background image

B&D Doors is a division of B&D Australia Pty Ltd 

P: 13 62 63 

W: www.bnd.com.au

Mount the Charger Board

a.  Unplug the drive unit from mains power.

b. Remove screws and swing open the cover.

c.  Mount the PCB support 

15

 with two screws 

13

. Secure the  charger board 

 8

 on to PCB support with 3 screws 

14

.

d. Unscrew the 2-wire SBY-2 battery harness 

10

 from the 2 pin connector on 

the charger board 

 8

. Feed the 2-wire SBY-2 battery harness 

10

 through the 

grommet on the base plate and secure back on the 2 pin connector.

e.  Remove two (2) screws from the Light Diffuser to access the main control 

board.

f.  Remove the shunt from the 5 pin connector on the control board. Feed the 

charger harness 

 9

 from the charger board 

 8

  through the cover and insert 

into the 5 pin connector on the main control board. 

Mount & Connect the Battery

a.  Mount battery pack on side of unit and secure with items 

11

 and 

12

.

WARNING:

 After Step (b) the opener may become active (even when 

power is off). This is a result of a residual charge in the batteries. 

b. Connect battery harnesses 

 5

 and 

10

 together.

c.  Close the cover, secure the Light Diffuser with 2 screws and reconnect 

power.

NOTE:

 Batteries may take up to 48 hours to charge fully after initial installation.

Re-setup and Test the Opener

a.  Reconnect power and remove button cover.

b. Press either the OSC  button the opener or the programmed transmitter 

button to test the battery backup installation.

c.  Whilst door is in motion, disconnect mains power. The door should continue 

to operate as normal.

NOTE:

 

Wait for the door to complete its travel.

d. Press either the OSC button on the opener or the progammed transmitter 

button to activate the door.

e.  Whilst door is in motion, reconnect power and re-install button cover. The 

door should complete the cycle as normal.

Grommet

Light Diffuser

Overhead Door Opener Set Up

GDO-9V2 GEN2 Enduro, GDO-9V3 GEN2 Dynamo, SDO-2V2 CAD P Diamond, 

SDO-2V2 CAD Advance, SDO-2V3 CAD Prodigy & SDO-3V2 CAD S

SDO-2V3 Prodigy:  

The Charger board is already installed with the unit. 

Please proceed to Mount & Connect the Battery

.

Содержание Automatic Technology Battery Backup Gen 2 Kit

Страница 1: ...17 TAPTITE SCREW P M4x10 2 18 CABLE CLAMP ACC 1 5 3 16 1 BATTERY BACKUP KIT SBC 02 SAP NO MC0090 ITEM DESCRIPTION QTY 19 BATTERY CHARGER BOX ASSEMBLY 1 20 CHARGER ASSY SBC 02 1 ACCESSORY PACK 21 TIE MOUNT CM 13 ADHIESIVE 4 22 CABLE TIE 4 GT 100M 4 23 BRACKETS GE 44 621 4 24 SCREW P M3 5 X 13 FOR GW 44 621 4 Garage Door Openers Swing Gate Openers BATTERY BACKUP KIT ESV24V2 SAP NO 69767 ITEM DESCRIP...

Страница 2: ...atteries may release explosive gases Ensure that the area around the batteries is well ventilated Take care not to allow any metal objects to make contact with the positive and negative terminals This will short circuit the battery causing sparks and possible damage to the battery or even cause an explosion ELECTROCUTION The battery box unit should be installed away from sprinkler systems DO NOT i...

Страница 3: ...active even when power is off This is a result of a residual charge in the batteries b Connect battery harnesses 5 and 10 together c Close the cover secure the Light Diffuser with 2 screws and reconnect power NOTE Batteries may take up to 48 hours to charge fully after initial installation Re setup and Test the Opener a Reconnect power and remove button cover b Press either the OSC button the open...

Страница 4: ...ion the wire battery harness 10 neatly and secure left side of battery kit with cable clamp 7 WARNING After Step c the opener may become active even when power is off This is a result of a residual charge in the batteries c Connect battery harnesses 5 and 10 together d Close the timing cover light diffuser and reconnect power NOTE Batteries may take up to 48 hours to charge fully after initial ins...

Страница 5: ... affix with 2 two Taptite P M3 5 x 8 screws 33 ii For brick walls place the battery backup kit over the holes and affix with 2 two Taptite P M3 5 x 8 screws 33 WARNING After Step b the opener may become active even when power is off This is a result of a residual charge in the batteries c Connect battery harness 32 to the harness extension 35 NOTE Batteries may take up to 48 hours to charge fully ...

Страница 6: ...attery Box s nylon gland d Connect the red wire to the Battery Box s terminal and the black wire to the terminal e Feed the other end of the 2 core 18awg gauge cable through the control box s gland f Connect the red wire to the Charger Board s Battery Harness BAT connector and the black wire to the BAT connector Re setup and Test the Opener a Reconnect power b Select Menu 7 on the DCB 05 control b...

Страница 7: ...ttery coupling wire 27 through the main cover b Secure the lid to the main cover with screws c Connect battery harnesses 27 and 28 together NOTE Batteries may take up to 48 hours to charge fully after initial installation Re setup and Test the Opener a Reconnect power b Select Menu 7 on the control board press SET select Sub Menu 7 Battery Solar and enable using the OPEN and CLOSE buttons c Setup ...

Страница 8: ...s to reach maximum charge capacity Faulty Charger board Disconnect the charger board from batteries and control board Check voltage of the charger board Voltage should be approximately 27 5V Faulty Batteries Disconnect the batteries from the charger board Check the voltage of the each battery Voltage should not drop below 10V Troubleshooting Maintenance To ensure a long trouble free life for your ...

Отзывы: