WIRING  –  LOW VOLTAGE WIRING

230 / 208V, 1 phase and 3 phase equipment dual
primary voltage transformers.  All equipment leaves the
factory wired on 240V tap.  For 208V operation,
reconnect from 240V to 208V tap.  The acceptable
operating voltage range for the 240 and 208V taps are:

TAP

RANGE

240

253 – 216

208

220 – 187

NOTE: The voltage should be measured at the field

power connection point in the unit and while
the unit is operating at full load (maximum
amperage operating condition).

Ten (10) wires should be run from thermostat subbase to
the 24V terminal board in the unit.  A nine conductor,
18 gauge copper color-coded thermostat cable is
recommended.  The connection points are shown in
Figure 8.

TABLE  3

THERMOSTAT WIRE SIZE

r

e

m

r

o

f

s

n

a

r

T

A

V

A

L

F

e

g

u

a

G

e

r

i

W

m

u

m

i

x

a

M

e

c

n

a

t

s

i

D

t

e

e

F

n

i

5

5

3

.

2

e

g

u

a

g

0

2

e

g

u

a

g

8

1

e

g

u

a

g

6

1

e

g

u

a

g

4

1

e

g

u

a

g

2

1

5

4

0

6

0

0

1

0

6

1

0

5

2

IMPORTANT

Only the thermostats shown in this Manual
have been tested with this equipment for
proper operation.  Proper unit operation with
thermostats not listed in this Manual, cannot
be assured.

You assume responsibility for proper
operation of the unit when using thermostats
other than those listed above.

FIGURE  8

UNIT 24V TERMINAL BOARD

WIRING  –  MAIN POWER

Refer to the unit rating plate for wire sizing information
and maximum fuse or “HACR” type circuit breaker
size.  Each outdoor unit is marked with a “Minimum
Circuit Ampacity”.  This means that the field wiring
used must be sized to carry that amount of current.
Depending on the installed KW of electric heat, there
may be two  field power circuits required.  If this is the
case, the unit serial plate will so indicate.  All models
are suitable only for connection with copper wire.
Each unit and/or wiring diagram will be marked “Use
Copper Conductors Only”.  These instructions 

must be

adhered to.  Refer to the National Electrical Code
(NEC) for complete current carrying capacity data on
the various insulation grades of wiring material.  All
wiring must conform to NEC and all local codes.

The electrical data lists fuse and wire sizes (75° C
copper) for all models including the most commonly
used heater sizes.  Also shown are the number of field
power circuits required for the various models with
heaters.

The unit rating plate lists a “Maximum Time Delay
Relay Fuse” or “HACR” type circuit breaker that is to
be used with the equipment.  The correct size must be
used for proper circuit protection and also to assure that
there will be no nuisance tripping due to the momentary
high starting current of the compressor motor.

The disconnect access door on this unit  may be locked
to prevent unauthorized access to the disconnect.  To
convert for the locking capability, bend the tab locate in
the bottom left hand corner of the disconnect opening
under the disconnect access panel straight out.  This tab
will now line up with the slot in the door.  When shut, a
padlock may be placed through the hole in the tab
preventing entry.

See “Start Up” section for important information on
three phase scroll compressor start ups.

Содержание SH611

Страница 1: ...NSTALLATION INSTRUCTIONS WALL MOUNTED PACKAGE HEAT PUMPS Model SH611 Manual 2100 411G Supersedes 2100 411F File Volume III Tab 17 Date 09 26 07 Bard Manufacturing Company Inc Bryan Ohio 43506 Since 19...

Страница 2: ...d CFM and Rated ESP 22 Table 9 Indoor Blower Performance 22 Table 10 Maximum ESP of Operation 22 Table 11 Pressure Table Cooling 23 Table 12 Pressure Table Heating 23 Getting Other Information and Pub...

Страница 3: ...ter and Summer Air Conditioning Duct Design for Residential ACCA Manual D Winter and Summer Air Conditioning and Equipment Selection FOR MORE INFORMATION CONTACT THESE PUBLISHERS ACCA Air Conditioning...

Страница 4: ...2 0 2 2 3 8 0 6 2 8 6 4 2 7 0 0 2 1 5 MODEL NUMBER CONTROL MODULES CAPACITY 61 5 ton VOLTS PHASE A 230 208 60 1 B 230 208 60 3 C 460 60 3 REVISIONS KW VENTILATION OPTIONS X Barometric Fresh Air Dampe...

Страница 5: ...Manual 2100 411G Page 5 of 23 FIGURE 1 UNIT DIMENSIONS SH611...

Страница 6: ...an adequate duct system than a straight air conditioning unit All duct work supply and return must be properly sized for the design airflow requirement of the equipment Air Conditioning Contractors o...

Страница 7: ...using a return air filter grille filters must be of sufficient size to allow a maximum velocity of 400 fpm FILTERS A 1 inch throwaway filter is supplied with each unit The filter slides into position...

Страница 8: ...g would then be 32 x 12 See Figures 3 and 4 for details 3 Locate and mark lag bolt locations and bottom mounting bracket location See Figure 3 4 Mount bottom mounting bracket 5 Hook top rain flashing...

Страница 9: ...796 A Top flashing detail view Attach supplied rain flashing Apply caulk between flashing and wall Foam air seal Seal with bead of caulking along entire length of top Supply flange Side view of wall w...

Страница 10: ...s is required for the first 3 feet of ducting It is important to insure that the 1 4 inch minimum spacing is maintained at all points Failure to do this could result in overheating the combustible mat...

Страница 11: ...Manual 2100 411G Page 11 of 23 FIGURE 5 WALL MOUNTING INSTRUCTIONS FIGURE 6 WALL MOUNTING INSTRUCTIONS SEE FIGURE 4 MOUNTING INSTRUCTIONS SEE UNIT DIMENSIONS FIGURE 1 FOR ACTUAL DIMENSIONS...

Страница 12: ...Manual 2100 411G Page 12 of 23 FIGURE 7 COMMON WALL MOUNTING INSTALLATIONS...

Страница 13: ...Minimum Circuit Ampacity This means that the field wiring used must be sized to carry that amount of current Depending on the installed KW of electric heat there may be two field power circuits requir...

Страница 14: ...pment at the time of manufacture is not designated for any specific destination of the country and are installed in areas not approaching the lower outdoor temperature range outdoor thermostats are no...

Страница 15: ...ermostat This is done to maximize efficiency by utilizing the heat pump to bring the FIGURE 12 ELECTRIC HEAT HOLD OFF WIRING 15 20KW 1 PH 3 PH FIGURE 11 ELECTRIC HEAT HOLD OFF WIRING 4 10KW 1 PH 6 9KW...

Страница 16: ...uired 5 if no ventilation system is installed For proper system operation under Emergency Heat conditions where the compressor needs to be deactivated the B W2 E outputs need to be energized Removing...

Страница 17: ...or rewired If improper rotation is corrected at this time there will be no negative impact on the durability of the compressor However reverse operation for over one hour may have a negative impact on...

Страница 18: ...the system operating pressures can be observed Pressure tables can be found later in the manual covering all models on both cooling and heating cycles It is imperative to match the correct pressure ta...

Страница 19: ...r time to elapse Use a small screwdriver or other metallic object or another 1 4 inch QC to short between the SPEEDUP terminals to accelerate the HPC timer and initiate defrost Be careful not to touch...

Страница 20: ...g i h e h t f I t i u c r i c d e s o l c a s i o t n o d n a f f o r e w o p e l c y C t n e n o p m o c e v i t c e f e d e c a l p e R r o s s e r p m o c e h t t u o k c o l l l i w l o r t n o c...

Страница 21: ...507 66418 64399 62449 60565 58745 56985 55284 53640 52051 50514 49028 47590 46200 44855 43554 42295 41077 25 0 26 0 27 0 28 0 29 0 30 0 31 0 32 0 33 0 34 0 35 0 36 0 37 0 38 0 39 0 40 0 41 0 42 0 43 0...

Страница 22: ...e t a R P S E d e d n e m m o c e R e g n a R w o l f r i A 1 1 6 H S 0 5 3 1 0 2 0 0 1 1 5 7 4 1 Subtract 08 static for 2 filter TABLE 9 INDOOR BLOWER PERFORMANCE CFM 230V 460V P S E H n I 2 O 1 1 6...

Страница 23: ...i S h g i H 9 6 1 8 1 0 7 7 0 2 2 7 9 2 2 3 7 7 4 2 5 7 1 6 2 6 7 2 7 2 6 7 8 7 2 7 7 1 8 2 8 7 0 8 2 B D g e d 5 8 B W g e d 2 7 e d i S w o L e d i S h g i H 1 7 7 8 1 2 7 4 1 2 5 7 7 3 2 6 7 6 5 2...

Отзывы: