![Baxi 430 Combi 2 Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/baxi/430-combi-2/430-combi-2_installation-and-service-manual_2711661029.webp)
5 Before installation
Combi 2
29
Fig.15
Clearances
Fig.16 Flue outlets
5.4.5
Clearances
A flat vertical area is required for the installation of the boiler and it should
be capable of bearing the weight of the boiler when full of water.
These dimensions include the necessary clearances around the boiler for
case removal, spanner access and air movement. Additional clearances
may be required for the passage of pipes around local obstructions such
as joists running parallel to the front face of the boiler.
In the diagram these are MINIMUM recommended dimensions. Greater
clearance will aid installation and maintenance.
5.4.6
Flue/chimney location
The following guidelines indicate the general requirements for siting bal-
anced flue terminals. For GB recommendations are given in BS 5440 Pt 1.
For IE recommendations are given in the current edition of I.S. 813
Domestic Gas Installations.
Important
Due to the nature of the boiler a plume of water vapour will be
discharged from the flue. This should be taken into account when
siting the flue terminal.
Tab.19
Terminal position with minimum distance
1
Flue positions marked
require a flue terminal guard.
PN-0000456
Key
Description
mm
Key
Description
mm
A
(1)
Directly below an opening, air brick open-
ing window etc.
300
J
From a surface or boundary line facing
a terminal
600
B
(1)
Above an opening, air brick, opening win-
dow etc.
300
K
From a terminal facing a terminal
(Horizontal flue)
1200
From a terminal facing a terminal
(Vertical flue)
600
J,K
T
U
R
N
M
D
E
A
C
I
I
I
S
I
F
B
F
L
A
A
J,K
G
H
H
I
1