Installation
Ex p Control unit
APEX
mv
Page 24 of 80
01-37A2-7D0005_MV_Manual_Exp-Control-Unit_2021005_0_en.docx
Rev. 0
5
Installation
Before starting work, find out about the general safety
instructions (see Chapter 2 Safety instructions).
Deviations in the installation of customer-specific assemblies
may occur.
Observe the chapters Installation and Electrical connections.
Carry out the installation according to the following sections, unless otherwise
agreed for customer-specific control units.
Mounting Ex p control unit APEX
mv
Attach the Ex p control unit to the intended
position using the fastening options provided on
the housing.
M6 screws with associated locking elements can
be used as fastening material.
The corresponding drilling diagram is available in
the appendix.
Pneumatic connections APEX
mv
The following figures show the pneumatic connections of the APEX control unit.
Variant stainless steel:
Variant polyester:
Connection
Function
1
Purge gas supply
2
Purge gas supply to the Ex p protected equipment
3
Purge gas return from Ex p protected equipment