background image

E

N

G

L

I

S

H

11 / 18

0006081159_201102

HYDRAULIC DIAGRAM FOR 

8502cmt18.tif

Light oil electrovalve

Nozzle

Light oil pump 

 

(12 bar pressure)

Return

Suction

Foot valve

ELECTRICAL CONNECTIONS

Electric lines should be at an adequate distance from 
hot parts. Make sure that all electrical connections are 

made with flex electric wire, with suitable size for the 

voltage and absorbed power.
Maximum current absorbed = 600 VA
Minimum section of the feed line = 1mm

2

 with 230V.

For  the  LGB  22  control  box,  the  intensity  of  the  cell 
current should be between 200 microamperes and 500 
microamperes.

DUAL FUEL BURNER’S FIRING INDICATION

We suggest to start the burner with the liquid fuel, as in this case 

the delivery is bound to the nozzle size whilst the gas delivery can 

be easily changed by acting on the relative capacity adjuster.

If the burner is in the automatic version, the selector for the fuel 

change connects a cyclic relay which inserts, tanks to an auxiliary 

relay, components for the use of both fuels (valves, pressure 

switches, pump etc.).

After having changed the position of the selector from gas to light oil 

and voiceovers, it occurs to leave it stopped for at least 10 seconds 

which is the time the cyclic relay needs to carry out its program.

ATTENTION 

If the selector is moved from a position to another before the period 

of 10 seconds, the cyclic relay stops in the middle of its program not 

allowing to use the burner both with gas and with light oil.

Nozzle

G.P.H.

Pump pressure bar

8

9

10

11

12

13

14

0,60

2,04 2,16 2,28 2,39 2,50 2,60

2,70

0,65

2,21 2,34 2,47 2,59 2,71 2,82

2,92

0,75

2,55 2,70 2,85 2,99 3,12 3,25

3,37

0,85

2,89 3,06 3,23 3,39 3,54 3,68

3,82

1,00

3,40 3,61 3,80 3,99 4,16 4,33

4,50

1,10

3,74 3,97 4,18 4,38 4,58 4,77

4,95

1,20

4,08 4,33 4,56 4,78 5,00 5,20

5,40

1,25

4,25 4,50 4,75 5,00 5,20 5,40

5,60

1,35

4,59 4,87 5,13 5,38 5,62 5,85

6,07

1,50

5,10 5,41 5,70 5,90 6,24 6,50

6,75

1,65

5,61 5,95 6,27 6,58 6,87 7,15

7,42

1,75

5,95 6,31 6,65 6,98 7,29 7,58

7,87

2,00

6,80 7,21 7,60 7,97 8,33 8,67

8,99

2,25

7,65 8,15 8,55 8,97 9,37 9,75 10,12

2,50

8,50 9,01 9,50 9,97 10,41 10,83 11,24

CHECKS PRIOR LIGHT OIL FIRING

Make sure that the nozzle with sprouting angle at 60° is suitable to 

the boiler’s capacity.

In the list hereunder you find the delivery values in kg/h of light oil 

related to the nozzle’s size and to the pump’s pressure (normally 

12 bar).   (Please note that 1 light oil kg corresponds to 10.200 

kcal about).

Make sure that the protrusion of the combustion head inside 

the combustion chamber is according to boiler manufacturer’s 

instructions.

Make sure that the return pipe in tank has no obstructions, such as 

gates closed caps etc.

Probable obstructions could cause faults on the pump’s shaft or 

flex pipe.

Open slightly the air purge device of the pump.

Disconnect the wire number 39 which feeds the pump motor from 

the terminal on the contactor “K1” and connect it from moment the 

terminal “K1.56” of the “input junction box” so as to feed directly 

the pump motor.

Now close the reverser-switch on the burner and the general one 

and make sure that the rotation sense is correct.   Thus the pump 

motor is connected and starts the pump witch sucks the light oil.

When the light oil flow the air purge device open the main switch 

so as to stop the motor.

Be set original connections to the corresponding terminals.

The burner is thus ready to operate at light oil.

TABLE OF NOZZLE DELIVERY RATES IN Kg/h OF LIGHT 

OIL

Содержание Minicomist 7

Страница 1: ...EN TR MINICOMIST 7 MINICOMIST 11 ORIGINAL INSTRUCTIONS ARE IT OR J NAL KULLANIM KILAVUZU IT 0006081159_201102 Kullan m talimatlar k lavuzu Manual instructions for use...

Страница 2: ......

Страница 3: ...works are not carried out correctly it is possible to cause dangerous accidents E N G L I S H T r k e Br l r ilk defa kullanmadan nce l tfen r n n b t nle ik ve l zumlu bir par as olarak br l rle ber...

Страница 4: ...Directives 90 396 CEE D A G 89 336 CEE 2004 108 CE C E M 73 23 CEE 2006 95 CE D B T 2006 42 CEE D M and conform to European Standards UNI EN 676 2008 gas and combination gas side UNI EN 267 2002 dies...

Страница 5: ...r or if the owner moves and leaves the equipment make sure that the booklet always goes with the equipment so it can be consulted by the new owner and or installer For all equipment with optionals or...

Страница 6: ...rent law and regulations since incorrect installation may cause damage to person animals or things for which damage the manufacturer shall not can be held responsible Before installation it is advisab...

Страница 7: ...UT MIN kW 38 5 58 4 MAX kW 66 8 103 VISCOSITY Light oil 1 5 E a 20 C VOLTAGE 50Hz Volt 1 230V FAN MOTOR 50Hz kW 0 13 2800 r p m PUMP MOTOR 50Hz kW 0 075 2780 r p m IGNITION TRANSFORMER 50Hz 8 kV 20 mA...

Страница 8: ...witch 9 Terminal board box 10 Electric panel 11 Reset button 12 Flame detector 13 Combustion head 14 Insulating gasket 15 Sliding flange 16 Flame disc regulation screw 17 Monoblock gas valve 000257011...

Страница 9: ...vibration damper joint should be fitted to the gas feed pipe A pressure reduction unit should be installed outside the heating system only in cases where the gas pressure exceeds the level permitted...

Страница 10: ...net filter 4 Pump 5 Degasifier 6 Suction pipe 7 Return pipe 8 Automatic fuel interception device at burner shut off 9 Non return valve Pump axis 1 Tank 3 Wire net filter 4 Pump 6 Suction pipe 7 Return...

Страница 11: ...37 0 85 2 89 3 06 3 23 3 39 3 54 3 68 3 82 1 00 3 40 3 61 3 80 3 99 4 16 4 33 4 50 1 10 3 74 3 97 4 18 4 38 4 58 4 77 4 95 1 20 4 08 4 33 4 56 4 78 5 00 5 20 5 40 1 25 4 25 4 50 4 75 5 00 5 20 5 40 5...

Страница 12: ...instructions are given with regard to regulating the gas delivery in function with the type of valve fitted on the burner 4 Give current to the burner by connecting the main switch and the burner swi...

Страница 13: ...ike natural gas which has a lower specific gravity specific gravity of natural gas in relation to air 0 60 but precipitates and spreads at ground level as if it were a liquid In view of the above prin...

Страница 14: ...E N G L I S H 14 18 0006081159_201102 GENERAL DIAGRAM FOR TWO STAGE L P G PRESSURE REDUCTION FOR BURNER OR BOILER...

Страница 15: ...E N G L I S H 15 18 0006081159_201102 GAS BURNER CONTROL DEVICE GAS LME 22...

Страница 16: ...4 blinks l l l l On Extraneous light when burner startup 5 blinks l l l l l On Time out LP LP is welded in working position 6 blinks l l l l l l On Free 7 blinks l l l l l l l On Too many losses of f...

Страница 17: ...ulating knob 5 Principle valve 2 stage opening 6 Safety valve rapid 7 Pressure tap to control pressure in exit from valve 8 Pressure tap to control pressure in exit from stabilizer Pa 9 Pressure tap t...

Страница 18: ...er connect a water mano meter to the rubber tube holder installed on the tap 8 in correspondence with the exit of the stabilizer 4 The small entry filter 12 can be reached for cleaning by removing one...

Страница 19: ...396 CEE D A G 89 336 CEE 2004 108 CE C E M 73 23 CEE 2006 95 CE D B T 2006 42 CEE D M ve a a daki Avrupa Standartlar na uygundur UNI EN 676 2008 gaz ve kombinasyonu gaz taraf UNI EN 267 2002 dizel ve...

Страница 20: ...nma k lavuzlar n n da daima cihaz n yan nda olmas n sa lay n z B ylece yeni sahibi ve veya monte eden ki i k lavuzdan yararlanabilir Opsiyonel malzemeler veya elektrik malzemesi dahil kitler de dahil...

Страница 21: ...mu ger ekle tirilmelidir Yanl kurulum insana hayvana ve e yaya zarar verebilir ki bu a amada retici bu zarardan sorumlu de ildir Br l r kurulumundan nce sistemin d zg n al mas n aksatacabilecek yak t...

Страница 22: ...58 4 MAX kW 66 8 103 SIVI YAKIT V SKOZ TES MOTOR N 20 C de 1 5 Engler VOLTAJ 50Hz Volt 1 230V FAN MOTORU DEVR 50Hz kW 0 13 kW 2800 devir dakika POMPA MOTORU DEVR 50Hz kW 0 075 kW 2780 devir dakika ATE...

Страница 23: ...i anahtar 9 Elektrik ba lant terminali kutusu 10 Elektrik panosu 11 Resetleme butonu 12 Alev alg lay c 13 Yanma ba l 14 zolasyon contas 15 Kayar flan 16 T rb lat r ayar vidas 17 Monoblok gaz valf 0002...

Страница 24: ...n gaz borusuna ba lanmas yeterlidir Standartlarla m saade edilen 400 mmSS nu a an gaz bas n lar nda al laca takdirde s tma sisteminin bulundu u mahalden d ar ya bir bas n d r c nite yerle tirilmelidi...

Страница 25: ...mal d r 1 Tank 2 Besleme borusu 3 Tel kafesli filtre 4 Pompa 5 Degaz r Gaz alma tank 6 Yak t emme borusu 7 Yak t d n borusu 8 Br l r durdu unda yak t kesici otomatik cihaz 9 Geri d nd rmez valf Pump a...

Страница 26: ...0 2 85 2 99 3 12 3 25 3 37 0 85 2 89 3 06 3 23 3 39 3 54 3 68 3 82 1 00 3 40 3 61 3 80 3 99 4 16 4 33 4 50 1 10 3 74 3 97 4 18 4 38 4 58 4 77 4 95 1 20 4 08 4 33 4 56 4 78 5 00 5 20 5 40 1 25 4 25 4 5...

Страница 27: ...rleri ayarlay n Not Br l re monte edilen gaz valflar n n ayar ile ilgili arka sayfalardaki detayl a klamay okuyun 4 Ana alter ve br l r anahtar na basarak br l re enerji verin Bu durumda br l r fan d...

Страница 28: ...havada da lmaz ve sanki s v imi gibi yere ker Bu nedenle talya daki mevzuata g re LPG kullan m na s n rlamalar getirilmi tir a LPG yakan br l rler ve veya kazanlar topraktan yukar da bulunan ve d ar y...

Страница 29: ...terli kapasitede 2 kademe bas n d r c k 30 mbar Kapasite kullan c ihtiyac n n yakla k iki kat Not Borular ve bas n d r c lerini izolasyon malzemesi ile rtmeyin Filtre Buhar tip Filtre Buhar tip 2 kade...

Страница 30: ...c ak m 3 DC mikroamper al ma esnas nda zay f alev olu tu unda devreden girme devreden kma e i i LED ye il yan p s ner Yakla k 5 DC mikroamper yonizasyon probu ile toprak aras nda k sa devre ak m AC am...

Страница 31: ...T r k e 13 15 0006081159_201102...

Страница 32: ...Maksimum debi i in ayar kafas 4 Ayar ba l n sabitleme vidas 5 al ma valf ki safhada a ar 6 Emniyet valf h zl a ar 7 Bas n tapas valf k ndaki bas n kontrolu i in 8 Bas n tapas stabiliz r k ndaki bas n...

Страница 33: ...rtilen farkl yaylar n farkl bas n de eri i erdi i g zden ka mamal d r Bas n stabilizat r n n ayar i in 8 tapas na ba lanan kau uk boru tutucusuna bir su manometresi ba lay n Manometre stibilizat r k i...

Страница 34: ...34 38 0006081159_201102...

Страница 35: ...35 38 0006081159_201102...

Страница 36: ...URE SWITCH GAZ PRESOSTATI S1 INTERRUTTORE MARCIAARRESTO ON OFF SWITCH A MA KAPAMAANAHTARI S2 PULSANTE SBLOCCO RE SET PUSH BUTTON RESET BUTONU S6 SELETTORE GAS OLIO GAS OIL SELECTOR GAZ YA SE C S SO C...

Страница 37: ......

Страница 38: ...ecification without notice Bu bro rde bildirilen teknik veriler sadece bilgi ama l d r Baltur nceden uyar yapmaks z n r n n teknik zelliklerinde de i iklik yapma hakk n sakl tutar Baltur S p A Via Fer...

Отзывы: