Installation
6
Important Installation Considerations
Before installing the outdoor CPE, consider the appropriate location,
clearance, and device orientation.
Location and Cable wiring
1. Consult your Service Provider to find the best location and angle for getting the
strongest signal from the base station.
2. Do a walking test around the house to find the best spot with the strongest signal
if you don’t obtain related information from Service Provider.
3. Mount the CPE at the highest possible location with a clear view of the base
station signal source. Buildings or other obstructions will affect the quality of the
signal you receive.
4. Keep the best distance as possible from other devices that may cause
interference.
5. Check if you can route the cable through the available ventilation holes to avoid
unnecessary drilling and waterproofing the wall.
6. Disconnect the power cord first before mounting the CPE. Otherwise this may
result in personal injury due to electric shock.
Содержание E5812P Series
Страница 1: ...User Manual BandLuxe E5812P Series LTE Outdoor CPE P N 65021100021 Rev A...
Страница 2: ......