background image

20

VARIANTS FOR BURNERS PROVIDED WITH STEAM PRE-HEATER TO HEAT THE FUEL OIL

The burner can be provided with a pre-heater of the fuel oil which operates with steam;  the fuel will be heated by steam
and there will be a consequent saving in electricity.
This device consists of a small tank in which steam circulates and inside the tank is a coil in which the fuel oil to be
heated circulates.
This particular device permits a notable reduction in the dimension of the pre-heater.
When the burner starts up, cold fuel oil would be forced to pass through the coil of the steam pre-heater still cold
because it would not yet have been heated by the steam.   The high viscosity of the fuel (cold), the notable development
(length) of the coil its relatively small diameter (necessary in order to obtain a high thermal exchange), would determine
a strong pressure loss and consequently the fuel would reach the nozzle at insufficient pressure.
To avoid this situation, the steam pre-heater has been provided with a manual-controlled by-pass which prevents,
when open, the fuel passing through the coil (see BT 8576).

Installation
The user should provide and install on the pipeline that takes the steam to the fuel   heater the following:  a gate valve,
a suitable pressure reducer (adjustable from 1 to 8 bar) and a control manometer (end of the scale 10 bar).
Do not recuperate the condensate which is discharged from the heater to avoid, in case there is a leak in the coil, fuel
oil going into the steam system.

Regulation
When the boiler has reached sufficient pressure, open the gate valve which allows the steam inflow to reach the oil pre-
heater, and open slightly the “air discharge” gate valve fitted on the condensate outlet pipeline.
While the steam is discharging from the gate valve slightly opened, regulate the pressure reducer at a sufficient value
in order to heat the fuel oil to a temperature a little above (about 10 ÷ 15 °C) that at which the regulation thermostat of
the electric heater has been set.    An orientative regulation can be carried out by operating the pressure reducer in
function with the value indicated by the manometer;  if necessary, correct the regulation after having controlled the
temperature of the fuel coming out of the steam heater.

Steam Pressure
at manometer  bar

1

1,5

2

2,5

3

3,5

4

4,5

5

6

7

8

Approximate
Corresponding
Temperature  °C

120

127

133

138

143

147

151

155

158

164

169

174

When regulation has been carried out, close the air discharge gate valve.
The thermostats (minimum and regulation) of the electric pre-heater should be regulate normally as described in
Chapter “Start up and Regulation”.

Содержание BT 75 DSNM-D

Страница 1: ...en BT180DSNM D BT250DSNM D BT300DSNM D BT350DSNM D 2004 11 Cod 0006080092 BT 75DSNM D BT100DSNM D BT120DSNM D Instruction for burners model Edition...

Страница 2: ...re delegato Dott Riccardo Fava Read carefully the instructions before starting the burner and service it The works on the burner and on the system have to be carried out only by competent people The s...

Страница 3: ...R Transformador voltios TENSIONE TRIFASE 220 380V 220 380V 220 380V 220 380V VOLTAGE Tensi n THREEPHASE trif sica 50 Hz 50 Hz 50 Hz 50 Hz RESISTENZA PRERISCALDATORE kW 10 5 kW 10 5 kW 10 5 kW 15 kW PR...

Страница 4: ...RIFASE 220 380V 220 380V 220 380V VOLTAGE Tensi n THREEPHASE trif sica 50 Hz 50 Hz 50 Hz RESISTENZA PRERISCALDATORE kW 18 kW 25 5 kW 28 5 kW PRE HEATER RESISTANCES resistencia precalentador FLANGIA AT...

Страница 5: ...TCH 8 2nd FLAME ELECTROVALVE usually open 9 1st FLAME PRESSURE REGULATOR VALVE HEATING RESISTANCES 10 PUMP MOTOR 11 PRE HEATER 12 BURNER FIXING FLANGES 13 INSULATING GASKET 14 COMBUSTION HEAD 15 FAN M...

Страница 6: ...0 DSNM D 910 460 450 550 400 150 1445 210 400 230 195 275 M16 240 BT 120 DSNM D 910 460 450 640 480 160 1385 185 450 230 195 275 M16 240 BT 180 DSNM D 1035 545 490 800 600 200 1635 200 535 260 220 340...

Страница 7: ...7 WORKING FIELD N 0002921710 N 0002921701 WORKING FIELD...

Страница 8: ...oth when the burner is not operating and when the burner is in operation at the maximum fuel output level requested by the boiler The feed circuit must be built according to our drawings n BT 8511 6 o...

Страница 9: ...TEAM COIL OR HOT WATER TO HEAT THE OIL 15 HEAVY OIL HEATING COIL STEAM OR HOT WATER 16 HUB DIAMETER 100MM HEIGHT 300MM HEATING ELECTRICAL LEAD IF NECESSARY N B The thank for recovery of hot oil diamet...

Страница 10: ...ten the nuts too much During this operation tightening of the flange locking nuts keep the body of the burner lifted so that the combustion head is kept in a horizontal position Remarks The burner is...

Страница 11: ...against their seats by strong springs located at the opposite end of the rods Oil circulates and flows out of the return end of the atomizing unit passes through the trap where the TRU thermostat is...

Страница 12: ...it is a steam boiler reaches the level set at the 2nd flame thermostat pressure switch in case of steam boilers and operates the thermostat by bringing the 1st flame back into operation The return mo...

Страница 13: ...uge 0 5 2 bar Pump Degasifier and hot oil recovery Air regulation gates Air gate control motor Opening magnet 2nd flame solenoid valve usually open Access to setting screws 1st flame return pressure r...

Страница 14: ...Suction 1 4 Vacuum meter connection Return Pump plate Delivery nozzle 1 4 Pressure gauge connection Heating element seal Pump pressure regulation 20 22 bar Suction Return Delivery nozzle Pump plate 1...

Страница 15: ...alve Opened 1st flame switched on regolator Closed 1st flame switched off regulator Tie down point pressure gauge to get the backpressure which cause the output variation for the 1st and 2nd flame Pum...

Страница 16: ...g pressure to about 1 bar 11 Remove the plug on the vacuum gauge connection point of the pump and then slightly open the gate on the fuel supply pipe Wait until fuel out of the hole without any air bu...

Страница 17: ...closure of the air passage between head and disk This way high pressure at the pre disk position can be obtained even at low flow Consequently high pressure and air turbulence enable better air penetr...

Страница 18: ...tton sblocco unlock Locking can also be caused by temporary inconveniences water in the fuel air in the pipe lines etc if you unlock the burner in these cases the burner starts up without any snags If...

Страница 19: ...in order to keep working pressure sufficiently constant Two flame burners are required for pressurized boilers where combustion chamber pressure is higher than atmospheric pressure in order to give su...

Страница 20: ...he following a gate valve a suitable pressure reducer adjustable from 1 to 8 bar and a control manometer end of the scale 10 bar Do not recuperate the condensate which is discharged from the heater to...

Страница 21: ...EATER WHEN IT S COLD 6 ELECTRIC PRE HEATER 7 SELF CLEANING FILTER 0 3 MM 8 THERMOMETER 9 MIN PRE HEATER THERMOSTAT 10 MAX PRE HEATER THERMOSTAT 11 PRE HEATER ADJUSTER THERMOSTAT 12 THERMOMETER 13 PLUG...

Страница 22: ...1 rev 09 04 87 2 3 4 1 Motor cam shaft coupling cutting out pin The switching off of the motor and shaft connection can be obtained by pushing 1 2nd Flame valve connection cam must be adjusted in a po...

Страница 23: ...23 INSTRUCTIONS LAL CONTROL BOX N 7153 Rev 04 1996...

Страница 24: ...24 INSTRUCTIONS LAL CONTROL BOX N 7153 Rev 04 1996...

Страница 25: ...25 INSTRUCTIONS LAL CONTROL BOX N 7153 Rev 04 1996...

Страница 26: ...26 INSTRUCTIONS LAL CONTROL BOX N 7153 Rev 04 1996...

Страница 27: ...27 INSTRUCTIONS LAL CONTROL BOX N 7153 Rev 04 1996...

Страница 28: ...28 INSTRUCTIONS LAL CONTROL BOX N 7153 Rev 04 1996...

Страница 29: ...29 N 7153 Rev 04 1996 INSTRUCTIONS LAL CONTROL BOX...

Страница 30: ...30 N 7153 Rev 04 1996 INSTRUCTIONS LAL CONTROL BOX...

Страница 31: ...flash in these fields 2 Scale of absolute values for setting the time in side the selected field 3 Status display LED U T Electrical supply tension LED on time passed or stopped LED flashing time del...

Страница 32: ......

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ......

Страница 37: ......

Страница 38: ......

Страница 39: ......

Страница 40: ...7 11 Fax 051 685 75 27 28 International Tel 39 051 684 37 1 1 Fax 39 051 683 06 86 http www baltur it http www baltur com E MAIL info baltur it Technical data in this brochure are given as information...

Отзывы: