
Installation
29
Operating Instructions HYGROPHIL® H 4230-12 BA 060207
3
Installation
Depending on the local circumstances and purpose of use, HYGROPHIL
®
H 4230 can be installed as either a stationary unit (wall mounting) or a mo-
bile unit.
The entire installation must be carried out by a specialist, taking into account
and observing the regulations stipulated in DIN/VDE 100 and the relevant
national provisions for setting up power installations rated for up to 1000
volts.
Select a solid, vibration-free, vertical surface for installing the equipment. In
addition, the installation location should be easily accessible for mainte-
nance and cleaning work and should be illuminated.
Comply with this procedure wherever possible when installing the equip-
ment:
1. Mechanical installation
2. Connect sensors where appropriate
3. Connect outputs
4. Mount gas sampling hose
5. Pressure reduction regulator (if operated with over-pressure)
6. Mount filter (if necessary)
7. Prepare compressed air connection
8. Connect to the mains
9. Fill water storage tank
Содержание HYGROPHIL H 4230-12 Ex Zone II
Страница 2: ......
Страница 30: ...System description 24 Operating Instructions HYGROPHIL H 4230 12 BA 060207...
Страница 34: ...Safety precautions 28 Operating Instructions HYGROPHIL H 4230 12 BA 060207...
Страница 66: ...Programming 60 Operating Instructions HYGROPHIL H 4230 12 BA 060207...
Страница 112: ...Operating Instructions HYGROPHIL H 4230 12 BA 060207...