Take your time now and relax for a while. Then do the last
double check of all soldered joints at
this
point
.
After
next
steps
it
would
be
MUCH
HARDER
to
do
any
repairment.
Don’t forget to place the
ICs
into the sockets (2x; Attiny85). There is a signed
notch on each IC
that
has to match with the
notch on the socket
. Be also aware that LFO goes to the socket on the left
and VCO to the right one. Installing ICs can be also a little tricky. You should bend the IC leads in
slightly
with
your
fingers.
Then
press
all
the
leads
into
the
sockets
in
one
shot.
11
Содержание KASTLE v1.3
Страница 4: ...4...
Страница 5: ...5...
Страница 6: ...Add the 3 5mm jack connectors 2x 6...
Страница 15: ...15...