Installation Set Up
R5975819.05 BARCO CINE 6 21112002 ____________________________________________________________________________ 4-3
After scan inversion, close the chassis, re-install the second top cover, the side covers and the lens top cover.
To install the side covers :
•
Hook the side cover on the both notches and
•
Secure on with the three black screws on the bottom side.
•
Reconnect the power cord to the wall outlet.
Note : Switching over from floor to ceiling or vice versa requires a complete readjustment of picture geometry
and convergence.
Check of the correct connector position
Note : this check procedure can only be done after power (mains) connection.
So, first continue with the
projector set up
and the
connections
and then return to this checking procedure.
Configuration when leaving the factory : ceiling / front configuration.
The three convergence yoke connectors are mounted with the coloured dots on them facing the convergence heatsinks.
For table / front mount
The three connectors must be reversed so that the heatsinks faces the plane surface.
Heatsink