4. Proper and safe use of the foot system
4.1
Folding out the foot system into the 80° stand
This procedure can be performed by one person.
W
ARNING
:
Preferably wear protective gloves for this operation.
How to fold out the foot system?
1. Fold out both feet, pulling the top of the pro
fi
le indicated in the illustration.
Warning:
Make sure you are positioned between the feet so you can not be hurt when the feet fall down!
PULL
PULL
Image 4-1
2. The feet are now positioned as illustrated below. Push the tile forward until the guiding pin has fallen into the
fi
rst groove of booth
feet.
Note:
The
fi
rst groove is indicated with the red circle.
Warning:
Do not push the tile further forward then necessary. Doing so can damage the shader and can trow you out off
balance.
Warning:
Always
fi
rmly hold the SP-20 tile with both hands.
26
R59770294 SP-20 11/02/2009
Содержание SP-20
Страница 1: ...SP 20 Installation manual R59770294 02 11 02 2009 ...
Страница 4: ......
Страница 6: ...Table of contents 2 R59770294 SP 20 11 02 2009 ...
Страница 33: ...4 Proper and safe use of the foot system 1 2 Image 4 5 R59770294 SP 20 11 02 2009 29 ...
Страница 35: ...4 Proper and safe use of the foot system 1 CLICK 2 Image 4 7 R59770294 SP 20 11 02 2009 31 ...
Страница 36: ...4 Proper and safe use of the foot system 32 R59770294 SP 20 11 02 2009 ...
Страница 39: ...5 Physical installation 1 2 3 4 Image 5 2 R59770294 SP 20 11 02 2009 35 ...
Страница 41: ...5 Physical installation Image 5 5 R59770294 SP 20 11 02 2009 37 ...
Страница 42: ...5 Physical installation 38 R59770294 SP 20 11 02 2009 ...
Страница 46: ...6 Cabling 42 R59770294 SP 20 11 02 2009 ...
Страница 47: ...7 Maintenance 7 MAINTENANCE Overview Cleaning SP 20 tiles R59770294 SP 20 11 02 2009 43 ...
Страница 49: ...8 Order info 8 ORDER INFO Overview Order info R59770294 SP 20 11 02 2009 45 ...
Страница 51: ...A Dimensions A DIMENSIONS Overview Dimensions of the SP 20 tile R59770294 SP 20 11 02 2009 47 ...