A. NVG option (for SIM 7Q)
1.
First phase (TOD value is increased from 100 on):
CCD
is moving to higher transmission until is has reached full transmission
2.
Second phase (TOD value is increased until 1000):
ECR
is moving to full transmission
3.
Third phase (TOD is set to 1001):
-
NVG
fi
lter
moves out of the light path
-
ECR returns to its minimum, being 40%
-
CCD returns to the position that meets the TOD setting of 1001
-
CLO-TOD tracking Dynacolor set is enabled
4.
Fourth phase (TOD value is further increased):
CCD
is moving to higher transmission until is has reached full transmission
5.
Fifth phase (TOD value is further increased to 10000):
ECR
is moving to full transmission
188
R59770066 SIM 7Q SERIES 08/12/2014
Содержание R92112011
Страница 8: ...Table of contents 4 R59770066 SIM 7Q SERIES 08 12 2014...
Страница 14: ...2 Packaging 10 R59770066 SIM 7Q SERIES 08 12 2014...
Страница 38: ...4 Installation 34 R59770066 SIM 7Q SERIES 08 12 2014...
Страница 52: ...5 Setup 48 R59770066 SIM 7Q SERIES 08 12 2014...
Страница 82: ...7 Advanced Image 7 50 Image 7 51 Image 7 52 78 R59770066 SIM 7Q SERIES 08 12 2014...
Страница 119: ...7 Advanced Image 7 121 Image 7 122 Image 7 123 Image 7 124 R59770066 SIM 7Q SERIES 08 12 2014 115...
Страница 139: ...7 Advanced Image 7 157 R59770066 SIM 7Q SERIES 08 12 2014 135...
Страница 168: ...7 Advanced 164 R59770066 SIM 7Q SERIES 08 12 2014...
Страница 184: ...8 Maintenance 180 R59770066 SIM 7Q SERIES 08 12 2014...
Страница 190: ...10 Environmental information 186 R59770066 SIM 7Q SERIES 08 12 2014...
Страница 196: ...C GLD alignment 192 R59770066 SIM 7Q SERIES 08 12 2014...
Страница 200: ...D Image files 196 R59770066 SIM 7Q SERIES 08 12 2014...
Страница 202: ...Glossary 198 R59770066 SIM 7Q SERIES 08 12 2014...
Страница 206: ...Index Z zoom 41 locking 41 202 R59770066 SIM 7Q SERIES 08 12 2014...
Страница 208: ...List of tables 204 R59770066 SIM 7Q SERIES 08 12 2014...