Capacitive Proximity Switches BCS R08RRE…
www.balluff.com
english
5
Electrical connection
IO-Link configuration
Conventional configuration
Plug diagram M12 Plug diagram M8
Signals
Pin
Color
Signal
1
BN
L+
Supply (positive)
2
WH
DI
Data input
3
BU
L-
Supply (negative)
4
BK
C/Q
Switching output or
communication
®
If possible the teach input DI should be
connected to the negative supply L
–
.
w
For
Smart
LEVEL
devices, the cable must not
be rolled up. If possible, shorten the cable or
wind it up in a meandering pattern.
Installation
Installation location/environment
The device can be installed in any position. Please
observe the data sheet regarding ambient
environmental conditions.
Sensor dimensions
Bracket dimensions