
13
ENERGA 80-50
2.2 PREPARATION FOR POSITIONING
Check all functions of the built-in fi re before fi tting.
• Check the opening and closing operation
of the door.
Documentation
Warranty
Manual
Attributes
Glove (Heat resistant up to max. 95°C)
Operating hook / Poker
2 LOCATION
2.1 INCLUDED
N.B. If any part is missing, please contact your dealer.
Turn the handle all the way down:
Door is locked.
• Handle forwards:
The door releases from its lock and can be opened forwards.
For this, use the operating hook supplied.
Содержание ENERGA 80-50
Страница 2: ......
Страница 3: ...3 ENERGA 80 50 ENERGA 80 50...
Страница 4: ...4 ENERGA 80 50...
Страница 6: ...6 ENERGA 80 50...
Страница 8: ...8 ENERGA 80 50...
Страница 10: ...10 ENERGA 80 50...
Страница 31: ...31 ENERGA 80 50 Dismantle the steel bottom plate Dismantle the lower air slider...
Страница 33: ...33 ENERGA 80 50 Dismantle the fan holder by unscrewing the screws and the fly nuts Fan holder plate rear...
Страница 41: ......
Страница 66: ...66 ENERGA 80 50 13 DIMENSIONS 13 1 ENERGA 80 50 Combustion air supply connection 125 mm...
Страница 67: ...67 ENERGA 80 50 13 1 1 ENERGA 80 50 3 sided 35 mm frame Combustion air supply connection 125 mm...
Страница 68: ...68 ENERGA 80 50 13 1 2 ENERGA 80 50 4 sided 35 mm frame Combustion air supply connection 125 mm...
Страница 74: ...74 ENERGA 80 50...
Страница 75: ......
Страница 76: ...01 011213 332127 Your Barbas dealer...