background image

 

 

Scranton, IA  51462

 

Phone (712) 652

-

3424

 

www.bdmfginc.com

 

12

 

ROTATIONAL CONTROL CONNECTED TO HSS BUFFER TANK

 

If your using the Rotational Control Panel (BDCB

-

RC4HP) with the B&D HSS Buffer Tank Controls, the main HSS Control 

Box Board (B3

-

6CR) XY,XR,XY terminals will need to communicate to the Rotational Control Board (BDCB

-

RC) demand 

signal contacts.

 

  

 

See below for the location of the 3 wires that need to be run from the main HSS Control Box Board (B3

-

6CR) 

XY,XR,XY terminals  to the Rotational Control Board (BDCB

-

RC) demand signal contacts.  

 

 

The main HSS Control Box Board (B3

-

6CR) requests demand for hot/cold water based on its current controls method. XY 

terminal  closes  on  HSS  B3

-

6CR  Main  Board  sending  the  power  it  receives  from  the  Rotational  Board  (BDCB

-

RC)  XR    

terminal back to the Rotational Board (BDCB

-

RC) XY terminal. 

 

 

This  will  start  a  water  device.  The  water  device  that  is  started  depends  on  where  it  left  off  in  its  rotational  control      
program. The device that is on has a light designating that it is actively running. This then starts the Rotational Controls 
functionality.

 

 

See previous page 10 for the 1st and 2nd stage lighting identification of the Rotational Board (BDCB

-

RC) 

 

R9

RLY10

T

R

A

N

C

R3

RLY1

15-A

MAIN

MA

IN

 F

US

E

WHT

L

IN

E

L

IN

E

F

U

SE
D

110V

BLK

J1 

C

O

M

C

O

M

D6

D4

D5

LED2

RLY3

C2

D2

D3

D1

C1

LED1

R1

RLY2

R2

FU2

PUMP

J3

L 2 N

FU1

PUMP

J2

L 1 N

FU

SE

 P

UM

P

 1

FU

SE

 P

UM

P

 2

LED5

R5

D

12

D

10

D

11

D9

RLY5

C3

R4

LED4

C4

FU4

PUMP

J5

L 4 N

FU3

FU

SE

 P

UM

P

 3

FU

SE

 P

UM

P

 4

D7

LED3

D8

PUMP

L 3 N

J4

RLY4

D

19

D

20

D

18

D

16

D

17

RLY7

C6

FU6

PUMP

HO

HO

H/C

HO

HO

H/C

H/C

HO

HO

J7

L 6 N

FU

SE

 P

UM

P

 6

D

15

D

13

D

14

C5

RLY6

FU5

PUMP

J6

L 5 N

FU

SE

 P

UM

P

 5

R6

LED6

12F

R

12

Q1

48

R8

C

OOL

96

R7

H

EAT

TE

S

T

LED7

623

LED8

RLY8

RLY9

J9

C C

TC

XR

TC

XY XO

J8

O

CR

H

J11

J10

R

24V

E

XPAN

D

O

C

Y

R

O

R

Y

C

J13

T2

J12

T1

C

O

R

C

Y

O

R

T4

J15

Y

C

T3

J14

O

R

C

Y

O

R

Y

H/C

J17

T6

H/C

H/C

H/C

T5

J16

HO

HO

HO

B&D MFG Model B3-6CR

Scranton Iowa 51462

R12

C11

Q2

C10

R

11

R10

C9

D

22

D

21

D21

HO

H/C

H/C

H/C

HO

B&D HSS BUFFER TANK MAIN BOARD(B3

-

6CR)

 

XY,XO,XR

 

24V DRY CONTACT

 

 TERMINALS

 

DEMAND SIGNAL 

 

TERMINAL CONTACTS

 

XY,XO,XR

 

See below for the Rotational Board (BDCB

-

RC) demand signal contacts as mentioned above.

 

B&D ROTATIONAL BOARD (BDCB

-

RC)

 

Содержание BDCB-RC

Страница 1: ...INSTALLATION MANUAL LET US MAKE YOUR HYDRONICS SYSTEM EASIER WWW BDMFGINC COM BY B D MFG INC ...

Страница 2: ...rol Panel Wiring Schematic 5 Mounting the Rotational Control Panel 6 Immersion Well Installation 7 Wiring Thermistor to the Rotational Board 8 Wiring Demand Signal 8 Wiring Heating Cooling Equipment to Rotational Panel 9 Setting Up Rotational Control and Staging Set Points 9 Temperature Controller Programming 10 Functionality of Rotational Controller 11 Rotational Control Connected to HSS Buffer T...

Страница 3: ...anual before starting the installation WARRANTY B D Mfg Inc warrants for a period of three 3 years from date of purchase that all Rotational Control BDCB RC4HP circuit boards are free from defects in materials and workmanship B D Mfg Inc warrants for a period of one 1 year from date of purchase that all other parts are free from defects in materials and workmanship No allowance for labor or proper...

Страница 4: ...When working on the equipment observe precautions in the literature tags stickers and labels attached to the equipment and to any other safety precautions that apply When the Rotational Control BDCB RC4HP is operating some components you should not touch Personal injury can result from touching these items with any object All electrical and service access panels must be returned and secured in the...

Страница 5: ...IONS B D TEMPERATURE CONTROL H2 2TC B D ROTATIONAL BOARD BDCB RC CONTROL PANEL COMPONENTS INFORMATION NOTE All BDCB RC4HP control panels come prewired with labels and a wiring decal mounted on the inside of the control panel door Scranton IA 51462 Phone 712 652 3424 www bdmfginc com ...

Страница 6: ...ing Light 3 24VAC Out Terminal 4 H2TC C Terminal 5 H2TC B Terminal 6 H2TC A Terminal 7 Demand Signal Contacts ITEM DESCRIPTION 8 Device Number Pin 9 2nd Stage Pin Adjustment 10 2nd Stage Light Equip 1 11 Equip 1 Dry Contacts 12 1st Stage Light Equip 1 13 2nd Stage Light Equip 2 14 Equip 2 Dry Contacts ITEM DESCRIPTION 15 1st Stage Light Equip 2 16 2nd Stage Light Equip 3 17 Equip 3 Dry Contacts 18...

Страница 7: ...REEN GRAY WHITE GRAY BLACK WHITE GRAY BLACK 24VAC XR XO XY2 XY1 24VAC XR XO XY2 XY1 24VAC XR XO XY2 XY1 24VAC XR XO XO XR XY Y1 Y2 XO XR PUMP 4 Y1 Y2 XO XR PUMP 3 Y1 Y2 XO XR PUMP 2 Y1 Y2 XO XR PUMP 1 CIT RELAY 10A 277VAC COIL 24VDC CIT RELAY 10A 277VAC COIL 24VDC CIT RELAY 10A 277VAC COIL 24VDC CIT RELAY 10A 277VAC COIL 24VDC CIT RELAY 10A 277VAC COIL 24VDC CIT RELAY 10A 277VAC COIL 24VDC CIT REL...

Страница 8: ...e unit on the mounting surface so that the wiring can be accomplished with minimal amount of difficulty Mark the location of the mounting holes on the mounting surface Remove the unit from the mounting area and drill the appropriate size pilot hole for the mounting screws Mount the unit by installing a screw through each of the three holes provided in the enclosure Be sure the unit is securely fas...

Страница 9: ... Tank Control Box If you chose to use a location other than the HSS Buffer Tank immersion well it is recommended to use an immersion well assembly to give the best results for a temperature reading Please see illustration below to help guide you to a proper installation to adding the Rotational Control Panel immersion well probe into your designated location NOTE Prior to inserting the sensor a sm...

Страница 10: ...minal is a communication port only and must only be connected to another TX communication terminal If power is applied to this terminal the internal circuitry of the B D Temperature Board H2 2TC will be damaged in which case the warranty for this product will be voided NOTE XY XO XR Terminals are powered contacts These contacts send out 5vDC Has to be wired to a dry set of contacts THERMISTOR CONN...

Страница 11: ... are 24V dry contacts Y1 Y2 XO XR TERMINALS 24V EQUIPMENT TERMINAL CONTACTS B D ROTATIONAL BOARD BDCB RC Setting Up Rotational Control and Staging Set Points User places jumper on pins designated for the number of water devices they are wiring to the control board NOTE User can choose between 2 3 or 4 devices User places jumper on pins designated for the delay required for all second stages of dev...

Страница 12: ... will show HEA or COL by pressing the up and down button allows the setting change from HEA or COL The setting must be HEA 7 Press the mode button again to change to temperature differential SP2 After 2 seconds the LCD will display a number by pressing up and down button allows the setting change the number setting 8 Press the mode again and the LCD displays HS2 after 2 seconds the LCD will show c...

Страница 13: ...e that is started depends on where it left off in its rotational control program The device that is on has a light designating that it is actively running This then starts the Rotational Controls functionality The control will then rotate which water device comes on first on a demand call It does this by rotating to the next device in the connection series when demand goes away Ex 1 2 3 4 2 3 4 1 ...

Страница 14: ...s actively running This then starts the Rotational Controls functionality See previous page 10 for the 1st and 2nd stage lighting identification of the Rotational Board BDCB RC R9 RLY10 TRANS C R3 RLY1 15 A MAIN MAIN FUSE WHT LINE LINE FUSED 110V BLK J1 COM COM D6 D4 D5 LED2 RLY3 C2 D2 D3 D1 C1 LED1 R1 RLY2 R2 FU2 PUMP J3 L 2 N FU1 PUMP J2 L 1 N FUSE PUMP 1 FUSE PUMP 2 LED5 R5 D12 D10 D11 D9 RLY5 ...

Страница 15: ...p then power on Simulate a call then power off Relocate the jumper onto the proper number of pumps for the system Turn the controller back on The next time a call is received Pump 1 will be the first to power on See below for the location of the jumper pins Number of Devices Pin Adjustment B D ROTATIONAL BOARD BDCB RC NOTES Scranton IA 51462 Phone 712 652 3424 www bdmfginc com 13 ...

Страница 16: ...mal innovation to the forefront of green energy Our goal is to utilize non pressurized products while meeting all geothermal product needs We strive to always have the products our distributors need in stock As one of the leaders in geothermal B D plans to grow with the industry and continue to push the industry with creative ideas quality products and great distributor service ...

Отзывы: