Step 10. Set OVERVOLTAGE 2 TIME DIAL to 001 and apply to case terminals 6 and 7, a voltage that is
10% greater than the value applied in Step 1.
Step 11. Monitor the output terminals indicated in Figure 5-1 for OVERVOLTAGE 2. Remove, and then
reapply the overvoltage at case terminals 6 and 7. Observe the time registered by the counter.
Time must equal the setting
±
100 milliseconds or 2%, whichever is greater.
Step 12. Set OVERVOLTAGE 2 TIME DIAL to 010. Monitor the output terminals indicated in Figure 5-1
for OVERVOLTAGE 2. Remove, and then reapply the overvoltage at case terminals 6 and 7.
Observe the time registered by the counter. Time must equal the setting
±
100 milliseconds or
2%, whichever is greater.
Step 13. Set OVERVOLTAGE 2 TIME DIAL to 100. Monitor the output terminals indicated in Figure 5-1
for OVERVOLTAGE 2. Remove, and then reapply the overvoltage at case terminals 6 and 7.
Observe the time registered by the counter. Time must equal the setting
±
100 milliseconds or
2%, whichever is greater.
Step 14. Set OVERVOLTAGE 2 TIME DIAL to 999. Monitor the output terminals indicated in Figure 5-1
for OVERVOLTAGE 2. Remove, and then reapply the overvoltage at case terminals 6 and 7.
Observe the time registered by the counter. Time must equal the setting
±
100 milliseconds or
2%, whichever is greater.
Figure 5-1. Typical Test Setup Timing Option E2
Содержание BE1-59NC
Страница 2: ......
Страница 6: ...iv BE1 59NC Introduction 9279400990 Rev B This page intentionally left blank...
Страница 8: ...vi BE1 59NC Introduction 9279400990 Rev B This page intentionally left blank...
Страница 15: ...9279400990 Rev B BE1 59NC General Information 1 7 Figure 1 4 Overvoltage Inverse Time Curves High Ranges...
Страница 16: ...1 8 BE1 59NC General Information 9279400990 Rev B This page intentionally left blank...
Страница 22: ...4 2 BE1 59NC Installation 9279400990 Rev B Figure 4 1 Panel Cutting Drilling Semi Flush Case...
Страница 23: ...9279400990 Rev B BE1 59NC Installation 4 3 Figure 4 2 Panel Cutting Drilling Double Ended Projection Mount Case...
Страница 26: ...4 6 BE1 59NC Installation 9279400990 Rev B Figure 4 5 Case Dimensions Rear View Semi Flush Case...
Страница 27: ...9279400990 Rev B BE1 59NC Installation 4 7 Figure 4 6 Case Dimensions Rear View Projection Mount Case...
Страница 28: ...4 8 BE1 59NC Installation 9279400990 Rev B P0002 12 01 31 01 Figure 4 7 Case Cover Dimensions Front View...
Страница 30: ...4 10 BE1 59NC Installation 9279400990 Rev B Figure 4 9 Typical Protection Methods...
Страница 31: ...9279400990 Rev B BE1 59NC Installation 4 11 Figure 4 10 Typical Internal Connections...
Страница 38: ...5 6 BE1 59NC Testing 9279400990 Rev B This page intentionally left blank...