22-100
MULTIBLOCK
22-100
MULTIBLOCK
24-225-6
FHCS
24-225-6
FHCS
PANEL SHOULD BE INSTALLED
IN "FLUSH MOUNT" ORIENTATION
MULTIBLOCK
ORIENTATION
Assembly Instructions
71-113-xx & 71-123-xx
Floor Mount Day by the Hour Display Kits
Contact Information:
Parker Hannifin Corporation
Electromechanical Automation Division
email [email protected]
www.parker.com/ips
Two Locations to Serve You:
135 Quadral Drive
Wadsworth, OH 44281
Phone 800.333.4932
Fax 330.334.2350
5500 Business Park Drive
Rohnert Park, CA 94928
Phone 800.358.9070
Fax 707.584.8029
Recommendations:
Time to assemble:
1-2 hours
Assembly area:
10’ x 10’ or larger open floor space.
To prevent scratching, use cardboard or other protective
underlayment.
Required Tools:
• 4 mm hex wrench
• 5 mm hex wrench
• 6 mm hex wrench (ball end)
• Phillips screwdriver
• Flat head screwdriver
• Rubber mallet
Part Number: 70-104
Display Board
Size (ft)
H x W
Display Board Material
Kit
Part Number
3 x 3
Clear Poly Board
71-113-PK
Black Trespa Board
71-113-BK
No Board
71-113-NK
3 x 3
Clear Poly Board
71-123-PK
Black Trespa Board
71-123-BK
No Board
71-123-NK
71-113-xx with
Andon Post Option
71-123-xx