background image

1

english

The CE Mark verifies that our products meet 

the requirements of the current EU Directive.

BOS R254K-UUI-PR/R_1_-S4

Photoelectric Sensors

About this guide

This manual provides important information for the 

installation and connection of the following sensors with 

analog current and IO-Link interface:
– 

BOS R254K-UUI-PR10-S4

Retroreflective sensor

– 

BOS R254K-UUI-RS10-S4

Through-beam sensor – Emitter

– 

BOS R254K-UUI-RE10-S4

Through-beam sensor – Receiver

– 

BOS R254K-UUI-RH10-S4

Diffuse sensor with adjustable background suppression

– 

BOS R254K-UUI-RH11-S4

Diffuse sensor with adjustable background suppression

Other applicable documents

A comprehensive user’s guide and additional information 

about this product can be found at 

www.balluff.com

 on 

the product page.

Intended use

The BOS photoelectric sensor, together with a machine 

controller (e.g. PLC), comprises a recognition system. It is 

intended to be installed into a machine or system and 

used in the industrial sector.
Proper function according to the specifications in the 

technical data is only assured when the product is used 

solely as described in the user’s guide and the respective 

documents as well as in compliance with the technical 

specifications and requirements and only with suitable 

original Balluff accessories.
Otherwise, there is deemed to be unintended use. 

Unintended use is not permitted and will result in the loss 

of warranty and liability claims against the manufacturer.

Reasonably foreseeable misuse

The product is not intended for the following applications 

and areas and may not be used there:
–  In safety-oriented applications in which personal safety 

depends on the device function

 

– In explosive atmospheres

Display elements

LED 1 (operating status and communication)

Signal

Meaning

Static red

General error

Green alternating 

with LED off at ratio 

of 10:1, 1 s period

IO-Link communication is active. 

The device is ready.

Static green

The device is ready.

LED 2 (indication/warning/teach/ping)

See document 

IO-Link configuration

 under 

www.balluff.com 

on the product page.

Safety notes

Activities such as 

installation

connection

 and 

commissioning

 may only be carried out by qualified 

personnel.

Qualified personnel

 are persons whose technical 

training, knowledge and experience as well as knowledge 

of the relevant regulations allow them to assess the work 

assigned to them, recognize possible hazards and take 

appropriate safety measures.
The 

operator

 is responsible for ensuring that local safety 

regulations are observed.

In particular, the operator must take steps to ensure that a 

defect in the product will not result in hazards to persons 

or equipment.
The product must not be opened, modified or changed. If 

defects and unresolvable faults occur in the product, take 

it out of service and secure against unauthorized use.
This is a LED product of the Free Group (per 

IEC 62471:2006), for which no additional protection 

measures are required. Do not look directly into the light 

beam to avoid temporary irritation to the eyes.

Installation

  CAUTION

Red light

If you look into the light beam emitted by the transmitter, 
temporary blinding and irritation of the eyes is possible.

 

Locate transmitter units so that it is not possible to 
look into the light beam even during operation.

The sensor can be fastened with two M4 screws.

Installation instructions (BOS R254K-…-RS10/ 

RE10-…)

Transmitter and receiver must be optimally aligned for 

good switching characteristic:

1. 

Locate transmitter and receiver and connect to the 

power supply.

2. 

Align transmission beam to the optical axis of the 

receiver.

3. 

Determine switchpoints: Tilt receiver slightly to the left 

and right, then up and down until the yellow display 

LED of the receiver lights up.

4. 

Mount the receiver in the middle of the determined 

switchpoints.

Содержание BOS R254K-UUI-PR10-S4

Страница 1: ...english Installation guide fran ais Notice de montage italiano Istruzioni di montaggio polski Instrukcja monta u BOS R254K UUI PR10 S4 BOS R254K UUI RS10 S4 BOS R254K UUI RE10 S4 BOS R254K UUI RH10 S...

Страница 2: ...Ger t ist bereit Gr n statisch Das Ger t ist bereit LED 2 Indikation Warnung Teach Ping Siehe Dokument IO Link Konfiguration unter www balluff com auf der Produktseite Sicherheitshinweise T tigkeiten...

Страница 3: ...seite Kabell nge F r den IO Link Betrieb betr gt die maximale Kabell nge 20 m Steckerabgangsrichtung Beispielbild bei Verwendung mit gewinkeltem Steckverbinder Zubeh r Typ A1 A2 X1 X2 RH10 Optische Ac...

Страница 4: ...error Green alternating with LED off at ratio of 10 1 1 s period IO Link communication is active The device is ready Static green The device is ready LED 2 indication warning teach ping See document I...

Страница 5: ...ble length For IO Link operation the maximum cable length is 20 m Plug outlet direction Example image of use with angled connector accessory Type A1 A2 X1 X2 RH10 Optical axis of emitter Optical axis...

Страница 6: ...1 p riode de 1 s La communication IO Link est active L appareil est pr t Vert statique L appareil est pr t LED 2 Indication Avertissement Apprentissage Ping Voir le document Configuration IO Link sous...

Страница 7: ...produit Longueur de c ble Pour le mode IO Link la longueur maximale de c ble est de 20 m Sens de d part du connecteur exemple d illustration en cas d utilisation avec connecteur coud accessoire Type A...

Страница 8: ...to Luce verde fissa Apparecchio pronto LED 2 Indicazione Warning Teach Ping Vedere documento Configurazione IO Link all indirizzo www balluff com pagina Prodotti Avvertenze di sicurezza Attivit quali...

Страница 9: ...all indirizzo www balluff com pagina Prodotti Lunghezza cavo Per il funzionamento IO Link la lunghezza massima del cavo di 20 m Direzione di uscita connettore immagine esemplificativa per utilizzo di...

Страница 10: ...d wiecenie w kolorze zielonym na zmian z wy czeniem LED w stosunku 10 1 okres 1 s Komunikacja IO Link jest aktywna Urz dzenie jest gotowe Ci g e wiecenie w kolorze zielonym Urz dzenie jest gotowe LED...

Страница 11: ...cji IO Link na www balluff com na stronie produktu D ugo przewodu Maksymalna d ugo przewod w dla trybu IO Link wynosi 20 m Kierunek wyj cia wtyczki Ilustracja przyk adowa w przypadku zastosowania z k...

Страница 12: ...hengshan Rd 8F Building A Yunding International Commercial Plaza 200125 Pudong Shanghai Phone 86 400 820 0016 Fax 86 400 920 2622 service cn balluff com cn DACH Service Center Germany Balluff GmbH Sch...

Отзывы: