11.3. Regulating minimal pressure  

1)

 

 Disconnect the wire from the terminal  Д, the boiler will pass to minimal power and the error  «07» 
will be shown on display (see p. 14.1, page 34); 

2)

 

 Check gas pressure in the control point  А. It must correspond: 

 

 0,15 kPa (15 mm w.g.)  for natural gas and 0,3 kPa (30 mm w g.) for liquefied 
gas; 

Otherwise it is necessary to set required pressure by turning the regulation screw В, keeping at the 
same time the external screw Г from turning; 

3)

 

 Connect the wire to the terminal Д. 

11.5. End of operation 

1)

 

 Switch the boiler off; 

2)

 

 Disconnect the pressure gauge and screw up the cover plug in the control оpoint А up to the stop; 

3)

 

 Install a plastic cap on regulation screws C and Б; 

4)

 

 Switch the boiler on and render it to the heating mode (see p. 3.2.4, page 10); 

5)

 

 Check for gas leakages in the control points А and Б (see p. 11.2, page 25); 

6)

 

 Render the boiler to standby mode, consequently pressing the button K5; 

7)

 

 Install the front panel and fix it with 6  self-threading screws; 

8)

 

 Close the front panel’s lid. 

12.

 

 RENDERING THE BOILER TO ANOTHER TYPE OF GAS 

The type of gas to which the boiler is set up is indicated on the table on the boiler’s casing and in this 

Manual (see section 20, page 48). 

In order to render the boiler to another type of gas it is necessary to: 
1)

 

 Switch the boiler off (see p. 10.4, page 24); 

2)

 

 Remove  the  boiler’s  casing.  For  this  it  is  necessary  to  screw  off    4  screws  (self-threading)  of  the 
casing’s fixation to the boiler’s bottom panel and 6 screws (self-threading) of the casing’s fixation to 
the front panel; 

3)

 

 Throw open the front panel together with the lid downwards, after this remove the casing, pulling it 
upwards and towards yourself; 

4)

 

 Remove  the  pressure  cap,  screwing  off    4  screws  (self-threading)    and  pulling  the  cap  towards 
yourself with an effort. At reassembly you should pay CAUTION to correct installation of the cap’s  
side walls, which must enter the sockets on the boiler’s rear wall; 

5)

 

 Remove  the  manifold.  For  this  it  is  necessary  to  screw  off  two  screws  (self-threading)  of  the 
manifold’s fixation to the burner’s front bracket and screw off the nut fixing the manifold to the gas 
pipe with a  30-wrench (the detailed description of the manifold’s removal is represented in p. 17.1, 
page 41); 

6)

 

 Replace the nozzles in the burner’s manifold for the nozzle with orifice diameter: 

 

 For liquefied gas - 0,79 mm; 

 

For natural gas - 1,31 mm;  

7)

 

 Remove  the  coating  covering  the  electronic  board,  screwing  off  6  screws  (self-threading)  on  the 
coating and install the plug wire на СМ1 (see Annex III, page 66) into the position: 

 

 "А-В" for natural gas; 

 

 "В-С" for liquefied gas; 

8)

 

 Switch the boiler on and program the ignition power "Р0" (see p. 13.3.1, page 30); 

9)

 

Effectuate the boiler’s power regulation  (see section 11, page 25); 

10)

 

 Effectuate the boiler’s elements’ assembly in the inverted sequence; 

11)

 

 Insert  changes  into  the  boiler’s  label  and  in  the  Certificate  of  Rendering  to  another  type  of 

gas. 

CAUTION! For rendering the boiler to another type of gas it is necessary to use only the branded 

set of details. 

In order to purchase the necessary details please contact the trading organization, effectuating realization 

of the accessories for the boilers «BaltGaz NEVALUX» in your region. 

26

Содержание BaltGaz NEVALUX-8224

Страница 1: ...4931 011 26985921 2012 USER S MANUAL TOGETHER WITH INSTALLATION TECHNICAL SERVICE AND REPAIR INSTRUCTIONS 8224 00 000 01 RE Dear Customer Thank you for purchasing our appliance You have purchased a h...

Страница 2: ...5 free call on the territory of Russian Federation working hours of the service Mon Fri 09 00 17 00 Moscow Boiler installation is allowed only in non living premises with the temperature not less 5o i...

Страница 3: ...rate pipes of smoke exhauster and air circuit 18 9 2 1Installation of separate pipes of smoke exhauster and air circuit by means of transitional set KHG 714061510 18 9 2 2 Installation of separate pip...

Страница 4: ...operation 39 16 2 2 7 Ionization plug check 39 16 2 2 8 Check of combustion products removal control devices 40 16 2 2 9 Check of CH temperature sensor 40 16 2 2 10 Check of DHW temperature sensor 40...

Страница 5: ...and doors in order to ventilate the premise providing maximum fresh air inlet 3 Do not use electric appliances in order to avoid the appearance of spark 4 Do not use the telephone in a gas polluted pr...

Страница 6: ...r T 25 l min 14 0 Temperature regulation range Operating water pressure MPa 0 02 0 60 Minimal water pressure min MPa 0 015 Maximum water pressure max at water heat expansion pressure must not exceed t...

Страница 7: ...d connection dimensions A CH outlet G3 4 B DHWoutlet G1 2 C gas inlet G3 4 D cold water inlet G1 2 E CH inlet G3 4 reverse F safety valve tap 16 18 mm Scheme 1 Overall and connection dimensions of the...

Страница 8: ...e 6 boiler control buttons The designation of the control buttons and of the symbols shown on display are represented in the tables 2 and 3 respectively 3 2 Boiler operation modes The boiler can opera...

Страница 9: ...s flickering and the symbol is glowing If hot water is used the boiler automatically switches to the DHW mode the symbol is glowing and the symbol is flickering 3 2 4 Heating mode In the heating mode...

Страница 10: ...case of the boiler s operation during the heating season once a day it is necessary to Make sure that there are no highly flammable objects next to the boiler or next to the smoke exhausters Make sure...

Страница 11: ...gas appliances installation The boiler is designed for heating water to the temperature lower than the boiling point at atmospheric pressure The boiler should be connected to the heating system and al...

Страница 12: ...01 2003 and Regulations of fire safety of Russian Federation PPB 01 03 in accordance with p 4 2 7 4 2 10 and 4 2 11 SP 41 108 2004 the boiler installation should be provided in the following condition...

Страница 13: ...570 0 87 standard The earth conductor is connected to the earth screw on the boiler s bottom panel marked with the symbol by one end and by the other end to the earth loop of the premise where the boi...

Страница 14: ...sists of details 7 8 9 see Scheme 7 The smoke exhauster connector 7 is installed onto the central orifice on the upper surface of the boiler and is fixed by clip 8 The boiler s construction provides a...

Страница 15: ...previously install the plain washer 4 and then the ring 5 on each screw 6 Make sure that there are seal rings 7 2 pcs placed on the inlet and outlet of the channel separator before further installati...

Страница 16: ...staff manual B B 1 boiler 2 channel separator 3 screw Ph 4 8x60 DIN 7981 4 plain washer 5 3x10 DIN 125 Scheme 10 Channel separator installation scheme 5 ring 005 008 19 2 2 GOST 9833 73 6 seal ring 7...

Страница 17: ...the CH stabilizes at the level of 1 5 bar that will indicate that the air is fully removed The installation of additional air output valves is recommended at the upper points of the heating system for...

Страница 18: ...he cover plug the rests of heat carrier must be removed from the boilers components you must wipe them 10 also check the boiler connection to the AC outlet of the monophase network of alternate curren...

Страница 19: ...rmostat it is necessary to remove the plug wire from the contacts 28 and 29 connector M10 from the room thermostat s connector see Annex III page 66 and place the cables with a terminal strip from the...

Страница 20: ...he TPEB type The sensor is connected to the terminal strip of the room thermostat s connector installed into the connector M10 see Annex III page 66 It is necessary to control that the plug wire is in...

Страница 21: ...it to the heating mode see p 3 2 4 page 10 3 Detect the rated power switching on the gas analysis function see p 13 3 2 page 31 4 Keep the boiler in the heating mode for 1 minute 5 Check gas pressure...

Страница 22: ...eading of the casing s fixation to the front panel 3 Throw open the front panel together with the lid downwards after this remove the casing pulling it upwards and towards yourself 4 Remove the pressu...

Страница 23: ...9 gas supply regulator 10 expansion tank 11 electronic board 12 ignition transformer 113 supply cable 114 pressure sensor 115 thermorelay overheating sensor 116 CH temperature sensor 117 DHWcircuit te...

Страница 24: ...urner block burner 4 Mixing air with gas and providing equable combustion of the gas and air mixture in the combustion chamber Ignition transformer 12 Forming the electric spark on the ignition plug I...

Страница 25: ...meter value on display The symbol on display will start flickering 8 Change the chosen parameter s value pressing the buttons 1 value increase or 2 value reduction In order to increase speed of parame...

Страница 26: ...y to switch off and then switch on the boiler using the button 5 13 4 Boiler s operating logic Launching the boiler in the heating mode occurs if the actual heat carrier temperature in the heating sys...

Страница 27: ...s the 3 way valve 18 to the position for the heating mode As a result the heat carrier from the primary heat exchanger will be directed to the heating system 3 The electronic board supplies voltage to...

Страница 28: ...h 27 its contacts must be opened If the contacts are closed the boiler s launching stops 6 The electronic board provides voltage to the fan s electric motor 28 The fans starts operating it can be hear...

Страница 29: ...3 0 5 mm The ignition transformer is out of order Replace the ignition transformer Electric circuit of the ignition transformer is damaged Check the electric circuit and contacts The burner block is c...

Страница 30: ...ier pressure in the CH to the recommended value see p 10 1 page 22 Air lock in the heating system Open the air outlet valve see p 16 2 2 5 page 39 The heat carrier pressure sensor of the CH is out of...

Страница 31: ...eakage Little hot water output or its absence Insufficient inlet DHW water pressure Address to the Housing and Public utilities service Water filter is contaminated Clean the filer on the DHW line Sec...

Страница 32: ...ssary to perform only when the boiler is completely switched off taps on boiler s heat carrier water and gas lines inlets should be closed boiler should be disconnected from the power line 16 1 Techni...

Страница 33: ...stems on air tightness CAUTION Checking of gas joints air tightness is performed by soap solution bubble test or any other safe methods without using open flame sources Appearance of bubbles means gas...

Страница 34: ...ount the smoke exhaust flue pipe back 16 2 2 9 Checking of CH temperature sensor Before switching the boiler on disconnect the cables from the CH heat carrier temperature sensor 16 see p 13 1 page 27...

Страница 35: ...1 see Scheme 16 of casing fastening to the boiler s bottom panel 3 Remove the cap of front panel 4 Unscrew two self threading screws 3 see Scheme 16 and four self threading screws 2 see scheme 16 of...

Страница 36: ...g system 3 Put the burner block off see p 17 1 page 41 4 disconnect cables from the thermo relay 9 see p 13 1 page 27 5 By means of the turnkey 30 unscrew 2 nuts 1 of pipes fastening to the heat excha...

Страница 37: ...carrier out of the boiler see section 10 5 page24 if there are no stop valves drain the heat carrier out of the whole heating system 3 put the casing and sealing cap off from the boiler see p 17 1 pa...

Страница 38: ...le the secondary heat exchanger it is necessary to 1 Switch the boiler on see p 10 4 page 24 2 Close the stop valves at the boiler s inlet and outlet drain the heat carrier out of the boiler see p 10...

Страница 39: ...e body frame 6 Wash and lubricate all details 7 Replace the details that are out of order Assembly is performed in the reverse order 17 6Bypass valve dismantling In order to dismount the bypass valve...

Страница 40: ...ards 18 UTILIZATION Upon completion of using the boiler it is necessary to dismantle it by the following operations 1 Switch the boiler off see p 10 4 page 24 2 Close the heat carrier and water stop v...

Страница 41: ...Gaz NEVALUX 8224 Table 6 1 Wall hung gas boiler NEVALUX 8224 1 pcs 2 User s manual 8224 00 000 01RE 1 ex 3 Boiler s fastening carrier 8223 20 011 1 pcs 4 Dowel SORMAT NAT 10 2 pcs 5 Screw 6 3 50 mm 2...

Страница 42: ...NEVALUX 8624 48...

Страница 43: ...0 01 4 Carrier 8023 01 002 8223 08 000 6 Hydraulic group 10037608005030 7 Burner block 8223 22 000 13 sections nozzles 0 1 31 mm natural gas G20 2nd family group 1 3 kPa 8223 22 000 01 13 sections noz...

Страница 44: ...e sensor JXW 54 14 0 14 mm 29 Nut 8023 01 004 G3 8 30 Gas supply regulator 845 SIGMA 31 Decorative insertion 8023 02 002 32 Pipe 8223 04 000 8224 11 000 33 CHoutlet pipe 8224 05 000 8224 08 000 34 CH...

Страница 45: ...86 2 62 21000606701200 65 Fixture 18 21000607000600 66 Bracket 8 21000607000300 67 Ignition and ionization plugs in assembly 8223 22 060 Hydraulic group components pos 6 Pos Name Designation Note 68...

Страница 46: ...et 21000607000100 79 Bypass pipe 21000606608700 014 mm 80 DHW inlet pipe 21000606606800 014 mm 81 DHW outlet pipe 21000606606700 014 mm 82 Pump pipe 21000606602300 018 mm 84 Pump s fitting 21000605800...

Страница 47: ...g hub 400 325 21000606200300 102 3 way valve stem 21000607400100 103 retainer washer 400 14 21000605900200 104 Ring OR 2 84x2 62 00046240230310 105 Hub 400 25 21000606300100 106 Electric motor s faste...

Страница 48: ...0 Nozzles 0 1 31 mm natural gas G20 2nd family group 1 3 3264 02 130 11 Nozzles 0 0 79 mm Liquefied gas G30 3rd family group 2 9 kPa 3295 07 20 000 11 Nozzles 0 0 79 mm Liquefied gas G30 3rd family gr...

Страница 49: ...e gas supply regulator modulator coil DHW flow sensor pressure sensor Heating temperature sensor cable CBAB0W016 Connecting the heating temperature sensor DHW temperature sensor cable CBAB0W011 Connec...

Страница 50: ...easuring this height in meters we calculate static pressure taking 0 001 MPa of overpressure for each height meter Initial pressure in the expansion tank should be approximately 10 more than calculate...

Страница 51: ...ue Simultaneously you should consider that for the boilers BaltGaz NEVALUX the initial pressure in the expansion tank should be at least 0 1 MP and not more than 0 3 MP Lower pressure can cause the bo...

Страница 52: ...3 l i 13 6 7 l Consequently it is necessary to install additionally a vessel with a volume 7 l On the monograph you should choose the next bigger standard expansion tank with a volume 8 l Selecting an...

Страница 53: ...ensor option 13 room thermostat option 14 CH temperature sensor 15 DHW temperature sensor 16 ionization plug 17 remote control option 18 jumper selecting the type of gas 19 Computer connection connect...

Страница 54: ...90 water overheating sensor 6 17 blue Air pressure switch cable 24 V 10 m 18 brown Air pressure switch 6 15 red Air pressure switch cable 24 V 10 m 16 red Pressure sensor 9 22 black Gas supply regula...

Страница 55: ......

Страница 56: ......

Отзывы: