6
27561,27575_06-11-10
7.) Attach Vertical Mount-R (P8) and Vertical Mount-L (P8) to the Tilt Assembly (P7) as
shown in Illustration # 6. Loosen the two Allen Screws on the side of each Vertical
Mount (P8) and raise the lock lever to allow the mount to hook over the Tilt Assembly
rails. Be sure to tighten these same screws to lock Vertical Mounts to the rails.
Illustration # 6
P8-L
P8-R
P7
Loosen screws
an raise lock lever
Do not use unless all screws are tight. At least every six months, check all screws to be sure
they are tight. If parts are missing, broken, damaged, or worn, stop use of the product
until repairs are made by your dealer using factory authorized parts.
Содержание Lumina Flat Panel Stand
Страница 7: ...7 Lumina Flat Panel Stand...