(metallopolymeric pipes). It is acceptable to use multi-layered metallopolymeric pipes for inner gas pipelines 
at natural gas provision to one-flat domestic buildings not higher than 3 floors in condition if they are 
confirmed as acceptable for construction use. It is acceptable to connect the boiler to the gas pipeline by a 
flexible tubing (hose), resistant to transported gas at set pressure and temperature. The inner diameter of pipes 
and hoses must be not less than 20 mm. 

In accordance with p. 5.5 SP 41−108−2004 the flexible connections shall be not longer than 1,5 m. The 
hoses must be installed in accordance with the instructions of their manufacturer. 
- Remove cover plugs from connection pipes; 
-Install the gas filter and stop valve on the gas pipeline by the inlet into the boiler; 
-The gas valve must me easily accessible; 
-Connect the boiler to the gas pipeline. Check that there are no gas leakages. Airtightness control is 
effectuated by means of a soap solution bubble test on the joints or by other safe methods. Appearance of 
bubbles means that there is a gas leakage. The gas leakage is unacceptable. 

8.4. Connecting the boiler to the liquefied gas cylinder  

-Before connecting the boiler to the liquefied gas cylinder make sure that your boiler is set up for 
operation with this type of gas. Otherwise it is necessary to effectuate the boiler’s rendering to liquefied 
gas in accordance with section 12 (page 26). 
-The balloon with liquefied gas must necessarily be equipped with a reduction unit with vapor phase 
stabilization pressure of 2,9kPa and vapor phase capacity not less than 1 m

3

/hour. 

CAUTION! Using reduction units with stabilization pressure different from 2,9 kPa IS 
PROHIBITED. 

 

-The hose length for connecting the boiler must be not more than 1,5 m., the inner diameter- not less than 
20 mm. The gas supply hose must be resistant to the supplied gas at set pressure and temperature. The 
hoses should be installed in accordance with the instructions of their manufacturer. 
-In front of the boiler’s inlet a stop gas valve must be installed, which must be easily accessible. 

-After finishing the installation it is necessary to check the joints and the whole length of the connection hose 
in order to detect a gas leakage (see p. 8.3) 

In order to avoid accidents it is PROHIBITED: 

1)To keep gas balloons and lay hoses under direct sunlight, next to heat sources (heating stove, oven, 
heating radiators, other heating appliances);  
2) To heat the balloons by means of flame or heating appliances; 
3) To use damaged gas balloons. 
It is recommended to keep gas balloons in a special metal cabinet in order to limit access of children and 
unauthorized persons to them. Placing gas-cylinder installations inside the building is unacceptable. 

8.5 Connecting the boiler to the power line 

 

The boiler corresponds to the I class electric shock hazard protection. It is necessary to make sure that there is an 
AC outlet of alternate current monophase network with rated voltage 220 V. 50 Hz frequency and with an earth 
contact.  
In order to provide safety when power supply is beyond the range of 190-250 V the electronic board renders the 
boiler to standby mode (see p. 3.3.4, page 11). 
The boilers earth must be effectuated following all earth requirements in accordance with GOST 27570.0−87 
standard. The earth conductor is connected to the earth screw on the boiler’s bottom panel (marked with the 
symbol  Θ  )by one end, and by the other end to the earth loop of the premise where  the boiler is installed. It is 
prohibited to use heat carrier, water and gas pipelines and also the heating radiators for earth. The scheme of the 
boiler’s electric connections is represented in Annex III (page 66). 

Note. 

It is recommended to effect the boiler’s connection  to the power line through a Constant voltage regulator  

in order to provide stable and failure-free operation and also to prevent the boiler’s breakdown because of power 
line surges. 

CAUTION! In case of power cable damage, in order to avoid danger, its replacement must be effectuated 
by a specialized service organization. 
CAUTION! The manufacturer bears no responsibilities for failures caused by non-compliance with the 
above-listed requirements. All activities, not complying with the activities listed in this Manual, may not 
only cause the boiler’s breakdown, but also create a life hazard. 
 
9.

 

SMOKE EXHAUSTER INSTALLATION 

It is strictly prohibited to put the boiler into operation in case if  the smoke exhausting pipe is not 
installed, in order to avoid combustion products poisoning. 

The boiler has an air inlet duct for combustion and a combustion products outlet duct, what permits not to use the 
air from the premise. Using different component parts, you may connect a coaxial pipe (see p. 9.1 page 17) or two 
separate pipes (see p. 9.2 page 18) to the upper part of the wall-hung boiler with further output of them from the 
premise. 
The pipes for combustion products removal must comply with the following requirements: 
-The pipe must be made from non-flammable material, resistant to mechanical deformations, not subject to 
corrosion, and fully airtight. It also must be protected from overheating, from inflammation and freezing; 
- The joints of the smoke exhauster pipe must be made of thermo-resistant material not subject to corrosion; 
-The smoke exhauster pipe must be installed in a place available for service so that, in case of the pipe’s damage, 
there would be no hindrance for smoke leakage elimination. 
After installing the smoke exhauster, it if necessary to effectuate the following. 
-To make sure that there are no narrowings in the smoke exhauster, and also that outlet pipeworks of other boilers 
are not connected to it. It is acceptable only in case if the smoke exhauster is designed for several users and is 
produced in accordance with local requirements; 
-If the boiler must be connected to an existing smoke exhauster, it is necessary to make sure that the latter is clean, 
as slag separation from the smoke exhauster’s walls while the boiler is in operation might encumber the free outlet 
of exhausted gases. 
In order to purchase the necessary parts and details of the smoke exhauster you should contact the trading 
organization, effectuating realization of accessories for the boilers “BaltGaz NEVALUX” in your region. 

CAUTION! It is prohibited to use ventilation channels for combustion products removal. 

9.1.Installation of coaxial smoke exhauster 

Connecting the coaxial pipe to the boiler is effectuated by means of a connection set KHG 714101410 (not 
included into the supply package), which includes a coaxial branch pipe 90 °, a joint sleeve for connecting to the 
boiler’s outlet and gasket (see scheme 6). If necessary the connection set KHG 714101610 can be used  (not 
included into the supply package), with a branch pipe 45 °. 

Содержание BaltGaz NEVALUX-8224

Страница 1: ...4931 011 26985921 2012 USER S MANUAL TOGETHER WITH INSTALLATION TECHNICAL SERVICE AND REPAIR INSTRUCTIONS 8224 00 000 01 RE Dear Customer Thank you for purchasing our appliance You have purchased a h...

Страница 2: ...5 free call on the territory of Russian Federation working hours of the service Mon Fri 09 00 17 00 Moscow Boiler installation is allowed only in non living premises with the temperature not less 5o i...

Страница 3: ...rate pipes of smoke exhauster and air circuit 18 9 2 1Installation of separate pipes of smoke exhauster and air circuit by means of transitional set KHG 714061510 18 9 2 2 Installation of separate pip...

Страница 4: ...operation 39 16 2 2 7 Ionization plug check 39 16 2 2 8 Check of combustion products removal control devices 40 16 2 2 9 Check of CH temperature sensor 40 16 2 2 10 Check of DHW temperature sensor 40...

Страница 5: ...and doors in order to ventilate the premise providing maximum fresh air inlet 3 Do not use electric appliances in order to avoid the appearance of spark 4 Do not use the telephone in a gas polluted pr...

Страница 6: ...r T 25 l min 14 0 Temperature regulation range Operating water pressure MPa 0 02 0 60 Minimal water pressure min MPa 0 015 Maximum water pressure max at water heat expansion pressure must not exceed t...

Страница 7: ...d connection dimensions A CH outlet G3 4 B DHWoutlet G1 2 C gas inlet G3 4 D cold water inlet G1 2 E CH inlet G3 4 reverse F safety valve tap 16 18 mm Scheme 1 Overall and connection dimensions of the...

Страница 8: ...e 6 boiler control buttons The designation of the control buttons and of the symbols shown on display are represented in the tables 2 and 3 respectively 3 2 Boiler operation modes The boiler can opera...

Страница 9: ...s flickering and the symbol is glowing If hot water is used the boiler automatically switches to the DHW mode the symbol is glowing and the symbol is flickering 3 2 4 Heating mode In the heating mode...

Страница 10: ...case of the boiler s operation during the heating season once a day it is necessary to Make sure that there are no highly flammable objects next to the boiler or next to the smoke exhausters Make sure...

Страница 11: ...gas appliances installation The boiler is designed for heating water to the temperature lower than the boiling point at atmospheric pressure The boiler should be connected to the heating system and al...

Страница 12: ...01 2003 and Regulations of fire safety of Russian Federation PPB 01 03 in accordance with p 4 2 7 4 2 10 and 4 2 11 SP 41 108 2004 the boiler installation should be provided in the following condition...

Страница 13: ...570 0 87 standard The earth conductor is connected to the earth screw on the boiler s bottom panel marked with the symbol by one end and by the other end to the earth loop of the premise where the boi...

Страница 14: ...sists of details 7 8 9 see Scheme 7 The smoke exhauster connector 7 is installed onto the central orifice on the upper surface of the boiler and is fixed by clip 8 The boiler s construction provides a...

Страница 15: ...previously install the plain washer 4 and then the ring 5 on each screw 6 Make sure that there are seal rings 7 2 pcs placed on the inlet and outlet of the channel separator before further installati...

Страница 16: ...staff manual B B 1 boiler 2 channel separator 3 screw Ph 4 8x60 DIN 7981 4 plain washer 5 3x10 DIN 125 Scheme 10 Channel separator installation scheme 5 ring 005 008 19 2 2 GOST 9833 73 6 seal ring 7...

Страница 17: ...the CH stabilizes at the level of 1 5 bar that will indicate that the air is fully removed The installation of additional air output valves is recommended at the upper points of the heating system for...

Страница 18: ...he cover plug the rests of heat carrier must be removed from the boilers components you must wipe them 10 also check the boiler connection to the AC outlet of the monophase network of alternate curren...

Страница 19: ...rmostat it is necessary to remove the plug wire from the contacts 28 and 29 connector M10 from the room thermostat s connector see Annex III page 66 and place the cables with a terminal strip from the...

Страница 20: ...he TPEB type The sensor is connected to the terminal strip of the room thermostat s connector installed into the connector M10 see Annex III page 66 It is necessary to control that the plug wire is in...

Страница 21: ...it to the heating mode see p 3 2 4 page 10 3 Detect the rated power switching on the gas analysis function see p 13 3 2 page 31 4 Keep the boiler in the heating mode for 1 minute 5 Check gas pressure...

Страница 22: ...eading of the casing s fixation to the front panel 3 Throw open the front panel together with the lid downwards after this remove the casing pulling it upwards and towards yourself 4 Remove the pressu...

Страница 23: ...9 gas supply regulator 10 expansion tank 11 electronic board 12 ignition transformer 113 supply cable 114 pressure sensor 115 thermorelay overheating sensor 116 CH temperature sensor 117 DHWcircuit te...

Страница 24: ...urner block burner 4 Mixing air with gas and providing equable combustion of the gas and air mixture in the combustion chamber Ignition transformer 12 Forming the electric spark on the ignition plug I...

Страница 25: ...meter value on display The symbol on display will start flickering 8 Change the chosen parameter s value pressing the buttons 1 value increase or 2 value reduction In order to increase speed of parame...

Страница 26: ...y to switch off and then switch on the boiler using the button 5 13 4 Boiler s operating logic Launching the boiler in the heating mode occurs if the actual heat carrier temperature in the heating sys...

Страница 27: ...s the 3 way valve 18 to the position for the heating mode As a result the heat carrier from the primary heat exchanger will be directed to the heating system 3 The electronic board supplies voltage to...

Страница 28: ...h 27 its contacts must be opened If the contacts are closed the boiler s launching stops 6 The electronic board provides voltage to the fan s electric motor 28 The fans starts operating it can be hear...

Страница 29: ...3 0 5 mm The ignition transformer is out of order Replace the ignition transformer Electric circuit of the ignition transformer is damaged Check the electric circuit and contacts The burner block is c...

Страница 30: ...ier pressure in the CH to the recommended value see p 10 1 page 22 Air lock in the heating system Open the air outlet valve see p 16 2 2 5 page 39 The heat carrier pressure sensor of the CH is out of...

Страница 31: ...eakage Little hot water output or its absence Insufficient inlet DHW water pressure Address to the Housing and Public utilities service Water filter is contaminated Clean the filer on the DHW line Sec...

Страница 32: ...ssary to perform only when the boiler is completely switched off taps on boiler s heat carrier water and gas lines inlets should be closed boiler should be disconnected from the power line 16 1 Techni...

Страница 33: ...stems on air tightness CAUTION Checking of gas joints air tightness is performed by soap solution bubble test or any other safe methods without using open flame sources Appearance of bubbles means gas...

Страница 34: ...ount the smoke exhaust flue pipe back 16 2 2 9 Checking of CH temperature sensor Before switching the boiler on disconnect the cables from the CH heat carrier temperature sensor 16 see p 13 1 page 27...

Страница 35: ...1 see Scheme 16 of casing fastening to the boiler s bottom panel 3 Remove the cap of front panel 4 Unscrew two self threading screws 3 see Scheme 16 and four self threading screws 2 see scheme 16 of...

Страница 36: ...g system 3 Put the burner block off see p 17 1 page 41 4 disconnect cables from the thermo relay 9 see p 13 1 page 27 5 By means of the turnkey 30 unscrew 2 nuts 1 of pipes fastening to the heat excha...

Страница 37: ...carrier out of the boiler see section 10 5 page24 if there are no stop valves drain the heat carrier out of the whole heating system 3 put the casing and sealing cap off from the boiler see p 17 1 pa...

Страница 38: ...le the secondary heat exchanger it is necessary to 1 Switch the boiler on see p 10 4 page 24 2 Close the stop valves at the boiler s inlet and outlet drain the heat carrier out of the boiler see p 10...

Страница 39: ...e body frame 6 Wash and lubricate all details 7 Replace the details that are out of order Assembly is performed in the reverse order 17 6Bypass valve dismantling In order to dismount the bypass valve...

Страница 40: ...ards 18 UTILIZATION Upon completion of using the boiler it is necessary to dismantle it by the following operations 1 Switch the boiler off see p 10 4 page 24 2 Close the heat carrier and water stop v...

Страница 41: ...Gaz NEVALUX 8224 Table 6 1 Wall hung gas boiler NEVALUX 8224 1 pcs 2 User s manual 8224 00 000 01RE 1 ex 3 Boiler s fastening carrier 8223 20 011 1 pcs 4 Dowel SORMAT NAT 10 2 pcs 5 Screw 6 3 50 mm 2...

Страница 42: ...NEVALUX 8624 48...

Страница 43: ...0 01 4 Carrier 8023 01 002 8223 08 000 6 Hydraulic group 10037608005030 7 Burner block 8223 22 000 13 sections nozzles 0 1 31 mm natural gas G20 2nd family group 1 3 kPa 8223 22 000 01 13 sections noz...

Страница 44: ...e sensor JXW 54 14 0 14 mm 29 Nut 8023 01 004 G3 8 30 Gas supply regulator 845 SIGMA 31 Decorative insertion 8023 02 002 32 Pipe 8223 04 000 8224 11 000 33 CHoutlet pipe 8224 05 000 8224 08 000 34 CH...

Страница 45: ...86 2 62 21000606701200 65 Fixture 18 21000607000600 66 Bracket 8 21000607000300 67 Ignition and ionization plugs in assembly 8223 22 060 Hydraulic group components pos 6 Pos Name Designation Note 68...

Страница 46: ...et 21000607000100 79 Bypass pipe 21000606608700 014 mm 80 DHW inlet pipe 21000606606800 014 mm 81 DHW outlet pipe 21000606606700 014 mm 82 Pump pipe 21000606602300 018 mm 84 Pump s fitting 21000605800...

Страница 47: ...g hub 400 325 21000606200300 102 3 way valve stem 21000607400100 103 retainer washer 400 14 21000605900200 104 Ring OR 2 84x2 62 00046240230310 105 Hub 400 25 21000606300100 106 Electric motor s faste...

Страница 48: ...0 Nozzles 0 1 31 mm natural gas G20 2nd family group 1 3 3264 02 130 11 Nozzles 0 0 79 mm Liquefied gas G30 3rd family group 2 9 kPa 3295 07 20 000 11 Nozzles 0 0 79 mm Liquefied gas G30 3rd family gr...

Страница 49: ...e gas supply regulator modulator coil DHW flow sensor pressure sensor Heating temperature sensor cable CBAB0W016 Connecting the heating temperature sensor DHW temperature sensor cable CBAB0W011 Connec...

Страница 50: ...easuring this height in meters we calculate static pressure taking 0 001 MPa of overpressure for each height meter Initial pressure in the expansion tank should be approximately 10 more than calculate...

Страница 51: ...ue Simultaneously you should consider that for the boilers BaltGaz NEVALUX the initial pressure in the expansion tank should be at least 0 1 MP and not more than 0 3 MP Lower pressure can cause the bo...

Страница 52: ...3 l i 13 6 7 l Consequently it is necessary to install additionally a vessel with a volume 7 l On the monograph you should choose the next bigger standard expansion tank with a volume 8 l Selecting an...

Страница 53: ...ensor option 13 room thermostat option 14 CH temperature sensor 15 DHW temperature sensor 16 ionization plug 17 remote control option 18 jumper selecting the type of gas 19 Computer connection connect...

Страница 54: ...90 water overheating sensor 6 17 blue Air pressure switch cable 24 V 10 m 18 brown Air pressure switch 6 15 red Air pressure switch cable 24 V 10 m 16 red Pressure sensor 9 22 black Gas supply regula...

Страница 55: ......

Страница 56: ......

Отзывы: