background image

Manual 2100-324
Page

10

TABLE  7

THERMOSTAT WIRE SIZE

A

V

r

e

m

r

o

f

s

n

a

r

T

A

L

F

e

g

u

a

G

e

r

i

W

m

u

m

i

x

a

M

e

c

n

a

t

s

i

D

t

e

e

F

n

I

5

5

3

.

2

0

2

8

1

6

1

4

1

2

1

5

4

0

6

0

0

1

0

6

1

0

5

2

TABLE  8

WALL THERMOSTAT AND SUBBASE COMBINATIONS

t

a

t

s

o

m

r

e

h

T

e

s

a

b

b

u

S

s

e

r

u

t

a

e

F

e

t

a

n

i

m

o

d

e

r

P

2

0

0

-

3

0

4

8

1

1

1

3

F

7

8

T

3

0

0

-

4

0

4

8

0

2

2

1

A

9

3

5

Q

y

r

u

c

r

e

M

,l

o

o

c

e

g

a

t

s

1

,t

a

e

h

e

g

a

t

s

1

o

t

u

a

-

n

o

:

n

a

F

l

o

o

c

-

ff

o

-

t

a

e

H

:

m

e

t

s

y

S

1

4

0

-

3

0

4

8

9

9

4

1

C

4

3

0

8

T

y

r

u

c

r

e

M

,l

o

o

c

e

g

a

t

s

1

,t

a

e

h

e

g

a

t

s

1

o

t

u

a

-

n

o

:

n

a

F

l

o

o

c

-

ff

o

-

t

a

e

H

:

m

e

t

s

y

S

9

4

0

-

3

0

4

8

0

8

3

-

3

9

F

1

l

o

o

c

e

g

a

t

s

2

,t

a

e

h

e

g

a

t

s

2

e

l

b

a

m

m

a

r

g

o

r

P

c

i

n

o

r

t

c

e

l

E

3

4

0

-

3

0

4

8

0

0

2

M

C

y

r

u

c

r

e

M

,l

o

o

c

e

g

a

t

s

1

,t

a

e

h

e

g

a

t

s

1

o

t

u

a

-

n

o

:

n

a

F

l

o

o

c

-

ff

o

-

t

a

e

H

:

m

e

t

s

y

S

n

o

it

c

A

p

a

n

S

8

4

0

-

3

0

4

8

3

1

3

1

C

0

0

4

8

T

y

r

u

c

r

e

M

,l

o

o

c

e

g

a

t

s

1

,t

a

e

h

e

g

a

t

s

1

o

t

u

a

-

n

o

:

n

a

F

l

o

o

c

-

ff

o

-

t

a

e

H

:

m

e

t

s

y

S

e

l

b

a

m

m

a

r

g

o

r

P

-

n

o

N

c

i

n

o

r

t

c

e

l

E

9

1

0

-

3

0

4

8

0

6

7

1

C

4

7

8

T

2

1

0

-

4

0

4

8

1

0

0

1

A

4

7

6

Q

y

r

u

c

r

e

M

,l

o

o

c

e

g

a

t

s

1

,t

a

e

h

e

g

a

t

s

2

o

t

u

a

-

n

o

:

n

a

F

l

o

o

c

-

o

t

u

a

-

t

a

e

h

:

m

e

t

s

y

S

TRANSFORMER TAPS

230/208V, 1 phase and 3 phase equipment employ dual
primary voltage transformers.  All equipment leaves the
factory wired on 240V tap.  For 208V operation, reconnect
from 240V to 208V tap.  The acceptable operating voltage
range for the 240 and 208V taps are:

TAP

 RANGE

 240

253 – 216

 208

220 – 187

NOTE: The voltage should be measured at the field

power connection point in the unit and while the
unit is operating at full load (maximum
amperage operating condition).

WIRING  –  MAIN POWER

Refer to the unit rating plate for wire sizing information
and maximum fuse size.  Each outdoor unit is marked with
a “Minimum Circuit Ampacity”.  This means that the field
wiring used must be sized to carry that amount of current.
If field installed heaters are added to the basic unit, a
second separate power supply circuit will be required.  The
heater rating plate located adjacent to the basic unit rating
plate will show the appropriate circuit ampacity fuse size,
etc.  (Also see “Electrical Data” on pages 2 and 3.)  All
models are suitable for connection with copper wire only.
These instructions must be adhered to.  Refer to the
National Electrical Code for complete current carrying
capacity data on the various insulation grades of wiring
material.

The electrical specifications on page 2 and 3 lists fuse and
wire sizes (75°F copper) for all models including the most
commonly used heater sizes.

The unit rating plate lists a “Maximum Time Delay Fuse”
or “HACR” type circuit breaker that is to be used with the
equipment.  The correct size must be used for proper
circuit protection and also to assure that there will be no
nuisance tripping due to the momentary high starting
current of the compressor.

WIRING – 24V LOW VOLTAGE CONTROL
CIRCUIT

Five (5) wires should be run from thermostat subbase to
the 24V terminal board in the unit.  A five conductor, 18
gauge copper, color-coded thermostat cable is
recommended.  The connection points are shown in
Figure 8.

THERMOSTATS

See specific wiring information for the different models, heater KWs, and voltages on pages 14 through 17.

IMPORTANT NOTE:  Only the thermostat and subbase combinations as shown above will work with this

equipment.  The thermostat and subbase MUST be matched, and correct operation
can be assured only by proper selection and application of these parts.

Содержание P1060A1

Страница 1: ...MODELS P1142A3 P1148A1 P1060A1 INSTALLATION INSTRUCTIONS Manual 2100 324B Supersedes 2100 324A File Volume II Tab 10 Date 04 01 02 Bard Manufacturing Company Bryan Ohio 43506 Since 1914 Moving ahead...

Страница 2: ...charge Tube Brazing 12 Pressure Table 13 Figures Figure 1 Prefabricated Rood Curb Specifications 5 Figure 2 Field Fabricated Curbing 5 Figure3 Elevated Mounting Platforms 7 Figure 4 Airflow and Servic...

Страница 3: ...and Summer Air Conditioning Duct Design for Residential ACCA Manual D Winter and Summer Air Conditioning and Equipment Selection For more information contact these publishers ACCA Air Conditioning Co...

Страница 4: ...P 3 0 6 4 6 0 5 4 1 4 2 1 1 0 2 4 1 2 1 2 1 TABLE 1 ELECTRICALDATA Q R R TABLE 2 OPTIONALFIELDINSTALLEDHEATERPACKAGES ONLY TO BE USED WITH THE AIR CONDITIONING MODELS INDICATED S Standard application...

Страница 5: ...0 2 0 4 2 3 8 0 2 0 4 2 3 8 0 2 0 4 2 9 5 1 8 1 0 0 7 0 3 0 0 2 1 5 0 0 4 1 6 5 7 6 5 2 1 1 0 5 3 1 0 0 0 3 2 0 0 4 8 3 0 0 1 6 4 7 1 2 2 6 3 4 3 4 1 1 1 8 2 6 4 5 5 0 3 0 5 0 6 0 1 8 6 0 1 0 1 0 1 9...

Страница 6: ...d be carefully read before beginning the installation Note particularly Starting Procedure and any tags and or labels attached to the equipment While these instructions are intended as a general recom...

Страница 7: ...Return Air Dimension C is length Supply Air Dimension C is length Return Air Dimension H is width Supply Sir Dimension J is width f o o R b r u C A B C D E F J H d o o H f o o R l e d o M g n i n o i...

Страница 8: ...be utilized to construct a suitable raised mounting platform See Figure 6 DUCT WORK Refer to Tables 4 5 and 5A when designing duct work for maximum static pressure available with the specific model a...

Страница 9: ...Manual 2100 324 Page 7 FIGURE 3 ELEVATEDMOUNTINGPLATFORMS MIS 1183 MIS 1185 FIGURE 4 AIRFLOWANDSERVICEACCESSCLEARANCES...

Страница 10: ...Manual 2100 324 Page 8 FIGURE 5 ROOFTOPAPPLICATION MAY ALSO BE REQUIRED FOR GROUND LEVEL INSTALLATIONS MIS 1176 FIGURE 6 SLAB MOUNTING AT GROUND LEVEL ABOVE 32 F OUTSIDE TEMPERATURE MIS 1184...

Страница 11: ...ction size or larger Do not operate unit without trap Unit must be level or slightly inclined toward drain With a trap installed on a unit located in an unconditioned area water in the trap may freeze...

Страница 12: ...g at full load maximum amperage operating condition WIRING MAIN POWER Refer to the unit rating plate for wire sizing information and maximum fuse size Each outdoor unit is marked with a Minimum Circui...

Страница 13: ...Manual 2100 324 Page 11 FIGURE 8 LOWVOLTAGEWIRING MIS 1180...

Страница 14: ...tomatically completed on any call for cooling operation or can be energized by manual fan switch on subbase for constant air circulation HEATING A circuit R W1 is completed on each heating cycle energ...

Страница 15: ...pump unit model The lockout features both soft and manual are a function of the Compressor Control Module ADJUSTMENTS ADJUSTABLE DELAY ON MAKE AND DELAY ON BREAK TIMER The potentiometer is used to sel...

Страница 16: ...at joint l e d o M A n o i s n e m i D 3 A 2 4 1 1 P 1 A 8 4 1 1 P 1 A 0 6 0 1 P 5 7 1 5 7 1 5 7 1 TABLE 9 The above suction line temperatures are based upon 80 F dry bulb 67 F wet bulb 50 RH temperat...

Страница 17: ...6 e d i S w o L e d i S h g i H 3 7 3 0 2 4 7 7 1 2 5 7 1 3 2 6 7 6 4 2 8 7 4 6 2 9 7 8 7 2 0 8 4 9 2 1 8 2 1 3 2 8 0 3 3 B D g e d 0 8 B W g e d 7 6 e d i S w o L e d i S h g i H 8 7 8 0 2 9 7 2 2 2...

Страница 18: ...Manual 2100 324 Page 16...

Страница 19: ...Manual 2100 324 Page 17...

Страница 20: ...Manual 2100 324 Page 18...

Страница 21: ...Manual 2100 324 Page 19...

Страница 22: ...Manual 2100 324 Page 20...

Страница 23: ...Manual 2100 324 Page 21...

Отзывы: