Installation
7
Mounting
1. Choose a solid wall/ground to mount the CPE.
2. Mount on a wall/pole that can sustain the CPE dimensions and weight.
3. Mount upright on a vertical surface.
Position Adjustment
1. The CPE must be directed towards the nearest base station. By pointing the CPE
in the proper direction ensures that you receive the strongest signal.
2. Fine tune the signal by adjusting the orientation horizontally or vertically to
increase the CPE signal strength.
3. To verify the signal strength level:
Check the LEDs on the front panel - more lighted LEDs indicates stronger
signal.
Access the web management and go to
Basic Mode > Status > Mobile
Internet > Signal Quality
to view the Rx signal strength.
Warning:
To receive stronger signal and to avoid possible RF radiation, please
do
NOT
place your head or body in front of the CPE while you are
positioning the CPE or checking the signal strength LEDs on the front
panel.
Содержание E5812P Series
Страница 1: ...User Manual BandLuxe E5812P Series LTE Outdoor CPE P N 65021100021 Rev A...
Страница 2: ......