background image

6 - 8 Fiveways Boulevard, Keysborough, VIC, Australia 3173           
P: 1300 133 944      E: [email protected]      
W: www.automatictechnology.com.au

B&D Doors is a division of B&D Australia Pty Ltd 

ABN 25 010 473 971

B&D Doors, 34-36 Marigold St, Revesby, NSW, 2212
P: 13 62 63 

E: [email protected]

W: www.bnd.com.au

© Nov 2018 Automatic Technology (Australia) Pty Ltd. All rights reserved. No part of this document may be reproduced without prior permission. In an ongoing 

commitment to product quality we reserve the right to change specification without notice. E&OE.

Symptom

Possible cause

Remedy

Door stops or moves very slowly 

under battery power

Batteries may be weak or have 

no charge

Connect mains power and allow the batteries 

to charge. This may take 24 - 48 hours to reach 

maximum charge capacity.

Door will not operate when 

mains power is disconnected.

Batteries / charger board may 

not be connected properly.

Check wiring.

Batteries may have no charge

Connect mains power and allow the batteries 

to charge. This may take 24 - 48 hours to reach 

maximum charge capacity.

Faulty Charger board

Disconnect the charger board from batteries and 

control board. Check voltage of the charger board. 

Voltage should be approximately 27.5V.

Faulty Batteries

Disconnect the batteries from the charger board. 

Check the voltage of the each battery. Voltage 

should not drop below 10V.

Troubleshooting

Maintenance

To ensure a long trouble free life for your battery backup it is recommended you run the testing procedure on a monthly basis. 

Batteries should not need replacing for 4 - 5 years.

Testing Procedure:

a.  Press the transmitter to activate the opener. 

b. Whilst the door / gate is in motion disconnect power. The door / gate should complete the cycle as normal.

c.  Wait for the door / gate to finish is travel.

d. Press the transmitter to activate the opener.

e.  Whilst the door / gate is in motion reconnect power. If the door / gate stopped or moved very slosly under battery power, 

ensure mains power is connected for 24 - 48 hours to recharge the batteries. Test the opener again under battery power to 

ensure batteries are working effectively.

Warranty

This warranty is to be read in conjunction with the owner’s copy of 

the opener installation instruction.

WARRANTY

ACCESSORIES

1 year

Содержание Automatic Technology Battery Backup Gen 2 Kit

Страница 1: ...17 TAPTITE SCREW P M4x10 2 18 CABLE CLAMP ACC 1 5 3 16 1 BATTERY BACKUP KIT SBC 02 SAP NO MC0090 ITEM DESCRIPTION QTY 19 BATTERY CHARGER BOX ASSEMBLY 1 20 CHARGER ASSY SBC 02 1 ACCESSORY PACK 21 TIE MOUNT CM 13 ADHIESIVE 4 22 CABLE TIE 4 GT 100M 4 23 BRACKETS GE 44 621 4 24 SCREW P M3 5 X 13 FOR GW 44 621 4 Garage Door Openers Swing Gate Openers BATTERY BACKUP KIT ESV24V2 SAP NO 69767 ITEM DESCRIP...

Страница 2: ...atteries may release explosive gases Ensure that the area around the batteries is well ventilated Take care not to allow any metal objects to make contact with the positive and negative terminals This will short circuit the battery causing sparks and possible damage to the battery or even cause an explosion ELECTROCUTION The battery box unit should be installed away from sprinkler systems DO NOT i...

Страница 3: ...active even when power is off This is a result of a residual charge in the batteries b Connect battery harnesses 5 and 10 together c Close the cover secure the Light Diffuser with 2 screws and reconnect power NOTE Batteries may take up to 48 hours to charge fully after initial installation Re setup and Test the Opener a Reconnect power and remove button cover b Press either the OSC button the open...

Страница 4: ...ion the wire battery harness 10 neatly and secure left side of battery kit with cable clamp 7 WARNING After Step c the opener may become active even when power is off This is a result of a residual charge in the batteries c Connect battery harnesses 5 and 10 together d Close the timing cover light diffuser and reconnect power NOTE Batteries may take up to 48 hours to charge fully after initial ins...

Страница 5: ... affix with 2 two Taptite P M3 5 x 8 screws 33 ii For brick walls place the battery backup kit over the holes and affix with 2 two Taptite P M3 5 x 8 screws 33 WARNING After Step b the opener may become active even when power is off This is a result of a residual charge in the batteries c Connect battery harness 32 to the harness extension 35 NOTE Batteries may take up to 48 hours to charge fully ...

Страница 6: ...attery Box s nylon gland d Connect the red wire to the Battery Box s terminal and the black wire to the terminal e Feed the other end of the 2 core 18awg gauge cable through the control box s gland f Connect the red wire to the Charger Board s Battery Harness BAT connector and the black wire to the BAT connector Re setup and Test the Opener a Reconnect power b Select Menu 7 on the DCB 05 control b...

Страница 7: ...ttery coupling wire 27 through the main cover b Secure the lid to the main cover with screws c Connect battery harnesses 27 and 28 together NOTE Batteries may take up to 48 hours to charge fully after initial installation Re setup and Test the Opener a Reconnect power b Select Menu 7 on the control board press SET select Sub Menu 7 Battery Solar and enable using the OPEN and CLOSE buttons c Setup ...

Страница 8: ...s to reach maximum charge capacity Faulty Charger board Disconnect the charger board from batteries and control board Check voltage of the charger board Voltage should be approximately 27 5V Faulty Batteries Disconnect the batteries from the charger board Check the voltage of the each battery Voltage should not drop below 10V Troubleshooting Maintenance To ensure a long trouble free life for your ...

Отзывы: