GENERAL DIAGRAM FOR TWO FLAME FUEL OIL
BURNERS  (MAGNET - NOZZLE WITHOUT PIN)

N° BT 8713/1

Access to setting

screws

Pressure regulator

0,5 ÷ 2 bar

Bleed and

by-pass

Gas and

air

bleeder

Bleed

valve

Pumps

Filter and optional

resistance and

thermostat

Pump pressure

regulator

(20 ÷ 22 bar)

Heating coil

Pump inlet

pressure gauge

(0,5 ÷ 2 bar)

Pump

Degasifier and

hot oil recovery

Air regulation

gates

Air gate control

motor

Opening

 magnet

2nd flame solenoid

valve usually open

Access to

setting

screws

1st flame return

pressure regulator

(10 ÷ 12 bar)

Closing

springs

Pump outlet

pressure gauge

(20 ÷ 22 bar)

Pre-heater

By-pass holes

2nd flame pressure

regolator (18 ÷ 20 bar)

TRU thermostat

for ...D version

Return nozzle

without needle

Shaft with closing

cones

Atomizer unit

Pre-heater filter

1 = 

Gauge to detect 1st to 2nd

      flame return pressure

Min.H = 

0,5 m.

Содержание BT 75 DSNM-D

Страница 1: ...en BT180DSNM D BT250DSNM D BT300DSNM D BT350DSNM D 2004 11 Cod 0006080092 BT 75DSNM D BT100DSNM D BT120DSNM D Instruction for burners model Edition...

Страница 2: ...re delegato Dott Riccardo Fava Read carefully the instructions before starting the burner and service it The works on the burner and on the system have to be carried out only by competent people The s...

Страница 3: ...R Transformador voltios TENSIONE TRIFASE 220 380V 220 380V 220 380V 220 380V VOLTAGE Tensi n THREEPHASE trif sica 50 Hz 50 Hz 50 Hz 50 Hz RESISTENZA PRERISCALDATORE kW 10 5 kW 10 5 kW 10 5 kW 15 kW PR...

Страница 4: ...RIFASE 220 380V 220 380V 220 380V VOLTAGE Tensi n THREEPHASE trif sica 50 Hz 50 Hz 50 Hz RESISTENZA PRERISCALDATORE kW 18 kW 25 5 kW 28 5 kW PRE HEATER RESISTANCES resistencia precalentador FLANGIA AT...

Страница 5: ...TCH 8 2nd FLAME ELECTROVALVE usually open 9 1st FLAME PRESSURE REGULATOR VALVE HEATING RESISTANCES 10 PUMP MOTOR 11 PRE HEATER 12 BURNER FIXING FLANGES 13 INSULATING GASKET 14 COMBUSTION HEAD 15 FAN M...

Страница 6: ...0 DSNM D 910 460 450 550 400 150 1445 210 400 230 195 275 M16 240 BT 120 DSNM D 910 460 450 640 480 160 1385 185 450 230 195 275 M16 240 BT 180 DSNM D 1035 545 490 800 600 200 1635 200 535 260 220 340...

Страница 7: ...7 WORKING FIELD N 0002921710 N 0002921701 WORKING FIELD...

Страница 8: ...oth when the burner is not operating and when the burner is in operation at the maximum fuel output level requested by the boiler The feed circuit must be built according to our drawings n BT 8511 6 o...

Страница 9: ...TEAM COIL OR HOT WATER TO HEAT THE OIL 15 HEAVY OIL HEATING COIL STEAM OR HOT WATER 16 HUB DIAMETER 100MM HEIGHT 300MM HEATING ELECTRICAL LEAD IF NECESSARY N B The thank for recovery of hot oil diamet...

Страница 10: ...ten the nuts too much During this operation tightening of the flange locking nuts keep the body of the burner lifted so that the combustion head is kept in a horizontal position Remarks The burner is...

Страница 11: ...against their seats by strong springs located at the opposite end of the rods Oil circulates and flows out of the return end of the atomizing unit passes through the trap where the TRU thermostat is...

Страница 12: ...it is a steam boiler reaches the level set at the 2nd flame thermostat pressure switch in case of steam boilers and operates the thermostat by bringing the 1st flame back into operation The return mo...

Страница 13: ...uge 0 5 2 bar Pump Degasifier and hot oil recovery Air regulation gates Air gate control motor Opening magnet 2nd flame solenoid valve usually open Access to setting screws 1st flame return pressure r...

Страница 14: ...Suction 1 4 Vacuum meter connection Return Pump plate Delivery nozzle 1 4 Pressure gauge connection Heating element seal Pump pressure regulation 20 22 bar Suction Return Delivery nozzle Pump plate 1...

Страница 15: ...alve Opened 1st flame switched on regolator Closed 1st flame switched off regulator Tie down point pressure gauge to get the backpressure which cause the output variation for the 1st and 2nd flame Pum...

Страница 16: ...g pressure to about 1 bar 11 Remove the plug on the vacuum gauge connection point of the pump and then slightly open the gate on the fuel supply pipe Wait until fuel out of the hole without any air bu...

Страница 17: ...closure of the air passage between head and disk This way high pressure at the pre disk position can be obtained even at low flow Consequently high pressure and air turbulence enable better air penetr...

Страница 18: ...tton sblocco unlock Locking can also be caused by temporary inconveniences water in the fuel air in the pipe lines etc if you unlock the burner in these cases the burner starts up without any snags If...

Страница 19: ...in order to keep working pressure sufficiently constant Two flame burners are required for pressurized boilers where combustion chamber pressure is higher than atmospheric pressure in order to give su...

Страница 20: ...he following a gate valve a suitable pressure reducer adjustable from 1 to 8 bar and a control manometer end of the scale 10 bar Do not recuperate the condensate which is discharged from the heater to...

Страница 21: ...EATER WHEN IT S COLD 6 ELECTRIC PRE HEATER 7 SELF CLEANING FILTER 0 3 MM 8 THERMOMETER 9 MIN PRE HEATER THERMOSTAT 10 MAX PRE HEATER THERMOSTAT 11 PRE HEATER ADJUSTER THERMOSTAT 12 THERMOMETER 13 PLUG...

Страница 22: ...1 rev 09 04 87 2 3 4 1 Motor cam shaft coupling cutting out pin The switching off of the motor and shaft connection can be obtained by pushing 1 2nd Flame valve connection cam must be adjusted in a po...

Страница 23: ...23 INSTRUCTIONS LAL CONTROL BOX N 7153 Rev 04 1996...

Страница 24: ...24 INSTRUCTIONS LAL CONTROL BOX N 7153 Rev 04 1996...

Страница 25: ...25 INSTRUCTIONS LAL CONTROL BOX N 7153 Rev 04 1996...

Страница 26: ...26 INSTRUCTIONS LAL CONTROL BOX N 7153 Rev 04 1996...

Страница 27: ...27 INSTRUCTIONS LAL CONTROL BOX N 7153 Rev 04 1996...

Страница 28: ...28 INSTRUCTIONS LAL CONTROL BOX N 7153 Rev 04 1996...

Страница 29: ...29 N 7153 Rev 04 1996 INSTRUCTIONS LAL CONTROL BOX...

Страница 30: ...30 N 7153 Rev 04 1996 INSTRUCTIONS LAL CONTROL BOX...

Страница 31: ...flash in these fields 2 Scale of absolute values for setting the time in side the selected field 3 Status display LED U T Electrical supply tension LED on time passed or stopped LED flashing time del...

Страница 32: ......

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ......

Страница 37: ......

Страница 38: ......

Страница 39: ......

Страница 40: ...7 11 Fax 051 685 75 27 28 International Tel 39 051 684 37 1 1 Fax 39 051 683 06 86 http www baltur it http www baltur com E MAIL info baltur it Technical data in this brochure are given as information...

Отзывы: