Manual 2100-746D
Page
14 of 59
SETUP
Guided Set Up
The MC5300/5600 controller includes a guided set up
feature with two main components, the Equipment and
System Set Up menus. Each screen progresses through
the menus and will build on the last to configure
either the equipment connected to the controller or
the controller features to be used/configured. The
descriptions of the menu options and menu setups are
outlined below:
MC5000 Equipment Setup Menu Descriptions
1. Number of HVAC Systems: 1 – 6
Determines the number of units connected to the
controller, backbone for staging availability and
feature limitations.
2. Number of Compressor Stages: 1 or 2
Determines number of stages and if Y2 is to be
used.
3. Are Units Heat Pumps?: Yes or No
Determines if the units connected to the controller
are heat pumps.
4. Energize O/B During Cooling or Heating:
Cooling or Heating
Determines configuration of the O/B terminal
(energized in cooling or heating).
NOTE:
All Bard
wall-mount heat pumps require the reversing valve
to energize in HEATING mode.
5. Number of Electric Heat Stages: 0, 1 or 2
Determines number of stages to be considered and
if W2 terminal is to be used.
6. Dehumidifier Type:
None, Synchronized or Mechanical
If Synchronized is selected, the “D” terminal is
not used and units will use Synchronized sequence
(see page 25 for information on Synchronized
Dehumidification). If Mechanical is selected,
the D terminal will be energized for Dehum
operation according to Mechanical sequence. If
None is selected, the following step (Number of
Dehumidifier Units) is skipped.
7. Number of Dehumidifier Units:
Choice limited to number of HVAC systems
Sets the number of units equipped with
dehumidification.
8. Humidifier Present: Yes or No
If H is to be used and number of units with
humidification option, limited by the number of
dehumidification units.
9. Auxiliary Output Configuration: Configure
AUX terminal can be configured to provide a
contact change for each of the following conditions
if individually selected: Emergency Off Alarm,
Generator Run Alarm, High Humidity Alarm, Dust
Alarm or Dehumidification Active.
MC5000 System Setup Menu Descriptions (default
indicated in bold)
1. Language –
English
, French or Spanish
2. Password Protection – User can configure password
here (
No
)
3. Twinning Staging Logic –
Off
, All or Pairs
4. Staging Logic –
Alternating
or non-alternating
5. Lead-Lag Change Over Time – Time setting 0-30
days (
7
)
6. Continuous Blower Logic – Lead,
None
, All,
Prepurge or Custom
7. Degrees –
Fahrenheit
or Celsius
8. Temperature Sensor Logic –
Average
, highest or
lowest
9. REM 1 Temperature Sensor – Indoor Temperature
or
Not Connected
10. REM 2 Temperature Sensor – Indoor Temperature,
Outdoor Temperature or
Not Connected
11. Equipment Minimum Run Time – 0-5 minutes (
3
)
12. Maximum Number of Units While in Generator
Mode – Choice limited to number of HVAC systems
(
1
).
13. Touch Screen Display Brightness – 10-100% (
80
)
Equipment Setup Menu
1. Press Setup button on Home screen.
2. Press Equipment Setup button.
3. Press UP/DOWN buttons to scroll to enter number
of HVAC systems; press Next button.
4. Press 1 or 2 button to enter number of compressor
stages; press Next button.
5. Press Yes/No button to select if units are heat
pump units or not; press Next button.
6. Press Cooling or Heating button to select whether
to energize O/B during cooling or heating; press
Next button.
7. Press 2, 1 or 0 button for the number of electric
heat stages; press Next button.
8. Press None, Synchronized or Mechanical button for
dehumidifier type; press Next button.