13.3.

 

Service functions 

13.3.1

 

Parameters programming function 

Parameters programming function enables to modify main parameters of boiler’s starting up and operating. This 

function works only in the stand-by mode and allows modifying the following parameters: 

“P0” – ignition power 0 ÷ 99 (100 steps); 
“P1” – minimal heating power 0 ÷ 39 (40 steps); 
“P2” – minimal heating power40 ÷ 99 (60 steps); 
“P3” – minimal time from turning off until restarting working 0 ÷ 14 (min). 

Factory settings of the boiler «BaltGaz NEVALUX−7224»

: “P0”=40 for boilers working on NG, “P0”=60 for 

boilers working on LPG, “P1”=0, “P2”=99, “P3”=3 min. 


To use a parameters programming function it is necessary: 

1)

 

Switch the boiler off consequently pushing a button К5 (see scheme. 2, page 7), until a symbol 

 is mapped; 

2)

 

Disconnect boiler from the power line; 

3)

 

Connect boiler again to the power line. Within 5 seconds there is a chance of activating of the programming 
function; 

4)

 

Push  and  simultaneously  press  buttons  of  temperature  reducing  DHW  and  CH  (К2  and  К4)  for  activating 
parameters programming function; 

5)

 

Release the buttons when a code “P0” and symbol 

 will be mapped on the display; 

6)

 

Choose a parameter which you would like to change pressing the buttons К3 or К4; 

7)

 

Push the button К5 in order to display a parameter value. Symbol 

 starts blinking; 

8)

 

To  change  the  value  of  the  chosen  parameter  by  pressing  a  button  К1  (increasing)  or  К2  (value  reducing). 
Keep the button К1 or К2 pressed for increasing speed of changing parameter; 

9)

 

Press button К5 in order to keep a set parameter value and come back to choosing parameters; 

10)

 

To repeat cycle starting from p.6 in order to modify all the parameters which you would like to change; 

11)

 

Press button К6 (RESET) to escape from programming mode. 

Do not change a parameter Р3 without any emergency. 

Component

 

Function

 

For control 

Fuse 21  
(см. Annex 

III

, page 53) 

Protect electronic board and  electric circuits against 
overloading in the electric system and short circuit 
protection 
 

For water 

Pressure sensor 25 (see p.

13.1

, page 24) 

Control minimal water pressure and air absence in the 
heating system 
 

Thermo relay9 

Protect heat exchanger against overheating 

Bypass valve 12 

Protect heat exchanger against overheating while  
increasing resistance in the heating system 
 

Safety valve 17 

Water relief out of the heating system when  pressure is 
higher than 3 bars 

Air duct valve 20 

Automatic air removal out of the heating system 
 

For gas 

Gas supply regulator 8  
(see p.

13.1

, page 24) 

Ignition at low pressure in order to avoid “clap”. 
Blocking gas supply if emergent case happens (heat 
carrier overheating, absence of draught etc.) 
 

Ionization plug 11 

Flame control on the burner. If flame lacks, it stops gas 
supply to the burner 
 

For combustion products 

Air pressure switch 1  
(see p.

13.1

, page 24) 

Control fan’s operation. 
When draught is present or fan is out of control, it stops 
boiler’s working 
 

Содержание NEVALUX 7224

Страница 1: ...er s operation at low high source voltage 10 4 BOILER SERVICE 10 4 1 Examination 10 4 2 Boiler Treatment 10 4 3 Operations effectuated at technical service 11 5 STORAGE PRECAUTIONS 11 6 GENERAL REQUIR...

Страница 2: ...tion of external temperature sensor 21 10 3 4 Connection of a computer for diagnostics 21 10 3 5 Connection of several room thermostats 21 10 4 Swithching the boiler off 21 10 5 Water drain from the b...

Страница 3: ...operation 34 16 2 2 1 Checking of water pressure sensor in the heating system 34 16 2 2 2 Checking of water overheating protection in the heating system 34 16 2 2 3 Checking of bypass valve operation...

Страница 4: ...N BLOCKS 36 17 1 Burner assembly dismantling 36 17 2 Heat exchanger dismantling 37 17 3 Pump dismantling 37 17 4 Bypass valve dismantling 38 17 5 Expansion tank dismantling 38 18 UTILIZATION 38 23 SUP...

Страница 5: ...er preventive servicing failure correction and repair are effectuated only by a specialized service organization The boiler is not unappropriated for use for people including children with low intelle...

Страница 6: ...lothes that constrain breath 4 Give household ammonia to smell 5 To cover warmly but not letting to fall asleep Prehospital service at electricity impact must be provided immediately if possible at th...

Страница 7: ...water flow for switching the boiler on l min 2 5 Minimal water flow for switching the boiler off l min 1 5 Specific water consumption D dm3 min 11 6 Mass consumption of combustion products g s 17 0 1...

Страница 8: ...te pipes mm 80 80 User s Manual 2 3 Overall and connection dimensions A Heating circuit output Cold water inlet G1 2 G3 4 Heating circuit inlet G3 4 reverse DHW output G1 2 E Safety valve connection p...

Страница 9: ...2 Boiler s control panel In the left part of the control panel there is a pressure gauge indicating the pressure inside the heating circuit Water pressure in the heating circuit must be not lower tha...

Страница 10: ...ence of flame on the burner Standby mode Boiler in the DHW standby mode Boiler operating in the DHW mode Boiler in the heating standby mode Boiler operating in the heating mode Error code reset reques...

Страница 11: ...ions User s Manual 3 2 3 Combined mode In the combined mode the boiler operates both for heating and DHW While operating in this mode the symbols and are shown on display If there is no water flow in...

Страница 12: ...ong term and failure free boiler operation and to keep its operational characteristics it is necessary to regularly effect the examination treatment and technical service of the boiler Examination and...

Страница 13: ...ystem and combustion products outlet must be checked for air tightness 9 Water flow in DHW supply system must be enough for switching the DHW mode on 10 Checking of the heating system in order to dete...

Страница 14: ...what would lead to reduction of its working lifespan Water chemical makeup requirements are indicated in section 10 page 19 Presence of rust dirt and other depositions in the heating system leads to...

Страница 15: ...air 8 3 Connecting the boiler to the gas system In accordance with p 7 SP 62 13330 2011 the connection of the gas line to the boiler should be made with metal pipes steel and copper and heatproof mult...

Страница 16: ...ial pipe see p 9 1 page 15 or two separate pipes see p 9 2 page16 to the upper part of the wall hung boiler with further output of them from the premise Herewith the pipes must comply with the followi...

Страница 17: ...d turn the butterfly damper invertedly and fix Using separate pipes it is necessary to additionally take into account the following The total maximum pipe length must not exceed 25 m Each 90 branch pi...

Страница 18: ...separate pipes of smoke exhauster and air duct by means of channel separator 8023 10 000 CAUTION In order to install the channel separator 8023 10 000 onto the boiler you must have the following item...

Страница 19: ...sher4 and then the ring 5 on each screw see Scheme 9 6 Make sure that there are sealing rings 7 2 pcs placed on the inlet and outlet of the channel separator before further installation of the smoke e...

Страница 20: ...so that the pump completely removes the air from the heating system Herewith the pressure may reduce lower than 1 bar and the boiler will show the error 04 not enough water pressure in the heating ci...

Страница 21: ...from the contacts 26 and 27 to the contacts 28 and 29 Then you must effect the connection of interconnecting wires of the room thermostat to the terminal strip the thermostat s wires connection polar...

Страница 22: ...in p 10 3 1 The connecting instruction of the sensor is supplied together with it 10 3 4 Connection of a computer for diagnostics The electronic board provides a possibility of connecting a stationar...

Страница 23: ...3 2 4 page 9 3 Set rated power by turning on a function of gas analysis see p 13 3 2 page 27 4 Keep boiler in the CH mode within 1 minute 5 Check gas pressure in the control point It should be 1 kP 1...

Страница 24: ...screw 2 fastening screws self threading screw of the manifold to the front burner s bracket and with a turnkey 30 to unscrew a nut fixing a manifold to the gas pipe detailed description of removing th...

Страница 25: ...anger 5 burner block burner 6 ignition plug 7 sealed chamber 8 gas supply regulator 9 thermo relay 10 CH temperature sensor 11 Ionization plug 12 Bypass valve 13 Drain valve 14 DHW temperature sensor...

Страница 26: ...3 1 page 24 Mixing gas and air and ensuring uniform combustion of gas air mixture in the combustion chamber Igniter 23 Forming a spark on the ignition plug Ignition plug 6 To create a spark for igniti...

Страница 27: ...arameter by pressing a button 1 increasing or 2 value reducing Keep the button 1 or 2 pressed for increasing speed of changing parameter 9 Press button 5 in order to keep a set parameter value and com...

Страница 28: ...necessary for gas removal in case of previous fail start up 5 igniter 23 by the signal of the electronic board provides high voltage to the ignition plug 6 within 10 seconds sound of discharge is hear...

Страница 29: ...IR ELIMINATION 13 5 14 1 Error codes Stoppage of the boiler s operation caused by the refuse or faulty operation of any of its systems is accompanied by an appropriate error code displayed on the boil...

Страница 30: ...ssure switch tubes Replace tubes Electric circuit of air pressure switch is damaged Check electric circuit and pins Faulty air pressure switch pins of pressure switch should close at pressure drop fro...

Страница 31: ...rk of ignition plug slips on the edge of burner section or the shell of combustion chamber Bend the ignition plug or shell of combustion chamber allowing a spark to slip on the aperture area of the no...

Страница 32: ...stems in such connections where disassemble of water and gas pipes or in the places where water or gas leakage occur 4 Check air tightness of boiler s water and gas systems 5 Lubricate moving connecti...

Страница 33: ...DHW filter It is located in the DHW flow sensor and can be demounted by means of corkscrew or any other instrument 16 2 Boiler s operation check At every boiler s service it is necessary to check 1 Co...

Страница 34: ...witching off connect cable to the ionization plug back and pressing a button 6 RESET boiler will switch on automatically Flame detection is based on the principle of monitoring ionization current Ioni...

Страница 35: ...check whether a bypass pipe heats If bypass pipe is heated constantly it is necessary to clean a boiler s inlet water filter in CH line if filter is mounted and also in other heating areas where cont...

Страница 36: ...tem 3 Put a burner block off see section17 1 page36 4 disconnect cables from the thermo relay 4 see scheme 15 5 By means of the turnkey 30 to unscrew 2 nuts 1 of pipes fastening to the heat exchanger...

Страница 37: ...verse order 17 3 Bypass valve dismantling To dismount a bypass valve it is necessary 1 switch the boiler off see p 10 4 page 21 2 block inlet and output stop valve in the boiler drain the water out of...

Страница 38: ...system drain water out of the boiler if there are not stop valves drain water out of the whole heating system 3 shut a gas block valve 4 disconnect pipe connection from the CH DHW and gas 5 take a boi...

Страница 39: ...ed together with a clamp 0409001010 pos 58 thermo relay HD8 5FC 9 Pos 57 temperature sensor TP01AH1LQ pos 59 and copper spacers 8223 02 003 pos 60 Heat exchanger QF DSGLS L270 Applied together with th...

Страница 40: ...00 25 Output DHW pipe 7324 08 000 26 Inlet DHW pipe7324 09 000 27 pipe 7324 11 000 28 pipe 8223 00 003 5 0 1 5 L 360 mm 29 spacer 8223 01 004 30 spacer 8223 01 007 31 spacer 8023 00 003 G3 4 32 spacer...

Страница 41: ...DSGLS L270 62 Temperature sensor JXW 54 14 14 63 Temperature sensor JXW 54 18 18 Components of hydraulic group pos 6 Pos Designation Note 64 Pressure sensor 21000605300200 0 5 bar 65 DHW flow sensor...

Страница 42: ...0 G1 2 80 spacer 21 28 2 21000607900800 81 bracket 8 21000607000300 82 bracket 14 21000607000200 83 Bithermic manifold 21000607700900 84 Bypass valve HDS 15 300 21000607300500 85 Draining fitting 2100...

Страница 43: ...295 07 20 000 11 nozzles 0 79 mm LPG G30 3 family group 2 9 kP 95 nozzle 3295 07 20 005 19 1 31 mm NG G20 2 family group 1 3 kP nozzle3295 07 20 005 20 0 79 mm LPG G30 3 family group 2 9 kP 96 bar 822...

Страница 44: ...nal expansion membrane tank by connecting it to the return line by pass really close to the boiler In the tables presented below you can find water volume necessary for fulfilling elements of the heat...

Страница 45: ...for the boilers BaltGaz NEVALUX the initial pressure in the expansion tank should be at least 0 1 MP and not more than 0 3 MP Lower pressure can cause the boiler s operating failure To calculate the f...

Страница 46: ...re sensor 15 DHW temperature sensor 16 Ionization plug 17 Remote control option 18 jumper choosing gas type 19 connector of mounting a PC for boiler operating diagnostics 20 ground socket 21 fuse 2 pc...

Страница 47: ...e black Connector Pins Cables colour Cable Parameters Power supply 1 1 brown Power cable 220 V 50 Hz 2 blue Fan 4 12 blue Main cable 220 V 50 Hz 13 brown pump 3 3 blue Pump s cable 220 V 50 Hz 6 brown...

Страница 48: ...ue Gas supply regulator s cable 24 V 10 25 brown Temperature sensor CH 11 30 blue CH temperature sensor cable 10 kOhm at 25 31 blue Temperature sensor DHW 10 36 blue DHW Temperature sensor cable 10 kO...