BaltGaz BaltGaz NEVALUX-8224 Скачать руководство пользователя страница 11

Technical staff manual 

 

 

5)

 

 Checking the boiler’s gas, heating and hot water supply systems’ air tightness; 

6)

 

Lubrication of moving connections (if necessary), it is recommended to use thick lubricant greases on 

silicone base;  
7)

 

Checking of safety devices, they must work without failures; 

8)

 

Checking of air pressure in the expansion tank (once in 3 years), the pressure must be 1,0 bar; 

9)

 

The air inlet system and combustion products outlet must be checked for air tightness; 

10)

 

Water flow in DHW supply system must be enough for switching the DHW mode on; 

11)

 

Checking of the heating system in order to detect contamination. 

CAUTION! Technical service operations connected with disassembling of its gas or hydraulic pipelines 
must be effectuated only after switching off the boiler completely (the taps on heat carrier , water and gas 
pipelines by the inlet into the boiler must be closed, the boiler must be disconnected from the power line). 

5.

 

STORAGE PRECAUTIONS 

-The boiler is made in climatic category UHL4.2 under GOST 15150-69 standard. 
-The boiler must be stored and transported in the package only in the position indicated on the handling 
symbols. 

- The boiler must be stored in a closed premise that guarantees protection from atmospheric and other harmful 
impacts at air temperature from −50 ºС to +40 ºС  and relative humidity not more than 98%. 
-In case of boiler storage for more than 12 month a conservation according to the GOST  
9.014−78 standard must be effectuated. 
-Inlet and output hoses orifices must be closed by cover plugs. 

6.

 

GENERAL REQUIREMENTS 

Installation, technical service and  initial run of gas appliances for domestic use must be effectuated in accordance 
with local requirements, more specifically: 



SNiP II−35−76 «Boiler-plants»;  



SP 62.13330.2011 «Gas-distribution systems. Updated edition SNiP 42−01−2002»;  



SP 41−108−2004“Door-to-door heating of domestic buildings with gas-fueled heat generators”; 



SNiP 41-01-2003”Heating, ventilation and conditioning”;  



”Regulation of fire safety in Russian Federation” (PPB 01−03);  



PUE “Electrical Installation Regulations”. 

Also it is necessary to pay CAUTION to the following moments: 
-The boiler may be used with any type of heat exchangers (convectional stoves, radiators and convectors), and 
their power system may be both double-pipe and single-pipe; 
-Children must be kept away from contact with package elements (plastic bags, polystyrene etc.), as they 
represent a potential source of danger. 

The boiler’s initial run and warranty liabilities must be fulfilled by a special service organization. 

 

7.

 

OPERATIONS BEFORE INSTALLATION 

CAUTION! Boiler installation, putting the boiler into operation and technical service can be 
effectuated only by a specialized service organization. Boiler installation must be effectuated 
according to the project which complies with the requirements of Federal and local normative acts, 
regulating gas appliances installation. 

The boiler is designed for heating water to the temperature lower than the boiling point at atmospheric 
pressure. 
The boiler should be connected to the heating system, and also to the water supply network in order to 
receive domestic hot water for housekeeping needs (hereinafter referred to as DHW), and after that to the 
gas pipeline. Heating and water supply systems must be compatible with the boiler’s exploitation 
characteristics and power. 
The boiler’s technical characteristics are represented in p.2.2 (page 5). 
Before putting the boiler into operation it is necessary to effectuate the following: 
-To check the compliance of the type of gas and pressure indicated in the sections 20 and 21 (page 48) and 
in the table o the boiler with the used type of gas and gas pressure in the place of the boiler’s installation. 
In case of non-compliance it is necessary to render the boiler to the used type of gas and pressure in 
accordance with section 12 (page 26); 
-To make sure that the installation was correct and the smoke exhauster is airtight; 
-In order to provide correct boiler operation ant to keep the warranty it is necessary to follow the 
requirements of this manual. 
 

7.1 DHW Line 

For normal boiler operation it is necessary to install a water filter by the inlet into the boiler on the DHW 
line. 
If water hardness exceeds 200 mg of calcium carbonate per 1 liter water, it is necessary to install a 
polyphosphates dose meter or another water softening device. 

7.2. Heating system 

The boiler is connected to the heating system and DHW system, in accordance with its characteristics and 
heating power. 

Minimal heat output of the heating system must be more than 8,9 kW. Otherwise, the boiler will 
operate unstably, what would lead to reduction of its service life. 
It is recommended to use water as a heat carrier in the heating system. It is acceptable to use 
Propylenglycolum as a heat carrier. 

Presence of rust, dirt and other deposits in the heating system leads to the boiler’s operation disturbance 
and performance degradation (for example overheating, noise in the heat exchanger, heating effect 
reduction). In connection to this, the heating system must be washed before the boiler’s installation. For 
this acid and alkaline-based detergents or detergents, corroding metal, plastic and rubber parts of the 
boiler, cannot be used.  
It is recommended to use SENTINEL X400 и SENTINEL X100. The purchased heating system cleaning 
detergent must be used in accordance with the instruction attached to it.  

7.2.1 Water quality requirements 

The quality water used in the heating system must comply with the following parameters: 

-

 

РН value 

6-8 

-

 

General hardness 

not more than 4 mg-eq/l 

Iron content 

not more than 0,3 mg/l 

If the incoming water’s hardness exceeds 4 mg-eq/l, it is necessary to install by the water’s inlet into the 

boiler  a  polyphosphates  dose  meter,  which  processes  the  water  coming  into  the  boiler,  protecting  the  heat 
exchanging equipment of the boiler from hardness deposition. The polyphosphates dose meter is not included 

Содержание BaltGaz NEVALUX-8224

Страница 1: ...4931 011 26985921 2012 USER S MANUAL TOGETHER WITH INSTALLATION TECHNICAL SERVICE AND REPAIR INSTRUCTIONS 8224 00 000 01 RE Dear Customer Thank you for purchasing our appliance You have purchased a h...

Страница 2: ...5 free call on the territory of Russian Federation working hours of the service Mon Fri 09 00 17 00 Moscow Boiler installation is allowed only in non living premises with the temperature not less 5o i...

Страница 3: ...rate pipes of smoke exhauster and air circuit 18 9 2 1Installation of separate pipes of smoke exhauster and air circuit by means of transitional set KHG 714061510 18 9 2 2 Installation of separate pip...

Страница 4: ...operation 39 16 2 2 7 Ionization plug check 39 16 2 2 8 Check of combustion products removal control devices 40 16 2 2 9 Check of CH temperature sensor 40 16 2 2 10 Check of DHW temperature sensor 40...

Страница 5: ...and doors in order to ventilate the premise providing maximum fresh air inlet 3 Do not use electric appliances in order to avoid the appearance of spark 4 Do not use the telephone in a gas polluted pr...

Страница 6: ...r T 25 l min 14 0 Temperature regulation range Operating water pressure MPa 0 02 0 60 Minimal water pressure min MPa 0 015 Maximum water pressure max at water heat expansion pressure must not exceed t...

Страница 7: ...d connection dimensions A CH outlet G3 4 B DHWoutlet G1 2 C gas inlet G3 4 D cold water inlet G1 2 E CH inlet G3 4 reverse F safety valve tap 16 18 mm Scheme 1 Overall and connection dimensions of the...

Страница 8: ...e 6 boiler control buttons The designation of the control buttons and of the symbols shown on display are represented in the tables 2 and 3 respectively 3 2 Boiler operation modes The boiler can opera...

Страница 9: ...s flickering and the symbol is glowing If hot water is used the boiler automatically switches to the DHW mode the symbol is glowing and the symbol is flickering 3 2 4 Heating mode In the heating mode...

Страница 10: ...case of the boiler s operation during the heating season once a day it is necessary to Make sure that there are no highly flammable objects next to the boiler or next to the smoke exhausters Make sure...

Страница 11: ...gas appliances installation The boiler is designed for heating water to the temperature lower than the boiling point at atmospheric pressure The boiler should be connected to the heating system and al...

Страница 12: ...01 2003 and Regulations of fire safety of Russian Federation PPB 01 03 in accordance with p 4 2 7 4 2 10 and 4 2 11 SP 41 108 2004 the boiler installation should be provided in the following condition...

Страница 13: ...570 0 87 standard The earth conductor is connected to the earth screw on the boiler s bottom panel marked with the symbol by one end and by the other end to the earth loop of the premise where the boi...

Страница 14: ...sists of details 7 8 9 see Scheme 7 The smoke exhauster connector 7 is installed onto the central orifice on the upper surface of the boiler and is fixed by clip 8 The boiler s construction provides a...

Страница 15: ...previously install the plain washer 4 and then the ring 5 on each screw 6 Make sure that there are seal rings 7 2 pcs placed on the inlet and outlet of the channel separator before further installati...

Страница 16: ...staff manual B B 1 boiler 2 channel separator 3 screw Ph 4 8x60 DIN 7981 4 plain washer 5 3x10 DIN 125 Scheme 10 Channel separator installation scheme 5 ring 005 008 19 2 2 GOST 9833 73 6 seal ring 7...

Страница 17: ...the CH stabilizes at the level of 1 5 bar that will indicate that the air is fully removed The installation of additional air output valves is recommended at the upper points of the heating system for...

Страница 18: ...he cover plug the rests of heat carrier must be removed from the boilers components you must wipe them 10 also check the boiler connection to the AC outlet of the monophase network of alternate curren...

Страница 19: ...rmostat it is necessary to remove the plug wire from the contacts 28 and 29 connector M10 from the room thermostat s connector see Annex III page 66 and place the cables with a terminal strip from the...

Страница 20: ...he TPEB type The sensor is connected to the terminal strip of the room thermostat s connector installed into the connector M10 see Annex III page 66 It is necessary to control that the plug wire is in...

Страница 21: ...it to the heating mode see p 3 2 4 page 10 3 Detect the rated power switching on the gas analysis function see p 13 3 2 page 31 4 Keep the boiler in the heating mode for 1 minute 5 Check gas pressure...

Страница 22: ...eading of the casing s fixation to the front panel 3 Throw open the front panel together with the lid downwards after this remove the casing pulling it upwards and towards yourself 4 Remove the pressu...

Страница 23: ...9 gas supply regulator 10 expansion tank 11 electronic board 12 ignition transformer 113 supply cable 114 pressure sensor 115 thermorelay overheating sensor 116 CH temperature sensor 117 DHWcircuit te...

Страница 24: ...urner block burner 4 Mixing air with gas and providing equable combustion of the gas and air mixture in the combustion chamber Ignition transformer 12 Forming the electric spark on the ignition plug I...

Страница 25: ...meter value on display The symbol on display will start flickering 8 Change the chosen parameter s value pressing the buttons 1 value increase or 2 value reduction In order to increase speed of parame...

Страница 26: ...y to switch off and then switch on the boiler using the button 5 13 4 Boiler s operating logic Launching the boiler in the heating mode occurs if the actual heat carrier temperature in the heating sys...

Страница 27: ...s the 3 way valve 18 to the position for the heating mode As a result the heat carrier from the primary heat exchanger will be directed to the heating system 3 The electronic board supplies voltage to...

Страница 28: ...h 27 its contacts must be opened If the contacts are closed the boiler s launching stops 6 The electronic board provides voltage to the fan s electric motor 28 The fans starts operating it can be hear...

Страница 29: ...3 0 5 mm The ignition transformer is out of order Replace the ignition transformer Electric circuit of the ignition transformer is damaged Check the electric circuit and contacts The burner block is c...

Страница 30: ...ier pressure in the CH to the recommended value see p 10 1 page 22 Air lock in the heating system Open the air outlet valve see p 16 2 2 5 page 39 The heat carrier pressure sensor of the CH is out of...

Страница 31: ...eakage Little hot water output or its absence Insufficient inlet DHW water pressure Address to the Housing and Public utilities service Water filter is contaminated Clean the filer on the DHW line Sec...

Страница 32: ...ssary to perform only when the boiler is completely switched off taps on boiler s heat carrier water and gas lines inlets should be closed boiler should be disconnected from the power line 16 1 Techni...

Страница 33: ...stems on air tightness CAUTION Checking of gas joints air tightness is performed by soap solution bubble test or any other safe methods without using open flame sources Appearance of bubbles means gas...

Страница 34: ...ount the smoke exhaust flue pipe back 16 2 2 9 Checking of CH temperature sensor Before switching the boiler on disconnect the cables from the CH heat carrier temperature sensor 16 see p 13 1 page 27...

Страница 35: ...1 see Scheme 16 of casing fastening to the boiler s bottom panel 3 Remove the cap of front panel 4 Unscrew two self threading screws 3 see Scheme 16 and four self threading screws 2 see scheme 16 of...

Страница 36: ...g system 3 Put the burner block off see p 17 1 page 41 4 disconnect cables from the thermo relay 9 see p 13 1 page 27 5 By means of the turnkey 30 unscrew 2 nuts 1 of pipes fastening to the heat excha...

Страница 37: ...carrier out of the boiler see section 10 5 page24 if there are no stop valves drain the heat carrier out of the whole heating system 3 put the casing and sealing cap off from the boiler see p 17 1 pa...

Страница 38: ...le the secondary heat exchanger it is necessary to 1 Switch the boiler on see p 10 4 page 24 2 Close the stop valves at the boiler s inlet and outlet drain the heat carrier out of the boiler see p 10...

Страница 39: ...e body frame 6 Wash and lubricate all details 7 Replace the details that are out of order Assembly is performed in the reverse order 17 6Bypass valve dismantling In order to dismount the bypass valve...

Страница 40: ...ards 18 UTILIZATION Upon completion of using the boiler it is necessary to dismantle it by the following operations 1 Switch the boiler off see p 10 4 page 24 2 Close the heat carrier and water stop v...

Страница 41: ...Gaz NEVALUX 8224 Table 6 1 Wall hung gas boiler NEVALUX 8224 1 pcs 2 User s manual 8224 00 000 01RE 1 ex 3 Boiler s fastening carrier 8223 20 011 1 pcs 4 Dowel SORMAT NAT 10 2 pcs 5 Screw 6 3 50 mm 2...

Страница 42: ...NEVALUX 8624 48...

Страница 43: ...0 01 4 Carrier 8023 01 002 8223 08 000 6 Hydraulic group 10037608005030 7 Burner block 8223 22 000 13 sections nozzles 0 1 31 mm natural gas G20 2nd family group 1 3 kPa 8223 22 000 01 13 sections noz...

Страница 44: ...e sensor JXW 54 14 0 14 mm 29 Nut 8023 01 004 G3 8 30 Gas supply regulator 845 SIGMA 31 Decorative insertion 8023 02 002 32 Pipe 8223 04 000 8224 11 000 33 CHoutlet pipe 8224 05 000 8224 08 000 34 CH...

Страница 45: ...86 2 62 21000606701200 65 Fixture 18 21000607000600 66 Bracket 8 21000607000300 67 Ignition and ionization plugs in assembly 8223 22 060 Hydraulic group components pos 6 Pos Name Designation Note 68...

Страница 46: ...et 21000607000100 79 Bypass pipe 21000606608700 014 mm 80 DHW inlet pipe 21000606606800 014 mm 81 DHW outlet pipe 21000606606700 014 mm 82 Pump pipe 21000606602300 018 mm 84 Pump s fitting 21000605800...

Страница 47: ...g hub 400 325 21000606200300 102 3 way valve stem 21000607400100 103 retainer washer 400 14 21000605900200 104 Ring OR 2 84x2 62 00046240230310 105 Hub 400 25 21000606300100 106 Electric motor s faste...

Страница 48: ...0 Nozzles 0 1 31 mm natural gas G20 2nd family group 1 3 3264 02 130 11 Nozzles 0 0 79 mm Liquefied gas G30 3rd family group 2 9 kPa 3295 07 20 000 11 Nozzles 0 0 79 mm Liquefied gas G30 3rd family gr...

Страница 49: ...e gas supply regulator modulator coil DHW flow sensor pressure sensor Heating temperature sensor cable CBAB0W016 Connecting the heating temperature sensor DHW temperature sensor cable CBAB0W011 Connec...

Страница 50: ...easuring this height in meters we calculate static pressure taking 0 001 MPa of overpressure for each height meter Initial pressure in the expansion tank should be approximately 10 more than calculate...

Страница 51: ...ue Simultaneously you should consider that for the boilers BaltGaz NEVALUX the initial pressure in the expansion tank should be at least 0 1 MP and not more than 0 3 MP Lower pressure can cause the bo...

Страница 52: ...3 l i 13 6 7 l Consequently it is necessary to install additionally a vessel with a volume 7 l On the monograph you should choose the next bigger standard expansion tank with a volume 8 l Selecting an...

Страница 53: ...ensor option 13 room thermostat option 14 CH temperature sensor 15 DHW temperature sensor 16 ionization plug 17 remote control option 18 jumper selecting the type of gas 19 Computer connection connect...

Страница 54: ...90 water overheating sensor 6 17 blue Air pressure switch cable 24 V 10 m 18 brown Air pressure switch 6 15 red Air pressure switch cable 24 V 10 m 16 red Pressure sensor 9 22 black Gas supply regula...

Страница 55: ......

Страница 56: ......

Отзывы: