The pump

 

anti-blocking function permits to exclude blocking of the pump shaft in case of the boiler’s long-

term idleness. This function works only in standby mode. Once in 24 hours the pump is launched for 15 
seconds. 

3.3.3. Boiler’s operation in heating mode with an external (outdoor) temperature sensor 

For an optimal temperature regulation in the heating circuit depending on external temperature it is 
recommended to use an external (street) temperature sensor. The correction of water temperature in the 
heating circuit is effectuated in accordance with the external temperature and regulation coefficient Kd (see 
Scheme 4)/ The electronic boar automatically discerns the presence of an external sensor and effects the 
temperature regulating function. At water temperature setting in the heating circuit the value of the Kd 
coefficient is shown on the boiler’s control panel’s display instead of the temperature value. The regulation 
coefficient may be set in a range between 0 and 9,9. Please see the recommendations on connection of the 
external sensor in p. 10.3.3 , page 21. 

 

T. external 

 

 

 

 

 

 

 

 

 

T. of the heating circuit 

Scheme 4. Schedule of dependency of the temperature in the CH from the external temperature. 
 

User’s manual 

3.3.4. Boiler’s operation at low /high source voltage 

When the source voltage comes outside the range 190 ÷ 250 V the electronic board renders the boiler into the 
standby mode. At this moment the symbol – is shown on the boiler’s display and the boiler does not react on 
pushing the control buttons. 
In 30 seconds after voltage recovery in the range of 190 ÷ 250 V the boiler’s operation is automatically 
restored in the mode  in which the boiler was before, before voltage comes outside the range 190 ÷ 250 V. 
 

4.

 

BOILER SERVICE 

In order to provide long-term and failure-free boiler operation and to keep its operational characteristics it is 
necessary to regularly effect the examination, treatment and technical service of the boiler. 
Examination and treatment must be effectuated by the boiler’s owner. 

Boiler technical service can be effectuated only by a specialized service organization not less than once a 
year. The recommended time for technical service if before the heating season. 

Boiler technical service might be required more often than once a year, in case of intensive work of the boiler 
in a premise where there is much dust in the air or in case of higher water hardness. The unscheduled boiler 
cleaning must also be effectuated also in case if in the premise where the boiler is installed there were 
construction or reparation works and much construction dust and waste got into the boiler. 

CAUTION! Works connected with technical service are not warranty liabilities of the manufacturer 
company and are effectuated by the customer’s cost. 
4.1

 

Examination 

Every time before putting the boiler into operation during the heating season once a day, it is necessary to: 

-

 

Make sure that there are no highly flammable objects next to the boiler or next to the smoke exhauster; 

-

 

Make sure that there is no smell of gas inside the premise, is the smell of gas in the premise was detected you 
must address to the gas facilities service; 

-

 

Make sure that there are no water leaks in the heating and hot water supply systems, in case if leaks are 
detected you must address to a special service organization; 

-

 

Make an external examination of the smoke exhauster in order to detect damages. If smoke exhauster damages 
are detected, you must address to a special service organization. 

4.2

 

Boiler treatment 

-The water filters of the heating and DHW supply systems must be cleaned regularly, especially before the 
beginning of the heating season. The DHW filter must also be cleaned at water flow reduction in the 
DHW supply line; 

Содержание NEVALUX 7224

Страница 1: ...er s operation at low high source voltage 10 4 BOILER SERVICE 10 4 1 Examination 10 4 2 Boiler Treatment 10 4 3 Operations effectuated at technical service 11 5 STORAGE PRECAUTIONS 11 6 GENERAL REQUIR...

Страница 2: ...tion of external temperature sensor 21 10 3 4 Connection of a computer for diagnostics 21 10 3 5 Connection of several room thermostats 21 10 4 Swithching the boiler off 21 10 5 Water drain from the b...

Страница 3: ...operation 34 16 2 2 1 Checking of water pressure sensor in the heating system 34 16 2 2 2 Checking of water overheating protection in the heating system 34 16 2 2 3 Checking of bypass valve operation...

Страница 4: ...N BLOCKS 36 17 1 Burner assembly dismantling 36 17 2 Heat exchanger dismantling 37 17 3 Pump dismantling 37 17 4 Bypass valve dismantling 38 17 5 Expansion tank dismantling 38 18 UTILIZATION 38 23 SUP...

Страница 5: ...er preventive servicing failure correction and repair are effectuated only by a specialized service organization The boiler is not unappropriated for use for people including children with low intelle...

Страница 6: ...lothes that constrain breath 4 Give household ammonia to smell 5 To cover warmly but not letting to fall asleep Prehospital service at electricity impact must be provided immediately if possible at th...

Страница 7: ...water flow for switching the boiler on l min 2 5 Minimal water flow for switching the boiler off l min 1 5 Specific water consumption D dm3 min 11 6 Mass consumption of combustion products g s 17 0 1...

Страница 8: ...te pipes mm 80 80 User s Manual 2 3 Overall and connection dimensions A Heating circuit output Cold water inlet G1 2 G3 4 Heating circuit inlet G3 4 reverse DHW output G1 2 E Safety valve connection p...

Страница 9: ...2 Boiler s control panel In the left part of the control panel there is a pressure gauge indicating the pressure inside the heating circuit Water pressure in the heating circuit must be not lower tha...

Страница 10: ...ence of flame on the burner Standby mode Boiler in the DHW standby mode Boiler operating in the DHW mode Boiler in the heating standby mode Boiler operating in the heating mode Error code reset reques...

Страница 11: ...ions User s Manual 3 2 3 Combined mode In the combined mode the boiler operates both for heating and DHW While operating in this mode the symbols and are shown on display If there is no water flow in...

Страница 12: ...ong term and failure free boiler operation and to keep its operational characteristics it is necessary to regularly effect the examination treatment and technical service of the boiler Examination and...

Страница 13: ...ystem and combustion products outlet must be checked for air tightness 9 Water flow in DHW supply system must be enough for switching the DHW mode on 10 Checking of the heating system in order to dete...

Страница 14: ...what would lead to reduction of its working lifespan Water chemical makeup requirements are indicated in section 10 page 19 Presence of rust dirt and other depositions in the heating system leads to...

Страница 15: ...air 8 3 Connecting the boiler to the gas system In accordance with p 7 SP 62 13330 2011 the connection of the gas line to the boiler should be made with metal pipes steel and copper and heatproof mult...

Страница 16: ...ial pipe see p 9 1 page 15 or two separate pipes see p 9 2 page16 to the upper part of the wall hung boiler with further output of them from the premise Herewith the pipes must comply with the followi...

Страница 17: ...d turn the butterfly damper invertedly and fix Using separate pipes it is necessary to additionally take into account the following The total maximum pipe length must not exceed 25 m Each 90 branch pi...

Страница 18: ...separate pipes of smoke exhauster and air duct by means of channel separator 8023 10 000 CAUTION In order to install the channel separator 8023 10 000 onto the boiler you must have the following item...

Страница 19: ...sher4 and then the ring 5 on each screw see Scheme 9 6 Make sure that there are sealing rings 7 2 pcs placed on the inlet and outlet of the channel separator before further installation of the smoke e...

Страница 20: ...so that the pump completely removes the air from the heating system Herewith the pressure may reduce lower than 1 bar and the boiler will show the error 04 not enough water pressure in the heating ci...

Страница 21: ...from the contacts 26 and 27 to the contacts 28 and 29 Then you must effect the connection of interconnecting wires of the room thermostat to the terminal strip the thermostat s wires connection polar...

Страница 22: ...in p 10 3 1 The connecting instruction of the sensor is supplied together with it 10 3 4 Connection of a computer for diagnostics The electronic board provides a possibility of connecting a stationar...

Страница 23: ...3 2 4 page 9 3 Set rated power by turning on a function of gas analysis see p 13 3 2 page 27 4 Keep boiler in the CH mode within 1 minute 5 Check gas pressure in the control point It should be 1 kP 1...

Страница 24: ...screw 2 fastening screws self threading screw of the manifold to the front burner s bracket and with a turnkey 30 to unscrew a nut fixing a manifold to the gas pipe detailed description of removing th...

Страница 25: ...anger 5 burner block burner 6 ignition plug 7 sealed chamber 8 gas supply regulator 9 thermo relay 10 CH temperature sensor 11 Ionization plug 12 Bypass valve 13 Drain valve 14 DHW temperature sensor...

Страница 26: ...3 1 page 24 Mixing gas and air and ensuring uniform combustion of gas air mixture in the combustion chamber Igniter 23 Forming a spark on the ignition plug Ignition plug 6 To create a spark for igniti...

Страница 27: ...arameter by pressing a button 1 increasing or 2 value reducing Keep the button 1 or 2 pressed for increasing speed of changing parameter 9 Press button 5 in order to keep a set parameter value and com...

Страница 28: ...necessary for gas removal in case of previous fail start up 5 igniter 23 by the signal of the electronic board provides high voltage to the ignition plug 6 within 10 seconds sound of discharge is hear...

Страница 29: ...IR ELIMINATION 13 5 14 1 Error codes Stoppage of the boiler s operation caused by the refuse or faulty operation of any of its systems is accompanied by an appropriate error code displayed on the boil...

Страница 30: ...ssure switch tubes Replace tubes Electric circuit of air pressure switch is damaged Check electric circuit and pins Faulty air pressure switch pins of pressure switch should close at pressure drop fro...

Страница 31: ...rk of ignition plug slips on the edge of burner section or the shell of combustion chamber Bend the ignition plug or shell of combustion chamber allowing a spark to slip on the aperture area of the no...

Страница 32: ...stems in such connections where disassemble of water and gas pipes or in the places where water or gas leakage occur 4 Check air tightness of boiler s water and gas systems 5 Lubricate moving connecti...

Страница 33: ...DHW filter It is located in the DHW flow sensor and can be demounted by means of corkscrew or any other instrument 16 2 Boiler s operation check At every boiler s service it is necessary to check 1 Co...

Страница 34: ...witching off connect cable to the ionization plug back and pressing a button 6 RESET boiler will switch on automatically Flame detection is based on the principle of monitoring ionization current Ioni...

Страница 35: ...check whether a bypass pipe heats If bypass pipe is heated constantly it is necessary to clean a boiler s inlet water filter in CH line if filter is mounted and also in other heating areas where cont...

Страница 36: ...tem 3 Put a burner block off see section17 1 page36 4 disconnect cables from the thermo relay 4 see scheme 15 5 By means of the turnkey 30 to unscrew 2 nuts 1 of pipes fastening to the heat exchanger...

Страница 37: ...verse order 17 3 Bypass valve dismantling To dismount a bypass valve it is necessary 1 switch the boiler off see p 10 4 page 21 2 block inlet and output stop valve in the boiler drain the water out of...

Страница 38: ...system drain water out of the boiler if there are not stop valves drain water out of the whole heating system 3 shut a gas block valve 4 disconnect pipe connection from the CH DHW and gas 5 take a boi...

Страница 39: ...ed together with a clamp 0409001010 pos 58 thermo relay HD8 5FC 9 Pos 57 temperature sensor TP01AH1LQ pos 59 and copper spacers 8223 02 003 pos 60 Heat exchanger QF DSGLS L270 Applied together with th...

Страница 40: ...00 25 Output DHW pipe 7324 08 000 26 Inlet DHW pipe7324 09 000 27 pipe 7324 11 000 28 pipe 8223 00 003 5 0 1 5 L 360 mm 29 spacer 8223 01 004 30 spacer 8223 01 007 31 spacer 8023 00 003 G3 4 32 spacer...

Страница 41: ...DSGLS L270 62 Temperature sensor JXW 54 14 14 63 Temperature sensor JXW 54 18 18 Components of hydraulic group pos 6 Pos Designation Note 64 Pressure sensor 21000605300200 0 5 bar 65 DHW flow sensor...

Страница 42: ...0 G1 2 80 spacer 21 28 2 21000607900800 81 bracket 8 21000607000300 82 bracket 14 21000607000200 83 Bithermic manifold 21000607700900 84 Bypass valve HDS 15 300 21000607300500 85 Draining fitting 2100...

Страница 43: ...295 07 20 000 11 nozzles 0 79 mm LPG G30 3 family group 2 9 kP 95 nozzle 3295 07 20 005 19 1 31 mm NG G20 2 family group 1 3 kP nozzle3295 07 20 005 20 0 79 mm LPG G30 3 family group 2 9 kP 96 bar 822...

Страница 44: ...nal expansion membrane tank by connecting it to the return line by pass really close to the boiler In the tables presented below you can find water volume necessary for fulfilling elements of the heat...

Страница 45: ...for the boilers BaltGaz NEVALUX the initial pressure in the expansion tank should be at least 0 1 MP and not more than 0 3 MP Lower pressure can cause the boiler s operating failure To calculate the f...

Страница 46: ...re sensor 15 DHW temperature sensor 16 Ionization plug 17 Remote control option 18 jumper choosing gas type 19 connector of mounting a PC for boiler operating diagnostics 20 ground socket 21 fuse 2 pc...

Страница 47: ...e black Connector Pins Cables colour Cable Parameters Power supply 1 1 brown Power cable 220 V 50 Hz 2 blue Fan 4 12 blue Main cable 220 V 50 Hz 13 brown pump 3 3 blue Pump s cable 220 V 50 Hz 6 brown...

Страница 48: ...ue Gas supply regulator s cable 24 V 10 25 brown Temperature sensor CH 11 30 blue CH temperature sensor cable 10 kOhm at 25 31 blue Temperature sensor DHW 10 36 blue DHW Temperature sensor cable 10 kO...

Отзывы: