- 44 -
•
Install the device in a well ventilated area.
•
Place the device in a way, so that the ventilation openings at the back are not covered
or blocked.
•
So not place the device directly at walls or other
objects that are made of combustible materials.
Keep a minimum distance of 100 mm between
walls or other objects and the right side, back and
top of the device. Keep a minimum distance of
500 mm to the left side of the device and other
objects. (Figure 1).
•
The levelling and height adjustment using the
adjustable legs should be performed as shown in
Figure 2.
Harsh differences in height or level may affect the
functioning of the device.
Remove the protective foil from the outer panels.
Slowly pull these off so that no glue or adhesive
residuals remain.
•
Make sure that the openings and slots for suction
and cooling are not blocked.
Connection
Electrical connection
•
Before connecting the device to power supply, make sure that the voltage and frequency
values on the rating plate comply with the values of the available power supply system. A
voltage deviation of note more than ± 10% is tolerable.
•
Make sure, that there is an earth conductor that complies with the applicable regulations.
See that you use a cable with an appropriate cross-section when connecting the device to
power supply.
•
The electrical connection requires the interconnection of an all-pole main switch
(corresponding to the load) between the device and the power supply system. This
switch has contacts with a minimum opening distance of 3 mm and must be placed
easily accessible.
•
Observe the VDE (VDE Association for Electrical, Electronic & Information technologies)
regulations of the local energy supplier.
•
In certain cases the device should be connected to an equipotential bonding system,
here the applicable regulations are to be observed.
Water connection
•
Water pressure: max. (250KPa) 2,5 bar.
•
We recommend the installation of a softening agent ~ 8 ÷ 10 °F