasket
6 N m +1/-0
Sheet gasket
15 N m
Important
Approximately 6 N·m is obtained by manipulating the box spanner
with the small lever and 15 N·m by manipulating it with the large
lever.
5. After reassembly, check the tightness of the lateral flange.
6. Proceed with commissioning.
6.7
Inspection and maintenance of the solar circuit
See
Solar station installation and service manual.
6.8
Maintenance form
Tab.6
No.
Date
Checks made
Remarks
By
Signature
6 Maintenance
24
AS 300–2E BC
7724479 - v03 - 07102019
Содержание AS 300-2E BC
Страница 25: ...No Date Checks made Remarks By Signature 6 Maintenance 7724479 v03 07102019 AS 300 2E BC 25 ...
Страница 28: ...8 Appendix 28 AS 300 2E BC 7724479 v03 07102019 ...
Страница 29: ...8 Appendix 7724479 v03 07102019 AS 300 2E BC 29 ...
Страница 30: ...8 Appendix 30 AS 300 2E BC 7724479 v03 07102019 ...
Страница 32: ...7724479 v03 07102019 7724479 001 03 ...