background image

U

NPACKING AND

I

NSTALLATION

12

Electrical Requirements

SHKA2000 and SHKE2000 require a 120 VAC, 50/60 Hz
power source.  They are supplied with a 3-wire line cord and
should be plugged into an outlet designed for 3-prong plugs.
If an extension cord is used, it also should be the 3-wire
grounded type.  For an outlet designed to accept 2-prong
plugs (ungrounded), it is required that a qualified electrician
replaces the outlet with a new, grounded type.

SHKA2000-1CE and SHKE2000-1CE require a 240 VAC,
50/60 Hz power source.  They are supplied with a Schuko
cordset. 

If a plug must be installed, use only the 3-prong grounded
type, rated for the unit load requirements and matching the
power outlet.  Make sure the green ground wire is secured to
the plug ground terminal. 

To eliminate hazard of electrical shock, make sure floor
around shaker is dry.  In the event of accidental spilling or
splashing of liquids, clean up and/or neutralize the spilled liq-
uids before continuing.

Leave shaker disconnected when not in use.

Platform Installation

1. 

Select the appropriate platform for the vessels to be
shaken.  A wide variety of platforms and 
accessories are available:

•  Dedicated platforms have the maximum number of
flask clamps attached for safe operation.

•  Combination platforms allow the user to shake a
wide variety of different sized vessels on the same
platform.  

2.

Carefully position the platform horizontally over 
the shaker’s mounting plate, allowing the 4 thumb
knobs on the sides of the mounting plate to line up
with the corresponding cut outs on the platform’s
sides.

3. 

Once the platform is in place over the outside edges
of the mounting plate, tighten the 4 thumb knobs to
secure platform to the mounting plate. 

Warning

Do not operate shaker with a dam-
aged electrical cord.

Caution

Do not operate shaker with an unbal-
anced load.  Platforms should be
loaded for optimum stability and 
operation.  Do not lift shaker by the
platform.

Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Содержание MaxQ 2000 Series

Страница 1: ...MaxQ 2000 Open Air Platform Shakers MODEL NO SHKA2000 SHKE2000 SHKA2000 1CE SHKE2000 1CE 057 278 00 1 17 05 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...

Страница 2: ...p Installation 13 Test Tube Rack Installation 13 Operation 14 SHKA2000 SHKA2000 1CE 14 Power Switch 14 Speed Control and Display 14 Time r 14 SHKE2000 SHKE2000 1CE 15 Turning Shaker On 15 Setting Shak...

Страница 3: ...ignite such materials Not rated for use in hazardous atmospheres 2 Use appropriate hand and eye protection when handling hazardous chemicals 3 Refer servicing to qualified personnel 4 Do not modify co...

Страница 4: ...xing etc The vessels should be securely clamped before turning on shaker and contain a stopper whenever possible to prevent hazardous sub stances from being thrown out during shaking action Shaking ac...

Страница 5: ...terface None None Monitor speed and time with a computer Monitor speed and time with a computer Display Analog tachometer displays speed in rpm Analog tachometer displays speed in rpm 2 individual LED...

Страница 6: ...s Beeps twice when time has expired Shaking motion stops Unbalanced Load None None If the unit is running in an unbalanced condition an alarm will sound and the shaker will stop until the end user cor...

Страница 7: ...eypad in one rpm increments Flashing display indi cates power interruption Pressing any key will clear display Non volatile memory maintains speed and time set points in the event of a power interrupt...

Страница 8: ...ions and flicker EN 61326 1 Electrical equipment for measurement control and laboratory use Part I General Requirements Safety EN 61010 1 Safety requirements for electrical equipment for measurement c...

Страница 9: ...d 3 Speed Tachometer Analog display of platform rotation speed 4 Time r Allows user to choose either continuous or timed operation Caution It s not recommended to operate shaker in a CO2 enriched atmo...

Страница 10: ...digit LED indicates time remaining or elapsed time 11 Up Arrow Key Increases shaking time 12 Down Arrow Key Decreases shaking time 13 Elapsed Timer Light Indicates accumulated time 14 Hours Timer indi...

Страница 11: ...below when unpacking to verify that the complete unit has been received Do not discard packing materials until all is accounted for The following items are included in the shipment Model No SHKA2000...

Страница 12: ...and or neutralize the spilled liq uids before continuing Leave shaker disconnected when not in use Platform Installation 1 Select the appropriate platform for the vessels to be shaken A wide variety o...

Страница 13: ...provided with the clamp must be properly attached to the platform 2 Make sure all vessels are securely clamped before turning on unit Wherever possible vessels should contain a stopper to prevent haza...

Страница 14: ...a maximum of 400 rpm Time r 1 From the 12 o clock off position rotate timer knob counterclockwise to the ON position to ini tiate continuous operation 2 For timed operation rotate timer knob clockwise...

Страница 15: ...ress STOP membrane switch to end shaking SET RPM light will illuminate Calibrating Shaking Speed 1 Choose a speed for which calibration is desired by using the shaker s UP or DOWN arrow keys 2 Measure...

Страница 16: ...ne switch for desired timing mode 3 Hold down appropriate arrow membrane switch in the TIME module of the control panel up or down until desired timing cycle is set from 0 1 hour up to 999 hours or fr...

Страница 17: ...timed shaking Timer will begin to count up and will display accumulated time in display window Platform rotation will cease and TIME display will flash when ELAPSED time reaches 999 minutes or 999 hou...

Страница 18: ...None Stop bits 1 Flow control None After verifying the above settings click OK 6 In the main dialog box click on File Save 7 Exit the program by clicking on File Exit Yes 8 Verify the program was save...

Страница 19: ...atically set by the location of the motor and is not adjustable 4 To align a pulley loosen the motor pulley set screw slide the pulley up or down into alignment then securely tighten the motor pulley...

Страница 20: ...i n u s e h c t a m t a h t y l p p u s r e w o p e h t e t a c o L s t n e m e r i u q e r e s u f e c a l p e R l e n a p l o r t n o c n o h c t i w s e n a r b m e m y n a s s e r P r e m i t t e...

Страница 21: ...HKA2000 1CE 562 184 10 Thumb Screw Knob 790 078 00 Mounting Feet 790 316 11 Mounting Plate Mat 019 455 00 Shaker Mechanism 370 272 01 Motor Brush Spring Replacement SHKA2000 SHKA2000 1CE 019 533 02 Ma...

Страница 22: ...tained promptly from the factory When service or replacement parts are needed we ask that you check first with your dealer If the dealer cannot handle your request then contact our Customer Service De...

Страница 23: ...23 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...

Страница 24: ...d without further force or effect if there is any i repair made to the product by a party other than Barnstead or its duly authorized service representa tive ii misuse including use inconsistent with...

Отзывы: