
Inspection log for technical safety inspections (TSI)
Barkey warming center III DTM
Owner:
_______________________
Serial number:
_______________________
_______________________
Original measurement: _______________________
_______________________
Date:
_______________________
Note:
The following checks must be carried out every 12 months on this device.
These may only be carried out by persons authorised in accordance with German § 6 MPBetreibV regulations.
The TSI does not release the operator of medical products from the prescribed repeat inspections and
from other legal requirements.
not OK
OK
4. Measurements in accordance with DIN EN 60601-1:March 1996
-
Testing device: (type, serial number)
________________________________________
-
Earth conductor res. (incl. power cable):
(R
SL
≤
0.2
Ω
)
_________
Ω
-
Insulation resistance:
(R
ISO
≥
2 M
Ω
)
_________ M
Ω
-
Earth leakage current:
(I
Eanc
≤
0.5 mA)
_________ mA
-
Housing leakage current:
(I
Ganc
≤
0.1 mA)
_________ mA
5. Functional inspection
-
Green LED illuminates after being switched on
-
Temperature display permanently illuminated after switching on
-
Green LED blinks when door open
-
Acoustic signal after 2 minutes when door open
-
Circulating air temperature regulation works after door closed
6. Comments:
no
yes
7. TSI has been passed
8. Affixing the test sticker
Test carried out by (company / department):
________________________________
Technician:
________________________
________________________________
Date:
________________________
________________________________
Signature:
________________________
FB 0946/ 0 DE Page 2
Содержание warming center III DTM
Страница 2: ......