BPM 200 - 300 - 350
1 Gas solenoid valve
2 Maximum pressure adjustment screw (rotate counter-clockwise
to increase and clockwise to decrease)
3 Minimum pressure adjustment screw (counterclockwise to incre-
ase, clockwise to decrease)
4 Gas inlet
5 Gas inlet pressure port
On models BPM 200-300-350 EVO the gas train is not connected to
burner.
• The connection is made by screwing the union (7) (supplied) to the
respective flanges (2) (8).
• Subsequently connect the 4 mm diameter gas compensation pipe
(3) supplied by inserting it into the quick couplings 1 and 4 installed
in the Air Venturi (6) and in the gas valve (5).
• After this operation is completed, test gas train for leakage.
DANGER / ATTENTION
Failed connection of the compensation tube (3) will cause bur-
ner operating anomalies.
Valv_BPM_200_350
3
A
4
5
1
2
0002939480
1
2
3
4
5
6
7
8
ENGLISH
15 / 40
0006160310_202001
Содержание BPM 10
Страница 2: ......
Страница 37: ...ITALIANO 35 40 0006160310_202001...
Страница 38: ...ITALIANO 36 40 0006160310_202001...
Страница 39: ...ITALIANO 37 40 0006160310_202001...
Страница 40: ...SCHEMI ELETTRICI ITALIANO 38 40 0006160310_202001...
Страница 42: ...ITALIANO 40 40 0006160310_202001...
Страница 77: ...ENGLISH 35 40 0006160310_202001...
Страница 78: ...ENGLISH 36 40 0006160310_202001...
Страница 79: ...ENGLISH 37 40 0006160310_202001...
Страница 80: ...WIRING DIAGRAMS ENGLISH 38 40 0006160310_202001...
Страница 82: ...ENGLISH 40 40 0006160310_202001...
Страница 83: ......