16
ECO 550
ECO 650
ECO 750
SAVANNAH
ATLANTA
2.5.7 Checking the Appliance Following Installation
After installation, the installer needs to visually check the gas flames. When the
fire is ignited, the flames should be short and blue/yellow in colour. These flames
should gradually increase in height and become more yellow. When all flames are
yellow, the gas fire has reached the correct temperature.
The installer should also verify, by using the appliance for the first time, after 10
minutes of operation, that there is no flue leakage.
THE GAS FIRE IS NOW READY FOR USE
Figure 5: Log set natural gas ATLANTA / SAVANNAH / ECO 550 / ECO 650 /
ECO 750
Figure 6: Log set propane ATLANTA / SAVANNAH / ECO 550 / ECO 650 /
ECO 750
6
5
4
3
2
1
5 4 2 1 3
6
Содержание ATLANTA
Страница 3: ...4 ECO 550 ECO 650 ECO 750 SAVANNAH A TLANTA...
Страница 18: ...19 ENGLISH A TLANTA SAVANNAH ECO 550 ECO 650 ECO 750 Figure 7 ATLANTA SAVANNAH ECO 550...
Страница 20: ...21 ENGLISH A TLANTA SAVANNAH ECO 550 ECO 650 ECO 750 Gas connection 6 DIMENSIONS 6 1 ATLANTA SAVANNAH...
Страница 21: ...22 ECO 550 ECO 650 ECO 750 SAVANNAH A TLANTA Gas connection 6 2 ECO 550...
Страница 22: ...23 ENGLISH A TLANTA SAVANNAH ECO 550 ECO 650 ECO 750 Gas connection 6 3 ECO 650...
Страница 23: ...24 ECO 550 ECO 650 ECO 750 SAVANNAH A TLANTA Gas connection 6 4 ECO 750...