BF 100 - 6
Page 7
Special Edition, Rev. 0 Chg. 0
BAUER
COMPRESSORS
2.1.1
Attaching the Fill Yoke to the Air Storage Bottle
1. Ensure both the fill valve and bottle valve are closed.
2. Connect the air bottle to the BFP fill hose utilizing the fill yoke.
2.1.2
Opening Sequence for Filling the Bottle
1. First open fill valve. (1)
2. Open bottle valve. (2)
3. Bottle will begin filling.
4. During the filling process, monitor bottle pressure on fill valve gauge and drain condensate at the
compressor.
2.1.3
Closing Sequence for After Filling the Bottle
1. First close the bottle valve. (1)
2. Close the fill valve. (2)
3. Remove fill yoke and store compressed air bottle.