Installing BAND-IT Center Punch Clamps:

1)

Choose correct material type and diameter clamp to best satisfy the needs of the application.

2)

Installation of two BAND-IT Center Punch Clamps per hose end is suggested. Place clamps over hose, then 
install fitting. Note the location of the fitting’s hose barbs in order to locate clamps between barbs for maximum 
fitting retention. The buckles of each clamp should be located opposite of each other to increase resistance to 
leak paths. 

3)

Insert the clamp tail fully into the nose of the tool with the buckle on top.  Position the clamp in the desired 
location on hose.

4)

Small diameter hose assemblies (less than approximately 2”) will receive a considerable impact during the lock 
and clamp tail cut-off process.  For stiff hoses, it will help to lessen the impact by holding these small hose 
assemblies with only one hand on the hose end of the assembly (do not hold the end of the assembly with the 
fitting).  This will soften the jolt and allow the assembly to swing down to absorb the impact.  For flat or thin-wall 
hose, inserting an object that is soft and safe to hold into the end of the fitting for additional support may help.  
Large diameter hose assemblies should be held securely with both hands.

Keep hands away from clamp being applied!

5)

Depress the toe end of the foot pedal control to tension clamp, keep the toe end down until the clamp has been 
fully tensioned, locked and cut-off is complete.

6)

If the cylinder reaches the end of its stroke during tension, the cutoff cylinder will be disabled and the end-of-
stroke indicator will turn red. Pull firmly on the clamp while reversing the cylinder. Remove the clamp.  Before 

Installing 
Clamps

Document# P47050 Rev. -

© Copyright 

BAND-IT-IDEX, Inc. 2008

All rights reserved

www.BAND-IT-IDEX.com

BAND-IT-IDEX, Inc.

A Unit of IDEX Corporation

4799 Dahlia Street Denver, CO 80216-3070 USA

P: 1-800-525-0758   F: 1-800-624-3925

6

stroke indicator will turn red. Pull firmly on the clamp while reversing the cylinder. Remove the clamp.  Before 
regripping, cut off any tail greater than 4 inches. Start the tension cycle over at step 3.

7)

Depress the heel end of the foot control and retrieve the clamp tail from the tool head.

Clamp tail inserted into blade 
assembly

Guard/tail depressor provides downward 
pressure on scrap clamp tail.

Clamp tail in normal return 
position. Pull tail from tool.

Содержание GRSM17

Страница 1: ...Denver CO 80216 3070 USA P 1 800 525 0758 F 1 800 624 3925 1 Table of Contents Page Information 2 Safety Guidelines and Warranty 3 Tool Overview and Installation 4 Air System Requirements 5 Setting Co...

Страница 2: ...er CO 80216 3070 USA P 1 800 525 0758 F 1 800 624 3925 2 harm Disconnect air supply prior to maintenance and disassembly of tool components Important advice and warning to user Read before applying cl...

Страница 3: ...eted and clamp tail is ready to be removed from the tool Upon completion of the tension lock and cut off cycle the operator should depress the heel Tool Overview and Installation Document P47050 Rev C...

Страница 4: ...blockage of air mufflers and a dirty environment Solvents Liquids such as solvents or cleaners should never be added to the air system through air lines Air System Requirements Oil drip rate Document...

Страница 5: ...X com BAND IT IDEX Inc A Unit of IDEX Corporation 4799 Dahlia Street Denver CO 80216 3070 USA P 1 800 525 0758 F 1 800 624 3925 5 pressure setting from below by increasing pressure Suggested settings...

Страница 6: ...rting an object that is soft and safe to hold into the end of the fitting for additional support may help Large diameter hose assemblies should be held securely with both hands Keep hands away from cl...

Страница 7: ...t lock Trouble Shooting Guide Document P47050 Rev Copyright BAND IT IDEX Inc 2008 All rights reserved www BAND IT IDEX com BAND IT IDEX Inc A Unit of IDEX Corporation 4799 Dahlia Street Denver CO 8021...

Страница 8: ...ce Frequency Component Check Preventative Maintenance Schedule Document P47050 Rev Copyright BAND IT IDEX Inc 2008 All rights reserved www BAND IT IDEX com BAND IT IDEX Inc A Unit of IDEX Corporation...

Страница 9: ...to BAND IT Center Punch Head Information Document P47050 Rev Copyright BAND IT IDEX Inc 2008 All rights reserved www BAND IT IDEX com BAND IT IDEX Inc A Unit of IDEX Corporation 4799 Dahlia Street De...

Страница 10: ...ent P47050 Rev Copyright BAND IT IDEX Inc 2008 All rights reserved www BAND IT IDEX com BAND IT IDEX Inc A Unit of IDEX Corporation 4799 Dahlia Street Denver CO 80216 3070 USA P 1 800 525 0758 F 1 800...

Страница 11: ...r Pressure Gauges 2 Air Pressure Regulators 2 Air Connections for Supply to Cut off Cylinder End of Stroke Indicator Document P47050 Rev Copyright BAND IT IDEX Inc 2008 All rights reserved www BAND IT...

Страница 12: ...t BAND IT IDEX Inc 2008 All rights reserved www BAND IT IDEX com BAND IT IDEX Inc A Unit of IDEX Corporation 4799 Dahlia Street Denver CO 80216 3070 USA P 1 800 525 0758 F 1 800 624 3925 12 LENGTH INC...

Страница 13: ...rranty html Factory Services Additional Factory Support and Tool Service Document P47050 Rev Copyright BAND IT IDEX Inc 2008 All rights reserved www BAND IT IDEX com BAND IT IDEX Inc A Unit of IDEX Co...

Отзывы: