11
Shipping Carton
This should be inspected upon delivery. When received,
carefully examine for any shipping damage before
unpacking. If damage is discovered, the delivering carrier
should specify and sign for the damage on you copy of
the delivery receipt.
Open the carton carefully making certain that all parts are
accounted for before packaging materials are discarded.
After unpacking, if damage is found, promptly report it to
the carrier and request a damage inspection properly.
IMPORTANT: Failure to request an inspection of damage
within a few days after receipt of shipment absolves the
carrier from any liability for damage. You must call for a
damage inspection promptly.
Unpacking
Use the packing list below when unpacking to verify that
the complete unit has been received. Do not discard
packing materials until all is accounted for.
The following items are included in the shipment:
Model No. SHKA2000, SHKE2000, SHKA2000-1CE, or
SHKE2000-1CE
Operator’s Manual- 057-278-00
Product Registration Card- 528-022-00
Mounting Plate Mat- 790-316-11
Thumb Screw Knob- 562-184-10
Inspection Tag- 528-028-00
If any items are missing, contact Barnstead International
at 1-800-553-0039.
Location
Put the shaker on a level table or bench capable of sup-
porting the weight of the shaker with any accessories
while in operation. Place shaker near an electrical outlet
that matches the unit nameplate requirements. Allow
clearance around the unit for free air convection, acces-
sory attachments and user convenience.
Unpacking and Installation
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com