![Baldor GLC10 Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/baldor/glc10/glc10_installation-and-operating-manual_3577857069.webp)
Operation 4‐29
MN2408
Engine Temperature & Oil Pressure Calibration
To accurately calibrate the controller's temperature sensor, an external temporary engine mounted
temperature gauge is required. The external temperature gauge should be connected as close as possible
to the temperature sender.
To accurately calibrate the controller's pressure sensor, an external temporary engine mounted pressure
gauge is required. The external pressure gauge should be connected as close as possible to the pressure
sender.
ENGINE TEMP
127 95
5
C
Displays the type of calibration function.
Displays the calibration correction factor number (0-255) used to obtain the correct Temperature or Pressure reading.
Displays the actual temperature or pressure measurement shown on the display menus.
This reading may be calibrated higher or lower by changing the correction factor number.
Engine Temperature
The engine temperature analog circuit must be calibrated with the engine temperature sender mounted on the engine.
Connect a temporary engine mounted temperature gauge of suitable accuracy and start the engine. After the engine
reaches normal operating temperature, enter the programming mode and scroll to the “Engine Temperature Offset”
calibration point. Use the INCREMENT or DECREMENT push-buttons to adjust the correction factor number while
observing the displayed temperature. Adjust the correction factor number to obtain the identical temperature reading as
measured with the external temperature gauge. With the correct temperature displayed, press the “Enter” push-button to
accept the correction factor number. Record the correction factor on the programming sheet for future reference.
Oil Pressure
Connect a temporary engine mounted pressure gauge of suitable accuracy and start the engine. After the engine
reaches normal operating pressure and temperature, enter the programming mode and scroll to the “Engine Pressure
Offset” calibration point. Use the INCREMENT or DECREMENT push-buttons to adjust the correction factor number
while observing the displayed pressure. Adjust the correction factor number to obtain the identical pressure reading as
measured with the external pressure gauge. With the correct pressure displayed, press the “Enter“ push-button to
accept the correction factor. Record the correction factor on the programming sheet for future reference.
Engine
Temperature
Sender
Resistance
Oil
Pressure
Sender
Resistance
5
F
5
C
Ohms
KPA
PSI
Ohms
392
200
20
1034
150
38
374
190
24
965
140
42
356
180
28
896
130
48
338
170
33
827
120
54
320
160
39
758
110
62
302
150
46
689
100
70
284
140
55
621
90
79
266
130
65
552
80
89
248
120
76
483
70
101
230
110
90
414
60
114
212
100
106
345
50
127
194
90
147
276
40
142
176
80
197
207
30
160
150
70
290
138
20
183
140
60
426
69
10
206
122
50
622
104
40
952
86
30
1486
68
20
2322
50
10
3644
32
0
6284
Note:
Sender resistance data shown are for Oil Pressure Sender p/n-003654 (Thompson p/n), Manufacturer- Datcon, p/n
102227. Datcon Sender must be used with MEC software version 1.81 or greater (previous software versions cannot be
used).
Содержание GLC10
Страница 12: ...2 2 General Information MN2408...
Страница 24: ...2 14 General Information MN2408...
Страница 40: ...3 16 Receiving Installation MN2408...
Страница 58: ...4 18 Operation MN2408 Figure 4 15 Engine Controller Inputs Outputs...
Страница 70: ...4 30 Operation MN2408 Figure 4 16 Configuration Data Sheet j j j j j j j j j...
Страница 74: ...4 34 Operation MN2408...
Страница 88: ...A 10 Series GLC MN2408...
Страница 90: ...B 2 Series GLC MN2408 Figure B 11 Customer Interface Connection Diagram MEC20 MEC2...
Страница 91: ...Series GLC B 3 MN2408 Figure B 12 Customer Interface w o Breaker Power Connection Diagram...
Страница 92: ...B 4 Series GLC MN2408 Figure B 13 Single Phase w o Breaker Connection Diagram...
Страница 93: ...Series GLC B 5 MN2408 Figure B 14 Single Phase One Breaker Connection Diagram...
Страница 94: ...B 6 Series GLC MN2408 Figure B 15 Single Phase Two Breaker Connection Diagram...
Страница 95: ...Series GLC B 7 MN2408 Figure B 16 Single Phase Connection Diagram Wire 1 0 and Larger w Breaker...
Страница 96: ...B 8 Series GLC MN2408 Figure B 17 Single Phase Connection Diagram Wire 1 0 and Smaller w Breaker...
Страница 97: ...Series GLC B 9 MN2408 Figure B 18 Single Phase Connection Diagram Wire 1 0 and Smaller w o Breaker...
Страница 98: ...B 10 Series GLC MN2408 Figure B 19 Single Phase Connection Diagram Wire Larger than 1 0 w o Breaker...
Страница 99: ...Series GLC B 11 MN2408 Figure B 20 Three Phase Connection Diagram...
Страница 100: ...B 12 Series GLC MN2408 Figure B 21 Three Phase Connection Diagram with PMG...
Страница 101: ...Series GLC B 13 MN2408 Figure B 22 Three Phase Connection Diagram Wire 1 0 and larger...
Страница 102: ...B 14 Series GLC MN2408 Figure B 23 Three Phase Connection Diagram Wire Larger than 1 0 w Breaker...
Страница 103: ...Series GLC B 15 MN2408 Figure B 24 Three Phase Connection Diagram Wire 1 0 and Smaller w Breaker...
Страница 104: ...B 16 Series GLC MN2408 Figure B 25 Three Phase Connection Diagram Wire Larger than 1 0 w o Breaker...
Страница 105: ...Series GLC B 17 MN2408 Figure B 26 Three Phase Connection Diagram Wire 1 0 and Smaller w o Breaker...
Страница 106: ...B 18 Series GLC MN2408 Figure B 27 Control Box Connections with MEC20 Controller...
Страница 107: ...Series GLC B 19 MN2408 Figure B 28 Control Box Connections with MEC20 Controller Governor...
Страница 108: ...B 20 Series GLC MN2408 Figure B 29 Control Box Connections with MEC2 Controller...
Страница 109: ...Series GLC B 21 MN2408 Figure B 30 Engine Wiring Woodward 4 3L GM...
Страница 110: ...B 22 Series GLC MN2408 Figure B 31 Engine Wiring Woodward 5 7L GM...
Страница 111: ...Series GLC B 23 MN2408 Figure B 32 Engine Wiring Woodward 8 1L GM...
Страница 112: ...B 24 Series GLC MN2408...
Страница 113: ...Baldor District Offices...