BE1-50/51B-214/-215/-223/-225 Testing
5-9
Step 2. Apply 0.15 ampere input current to terminals 5 and 6. (0.15 ampere provides input power but
stays below pickup.)
Step 3. Connect a jumper between TIME MANUAL TRIP test points. Check that TIME target operates.
Step 4. Connect a jumper between INST MANUAL TRIP test points. Check that INST target operates.
Step 5. Reset targets.
Perform preliminary setup:
Integrating Reset Test
•
Connect test setup as shown in Figure 5-1.
•
Insure that SW3 switches are set: SW3-1 for the operating frequency, SW3-2 to OFF, SW3-3 to
ON, and SW3-4 ON.
•
Set TIME DIAL to 4.5.
•
Set CURVE to I.
•
Set TIME PICKUP to 0.20.
•
Set INST PICKUP to 18.0.
Step 1. Set voltage source to provide a target current of 1.0 ampere.
Step 2. Read all of Step 3 before beginning Step 3.
Step 3. Apply 0.8 amperes input current to terminals 5 and 6. After the unit trips, remove the input current
for 20
±
0.25 seconds, then reapply the 0.8 amperes input current. Record the elapsed time from
the re-application of input current to the output retrip.
Result: Elapsed time should be 1.55
±
0.3 seconds.
SETTING THE RELAY
Select the desired relay settings before putting the relay into service. Changing pickup current settings
while the relay is in service may cause tripping.
PERIODIC TESTS
General
All relays should be tested periodically to identify and correct any problems that are found.
Single phase relays such as the BE1-50/51B-214/-215/-223/-225 are normally used in groups of four
(three phase and ground) on the protected circuit. This relay scheme allows each unit to be withdrawn
one at a time for testing purposes without losing protection. Only three are required at any one time to
sense all types of faults on a grounded wye system. Refer to Figures 5-1 through 5-4 for recommended
test setups.
Periodic Test
Periodic testing should consist of the following procedures.
Step 1. Verify that the instantaneous pickup is within
±
2% of the value set on the dials. Pickup occurs
when the INST output contacts close.
Step 2. Verify that the time pickup is within
±
2% of the value set on the dials. Pickup occurs when the
LED turns GREEN then RED.
Step 3. Verify that the time to trip for the curve and time dial settings at a multiple of six is the same as
the time given on the characteristic curve. Refer to Section 1 for the characteristics curves.
Step 4. Verify that the time to trip for the instantaneous element at a pickup multiple of 2 is not greater
than the time given on the instantaneous characteristic curve. Refer to Section 1 for the
instantaneous characteristic curve.
Step 5. Verify that the targets operate with one ac ampere of trip current in the trip circuits and that they
can be reset using the RESET BUTTON.
Содержание BE1-50/51B-214
Страница 2: ......
Страница 6: ...iv BE1 50 51B 214 215 223 225 Introduction 9252000994 Rev N This page intentionally left blank...
Страница 8: ...vi BE1 50 51B 214 215 223 225 Introduction 9252000994 Rev N This page intentionally left blank...
Страница 10: ...ii BE1 50 51B 214 215 223 225 General Information 9252000994 Rev N This page intentionally left blank...
Страница 20: ...1 10 BE1 50 51B 214 215 223 225 General Information 9252000994 Rev N This page intentionally left blank...
Страница 22: ...ii BE1 50 51B 214 215 223 225 Controls and Indicators 9252000994 Rev N This page intentionally left blank...
Страница 24: ...2 2 BE1 50 51B 214 215 223 225 Controls and Indicators 9252000994 Rev N Figure 2 2 Location of SW3 P0053 50...
Страница 26: ...2 4 BE1 50 51B 214 215 223 225 Controls and Indicators 9252000994 Rev N This page intentionally left blank...
Страница 28: ...ii BE1 50 51B 214 215 223 225 Functional Description 9252000994 Rev N This page intentionally left blank...
Страница 32: ...3 4 BE1 50 51B 214 215 223 225 Functional Description 9252000994 Rev N This page intentionally left blank...
Страница 34: ...ii BE1 50 51B 214 215 223 225 Installation 9252000994 Rev N This page intentionally left blank...
Страница 39: ...9252000994 Rev N BE1 50 51B 214 215 223 225 Installation 4 5 Figure 4 4 DC Control Connections BE1 50 51B 215...
Страница 42: ...ii BE1 50 51B 214 215 223 225 Testing 9252000994 Rev N This page intentionally left blank...
Страница 52: ...5 10 BE1 50 51B 214 215 223 225 Testing 9252000994 Rev N This page intentionally left blank...
Страница 54: ...ii BE1 50 51B 214 215 223 225 Time Characteristic Curves 9252000994 Rev N This page intentionally left blank...
Страница 69: ......