GF Health Products, Inc. - www.grahamfield.com
Zenith Series Service Manual 999-0831-190C DEC. 2013
21
ZENITH SERIES
OPTIONAL PLASTIC HALF RAIL INSTALLATION & OPERATION
PLASTIC HALF RAIL OPERATION
1. Position the Plastic Half Rail (#2) as shown, with the taller, straight edge
toward the head end of the bed and arms angled toward center of the bed.
2. From the outside, insert the two welded pins (with grooves) on the
rail arms into the two large holes in the side of the head deck.
3. From the inside, insert the metal hair pin clip end of the Lanyard
Assembly (#3) onto the exposed grooves at the end of the pins.
4. Position the other terminal end of the Lanyard
Assemblies (#3) over the small hole on the inside
of the deck frame. Secure with a small
threaded Phillips Screw (#4).
PLEASE ORDER PLASTIC RAIL KIT #ZA84200,
WHICH INCLUDES A RIGHT-HAND AND LEFT-
HAND HALF RAIL, FOUR LANYARD ASSEMBLIES,
AND 2 PHILLIPS SCREWS (OR 2 OPTIONAL HEX
HEAD SCREWS). ORDER BAG # 999-0842-905
FOR JUST THE REPLACEMENT HARDWARE.
THE PLASTIC RAIL CAN BE POSITIONED ON
EITHER THE HEAD OR FOOT DECKS FOR 80”
BEDS.
THEY SHOULD ONLY BE PUT ON THE
HEAD END FOR 76” BEDS.
RH Plastic Half Rail
Assembly (#2)
Head Deck (#1)
Small
Hole
TOW
ARD CENTER
OF BED
Straight
Edge toward
Head End
SLEEP
SURFACE
SLEEP
SURFACE
Lanyard
Assembly (#3)
Lanyard
Assembly (#3)
Phillips
Screw (#4)
KIT ZA84200 - (Sample shows rail positioned on right side of bed)
HEAD END
TO AVOID PINCHING FINGERS, HOLD
THE HALF RAIL FROM THE TOP WITH
ONE HAND AND CAREFULLY DEPRESS
THE BLACK RELEASE LEVER WITH
THE OTHER. MAKE SURE THERE ARE
NO OBJECTS IN THE WAY THAT MAY
HINDER THE FULL MOVEMENT OF
THE RAIL.
FOR OPTIMUM SAFETY, PLEASE
MAKE SURE RAIL IS ALWAYS IN
ITS “FULL UP LOCKED” POSITION
WHEN LEAVING THE RESIDENT/
PATIENT UNATTENDED TO AVOID
POSSIBLE INJURY.
POWERED AIR MATTRESS SURFACES
MAY POSE A RISK OF ENTRAPMENT.
PRIOR TO USE, ENSURE THE THERA-
PEUTIC BENEFITS OUTWEIGH THE
RISK OF ENTRAPMENT.
!
!
!