Waste and emissions regulations
Observe these safety regulations regarding waste and emissions:
Ÿ
Dispose appropriately of all waste.
Ÿ
Handle and dispose of the processed liquid in compliance with applicable environmental regulations.
Ÿ
Clean up all spills in accordance with safety and environmental procedures.
Ÿ
Report all environmental emissions to the appropriate authorities.
Electrical installation
For electrical installation recycling requirements, consult your local electric utility.
Recycling guidelines
Always recycle according to the guidelines listed below:
Ÿ
Follow local laws and regulations regarding recycling if the unit or parts are accepted by an authorized recycling
company.
Ÿ
If the first guideline is not applicable, then retum the unit or parts to the nearest BARMESA representative.
2. Prior to operation
Check the following points upon receipt of your pump.
Ÿ
Is it the pump you ordered? Check nameplate. It is especially important that you check whether the pump is to be
used with 50 or 60 Hz.
Ÿ
Has any damage occurred during shipment? Are any bolts or nuts loose?
Ÿ
Have all necessary accessories been supplied? For a list of standard accessories see drawing and parts list.
3. Installation
Check the following before beginning installation:
3.1 Insulation resistance measurement
With the motor and cable (excluding the power supply cable) immersed in water, use a megger to measure the
insulation resistance between ground and each phase of the motor, and again between each phase of the motor.
The megger should indicate an insulation resistance of
not less than 20 megaohms
. While making the measurement,
keep the power supply cable off the ground.
NOTICE
We recommend that an auxiliary pump be kept on hand in case of emergency.
barmesa.com
7
Содержание 2KLEIN-051
Страница 19: ...barmesa com...