3 Commissioning
The BVRDNET network has been designed to enable simple
commissioning. The network can be connected one “span” at a
time to minimise fault finding. There is no power distributed
around the network and fault finding can be performed with units
switched on.
3.1 C
OPPER
N
ETWORK
(
USING
BVRDCIF
MODULES
)
3.1.1 “Local” Network connection
Before connecting the site wiring to the BVRDCIF ensure there
are no shorts between the site wiring conductors, and ensure
there are no shorts to earth.
Connect the site wiring to the BVRDCIF, ensuring the
connections match the screen printed colour codes.
If the site cabling does not match the colour codes then
note the
relevant connection details
.
Ensure the “Local” BVRD2M/4 is switched on and the network is